- Library Home /
- Search Collections /
- Open Collections /
- Browse Collections /
- International Conference on Applications of Statistics and Probability in Civil Engineering (ICASP) (12th : 2015) /
- Life cycle cost-benefit evaluation of self-centering...
Open Collections
International Conference on Applications of Statistics and Probability in Civil Engineering (ICASP) (12th : 2015)
Life cycle cost-benefit evaluation of self-centering and conventional concentrically braced frames Dyanati, Mojtaba; Huang, Qindan; Roke, David
Abstract
Self-centering concentrically braced frame (SC-CBF) systems have been developed to increase the drift capacity of braced frames prior to structural damage. To achieve the improved seismic performance of SC-CBF system, the construction cost of an SC-CBF is expected to be higher than that of a conventional CBF. In this study, economic effectiveness of using an SC-CBF instead of a CBF in one prototype building is calculated to indicate the time that initial SC-CBF construction costs are compensated by lower earthquake-induced losses in the lifetime of the building (pay-off time). The results of this study show lower business interruption is the most significant component of the economic benefit of the SC-CBF compared to the CBF. Moreover, the pay-off time increases dramatically if the initial construction cost of the SC-CBF is more than 4% higher than the CBF.
Item Metadata
Title |
Life cycle cost-benefit evaluation of self-centering and conventional concentrically braced frames
|
Creator | |
Contributor | |
Date Issued |
2015-07
|
Description |
Self-centering concentrically braced frame (SC-CBF) systems have been developed to increase the drift capacity of braced frames prior to structural damage. To achieve the improved seismic performance of SC-CBF system, the construction cost of an SC-CBF is expected to be higher than that of a conventional CBF. In this study, economic effectiveness of using an SC-CBF instead of a CBF in one prototype building is calculated to indicate the time that initial SC-CBF construction costs are compensated by lower earthquake-induced losses in the lifetime of the building (pay-off time). The results of this study show lower business interruption is the most significant component of the economic benefit of the SC-CBF compared to the CBF. Moreover, the pay-off time increases dramatically if the initial construction cost of the SC-CBF is more than 4% higher than the CBF.
|
Genre | |
Type | |
Language |
eng
|
Notes |
This collection contains the proceedings of ICASP12, the 12th International Conference on Applications of Statistics and Probability in Civil Engineering held in Vancouver, Canada on July 12-15, 2015. Abstracts were peer-reviewed and authors of accepted abstracts were invited to submit full papers. Also full papers were peer reviewed. The editor for this collection is Professor Terje Haukaas, Department of Civil Engineering, UBC Vancouver.
|
Date Available |
2015-05-21
|
Provider |
Vancouver : University of British Columbia Library
|
Rights |
Attribution-NonCommercial-NoDerivs 2.5 Canada
|
DOI |
10.14288/1.0076211
|
URI | |
Affiliation | |
Citation |
Haukaas, T. (Ed.) (2015). Proceedings of the 12th International Conference on Applications of Statistics and Probability in Civil Engineering (ICASP12), Vancouver, Canada, July 12-15.
|
Peer Review Status |
Unreviewed
|
Scholarly Level |
Faculty
|
Rights URI | |
Aggregated Source Repository |
DSpace
|
Item Media
Item Citations and Data
Rights
Attribution-NonCommercial-NoDerivs 2.5 Canada