UBC Stormwater Detention : Detention Facility for UBC CCM Everton, Madeleine; Abdulameer, Mariam; Ong, Felita; Vaags, Eric; Langenberg, Nadia; Di Iorio, Christina
Abstract
This report provides an overview of the project background, the conceptual designs considered, justification of the preferred option and an in depth outline of the final detailed design. In response to the current high risk of flooding to the University of British Columbia (UBC) campus and surrounding residential and First Nations areas, the UBC Social Ecological Economic Development Studies (SEEDS) Sustainability Program has retained Team 10 for the design of a non-traditional, multi-use stormwater management system. A public outdoor learning space was chosen for its overall functionality and minimal maintenance and environmental impact to be the preferred design out of three conceptual designs. Included in this document is the technical analysis, including geotechnical, structural and hydrotechnical components,the framework for an environmental assessment and Indigenous engagement, a project management plan, and a review of stakeholder engagement. A geotechnical review of the site slope stability was completed with attention to the instability of the Point Grey Cliffs in order to determine safe limits for site excavation.This was also taken into account for the design of the structure’s four footings. SAP2000 was used for structural analysis of the outdoor learning space’s roof. A hydrological site analysis was conducted using past site evaluations as well as EPA SWMM to obtain a solid understanding of the current conditions and stormwater drainage system. EPA SWMM was used to determine the required water holding capacity in the case of 10 and 100 year storms. An outlet controlled orifice discharge concept was designed to meet the specified maximum discharge rate. Moving forward, a project management plan has been outlined in this report,consisting of construction phasing, and scheduling, a cost estimate and methodology as well as methods of stakeholder engagement. Disclaimer: “UBC SEEDS provides students with the opportunity to share the findings of their studies, as well as their opinions, conclusions and recommendations with the UBC community. The reader should bear in mind that this is a student project/report and is not an official document of UBC. Furthermore readers should bear in mind that these reports may not reflect the current status of activities at UBC. We urge you to contact the research persons mentioned in a report or the SEEDS Coordinator about the current status of the subject matter of a project/report.”
Item Metadata
Title |
UBC Stormwater Detention : Detention Facility for UBC CCM
|
Alternate Title |
Detention Facility for UBC CCM
|
Creator | |
Contributor | |
Date Issued |
2019-04-08
|
Description |
This report provides an overview of the project background, the conceptual designs
considered, justification of the preferred option and an in depth outline of the final detailed
design. In response to the current high risk of flooding to the University of British Columbia
(UBC) campus and surrounding residential and First Nations areas, the UBC Social Ecological
Economic Development Studies (SEEDS) Sustainability Program has retained Team 10 for the
design of a non-traditional, multi-use stormwater management system. A public outdoor
learning space was chosen for its overall functionality and minimal maintenance and
environmental impact to be the preferred design out of three conceptual designs.
Included in this document is the technical analysis, including geotechnical, structural and
hydrotechnical components,the framework for an environmental assessment and Indigenous
engagement, a project management plan, and a review of stakeholder engagement.
A geotechnical review of the site slope stability was completed with attention to the instability
of the Point Grey Cliffs in order to determine safe limits for site excavation.This was also taken
into account for the design of the structure’s four footings. SAP2000 was used for structural
analysis of the outdoor learning space’s roof.
A hydrological site analysis was conducted using past site evaluations as well as EPA SWMM
to obtain a solid understanding of the current conditions and stormwater drainage system. EPA
SWMM was used to determine the required water holding capacity in the case of 10 and 100
year storms. An outlet controlled orifice discharge concept was designed to meet the specified
maximum discharge rate.
Moving forward, a project management plan has been outlined in this report,consisting of
construction phasing, and scheduling, a cost estimate and methodology as well as methods of
stakeholder engagement. Disclaimer: “UBC SEEDS provides students with the opportunity to share the findings of their studies, as well as their opinions, conclusions and recommendations with the UBC community. The reader should bear in mind that this is a student project/report and is not an official document of UBC. Furthermore readers should bear in mind that these reports may not reflect the current status of activities at UBC. We urge you to contact the research persons mentioned in a report or the SEEDS Coordinator about the current status of the subject matter of a project/report.”
|
Subject | |
Genre | |
Type | |
Language |
eng
|
Series | |
Date Available |
2019-12-10
|
Provider |
Vancouver : University of British Columbia Library
|
Rights |
Attribution-NonCommercial-NoDerivatives 4.0 International
|
DOI |
10.14288/1.0387003
|
URI | |
Affiliation | |
Peer Review Status |
Unreviewed
|
Scholarly Level |
Undergraduate
|
Rights URI | |
Aggregated Source Repository |
DSpace
|
Item Media
Item Citations and Data
Rights
Attribution-NonCommercial-NoDerivatives 4.0 International