Abstract
This report outlines the detailed redesign of the intersection at Chancellor Boulevard and East Mall, at the University of British Columbia. The current intersection does not promote safety, user friendliness, nor does it meet the future anticipated traffic demand of the growing UBC campus. The new intersection design aims at mitigating these issues by placing a roundabout at the intersection. Meanwhile, at the southeast corner of the intersection, a pedestrian lookout platform was designed and detailed within the report. The report begins with discussing the project background information and overarching objectives. It then examines the technical standards governing the design, the software programs used, and the final detailed parameters of the design components. Lastly, the report concludes by presenting the refined cost estimates, construction schedule, work sequence, and additional environmental, stormwater, and First Nations considerations. The new roundabout shall replace the current two-way stop-controlled intersection, creating a safer and more disciplined travelling environment for its users. The City of Vancouver predicted that by 2030, over 66% of city’s transportation would be through sustainable transport, hence the roundabout has been designed for not only regular drivers, but also the rapidly growing number of pedestrians, cyclists and public transit users. The pedestrian lookout platform near the intersection will serve as an iconic landmark and provide an inviting gateway into the UBC campus. It has been designed to offer full wheelchair accessibility and optimum safety during any severe storm or seismic events. In addition, the consultant also investigated the existing stormwater management strategies in this region, and detected potential risks of flooding and cliff erosion on the north perimeter of the campus. In response, it is highly recommended that a subterranean detention tank along with perforated drainage pipes be installed directly east of the intersection. Project construction is set to begin on May 2nd 2016 and will extend until August 18th 2016. A detailed construction schedule and work required are presented in the report, as well as a phased traffic management plan (sensitive to high traffic events). Overall, the roundabout is expected to cost $980,140, and the pedestrian platform, $362,250. Disclaimer: “UBC SEEDS provides students with the opportunity to share the findings of their studies, as well as their opinions, conclusions and recommendations with the UBC community. The reader should bear in mind that this is a student project/report and is not an official document of UBC. Furthermore readers should bear in mind that these reports may not reflect the current status of activities at UBC. We urge you to contact the research persons mentioned in a report or the SEEDS Coordinator about the current status of the subject matter of a project/report.”
Item Metadata
Title |
UBC Chancellor Boulevard & East Mall Intersection Redesign
|
Alternate Title |
Detailed Design Report : UBC Chancellor Boulevard & East Mall Intersection Redesign
|
Creator | |
Contributor | |
Date Issued |
2016-04-08
|
Description |
This report outlines the detailed redesign of the intersection at Chancellor Boulevard and East
Mall, at the University of British Columbia. The current intersection does not promote safety,
user friendliness, nor does it meet the future anticipated traffic demand of the growing UBC
campus. The new intersection design aims at mitigating these issues by placing a roundabout at
the intersection. Meanwhile, at the southeast corner of the intersection, a pedestrian lookout
platform was designed and detailed within the report. The report begins with discussing the
project background information and overarching objectives. It then examines the technical
standards governing the design, the software programs used, and the final detailed parameters of
the design components. Lastly, the report concludes by presenting the refined cost estimates,
construction schedule, work sequence, and additional environmental, stormwater, and First
Nations considerations.
The new roundabout shall replace the current two-way stop-controlled intersection, creating a
safer and more disciplined travelling environment for its users. The City of Vancouver predicted
that by 2030, over 66% of city’s transportation would be through sustainable transport, hence the
roundabout has been designed for not only regular drivers, but also the rapidly growing number
of pedestrians, cyclists and public transit users.
The pedestrian lookout platform near the intersection will serve as an iconic landmark and
provide an inviting gateway into the UBC campus. It has been designed to offer full wheelchair
accessibility and optimum safety during any severe storm or seismic events.
In addition, the consultant also investigated the existing stormwater management strategies in
this region, and detected potential risks of flooding and cliff erosion on the north perimeter of the
campus. In response, it is highly recommended that a subterranean detention tank along with
perforated drainage pipes be installed directly east of the intersection.
Project construction is set to begin on May 2nd 2016 and will extend until August 18th 2016. A
detailed construction schedule and work required are presented in the report, as well as a phased
traffic management plan (sensitive to high traffic events). Overall, the roundabout is expected to
cost $980,140, and the pedestrian platform, $362,250. Disclaimer: “UBC SEEDS provides students with the opportunity to share the findings of their studies, as well as their opinions, conclusions and recommendations with the UBC community. The reader should bear in mind that this is a student project/report and is not an official document of UBC. Furthermore readers should bear in mind that these reports may not reflect the current status of activities at UBC. We urge you to contact the research persons mentioned in a report or the SEEDS Coordinator about the current status of the subject matter of a project/report.”
|
Genre | |
Type | |
Language |
eng
|
Series | |
Date Available |
2017-03-07
|
Provider |
Vancouver : University of British Columbia Library
|
Rights |
Attribution-NonCommercial-NoDerivatives 4.0 International
|
DOI |
10.14288/1.0343076
|
URI | |
Affiliation | |
Campus | |
Peer Review Status |
Unreviewed
|
Scholarly Level |
Undergraduate
|
Rights URI | |
Aggregated Source Repository |
DSpace
|
Item Media
Item Citations and Data
Rights
Attribution-NonCommercial-NoDerivatives 4.0 International