Life cycle assessment of Georgia and Dunsmuir viaduct Dennert, Katherine; Plant, Sherwood
Abstract
This study sought to provide a baseline comparison point to the City of Vancouver for the construction of the Georgia and Dunsmuir viaducts, as well as an approximation of several of the end of life options that are possible. This is accomplished by doing a quantity takeoff of the viaducts using a combination of OnScreen Takeoff and Excel. The volumes developed from this were then modelled in Athena Impact Estimator in order to determine the net impact of the construction of the viaducts. In order to model the end of life options of the viaducts were considered; Greenway or Cut and Haul removal. Based on approximated models, Cut and Haul removal was found to have the lower environmental impact. The results should be considered preliminary due to the lack of information, LCA tools available and time constraints to complete a more detailed analysis. Further analysis is recommended to validate the material quantities and develop models of more detailed end of life scenarios. Disclaimer: “UBC SEEDS provides students with the opportunity to share the findings of their studies, as well as their opinions, conclusions and recommendations with the UBC community. The reader should bear in mind that this is a student project/report and is not an official document of UBC. Furthermore readers should bear in mind that these reports may not reflect the current status of activities at UBC. We urge you to contact the research persons mentioned in a report or the SEEDS Coordinator about the current status of the subject matter of a project/report.”
Item Metadata
Title |
Life cycle assessment of Georgia and Dunsmuir viaduct
|
Creator | |
Contributor | |
Date Issued |
2012-04-03
|
Description |
This study sought to provide a baseline comparison point to the City of Vancouver for the construction
of the Georgia and Dunsmuir viaducts, as well as an approximation of several of the end of life options
that are possible. This is accomplished by doing a quantity takeoff of the viaducts using a combination
of OnScreen Takeoff and Excel. The volumes developed from this were then modelled in Athena Impact
Estimator in order to determine the net impact of the construction of the viaducts. In order to model
the end of life options of the viaducts were considered; Greenway or Cut and Haul removal. Based on
approximated models, Cut and Haul removal was found to have the lower environmental impact. The
results should be considered preliminary due to the lack of information, LCA tools available and time
constraints to complete a more detailed analysis. Further analysis is recommended to validate the
material quantities and develop models of more detailed end of life scenarios. Disclaimer: “UBC SEEDS provides students with the opportunity to share the findings of their studies, as well as their opinions, conclusions and recommendations with the UBC community. The reader should bear in mind that this is a student project/report and is not an official document of UBC. Furthermore readers should bear in mind that these reports may not reflect the current status of activities at UBC. We urge you to contact the research persons mentioned in a report or the SEEDS Coordinator about the current status of the subject matter of a project/report.”
|
Genre | |
Type | |
Language |
eng
|
Series | |
Date Available |
2014-07-22
|
Provider |
Vancouver : University of British Columbia Library
|
Rights |
Attribution-NonCommercial-NoDerivs 2.5 Canada
|
DOI |
10.14288/1.0108567
|
URI | |
Affiliation | |
Campus | |
Peer Review Status |
Unreviewed
|
Scholarly Level |
Undergraduate
|
Rights URI | |
Aggregated Source Repository |
DSpace
|
Item Media
Item Citations and Data
Rights
Attribution-NonCommercial-NoDerivs 2.5 Canada