- Library Home /
- Search Collections /
- Open Collections /
- Browse Collections /
- British Columbia Mine Reclamation Symposium /
- The flooded tailings impoundment at the Equity Silver...
Open Collections
British Columbia Mine Reclamation Symposium
The flooded tailings impoundment at the Equity Silver mine Price, W.A.; Aziz, M.
Abstract
The Equity Silver Mine operated between 1980 and 1994, producing silver, gold, and copper from three open pits and a small underground operation. Mine components include a flooded tailings impoundment constructed from till, and waste and quarried rock. This paper describes the initial design and subsequent performance of the flooded tailings impoundment. Materials disposed in the tailings impoundment include tailings, lime treatment sludge, cyanide and acidic drainage.
Item Metadata
Title |
The flooded tailings impoundment at the Equity Silver mine
|
Creator | |
Contributor | |
Date Issued |
2012
|
Description |
The Equity Silver Mine operated between 1980 and 1994, producing silver, gold, and copper
from three open pits and a small underground operation. Mine components include a flooded
tailings impoundment constructed from till, and waste and quarried rock. This paper describes the
initial design and subsequent performance of the flooded tailings impoundment. Materials
disposed in the tailings impoundment include tailings, lime treatment sludge, cyanide and acidic
drainage.
|
Subject | |
Genre | |
Type | |
Language |
eng
|
Date Available |
2012-10-18
|
Provider |
Vancouver : University of British Columbia Library
|
Rights |
Attribution-NonCommercial-NoDerivatives 4.0 International
|
DOI |
10.14288/1.0042636
|
URI | |
Affiliation | |
Peer Review Status |
Unreviewed
|
Scholarly Level |
Other
|
Copyright Holder |
British Columbia Technical and Research Committee on Reclamation
|
Rights URI | |
Aggregated Source Repository |
DSpace
|
Item Media
Item Citations and Data
Rights
Attribution-NonCommercial-NoDerivatives 4.0 International