Open Collections

Rainbow Ranche Collection

Minutes from meeting of the Trustees of the Winfield and Okanagan Centre Irrigation District, September… Trustees of the Winfield and Okanagan Centre Irrigation District Sep 30, 1941

Item Metadata

Download

Media
rainbow-1.0357793.pdf
Metadata
JSON: rainbow-1.0357793.json
JSON-LD: rainbow-1.0357793-ld.json
RDF/XML (Pretty): rainbow-1.0357793-rdf.xml
RDF/JSON: rainbow-1.0357793-rdf.json
Turtle: rainbow-1.0357793-turtle.txt
N-Triples: rainbow-1.0357793-rdf-ntriples.txt
Original Record: rainbow-1.0357793-source.json
Full Text
rainbow-1.0357793-fulltext.txt
Citation
rainbow-1.0357793.ris

Full Text

 o
^*Y
WINFIELD AND OKANAGAN CENTRE
IRRIGATION DISTRICT
R. R. No. i.
KELOWNA. B.C.
Sept 30th 1941
This is a record of a series of meetings held by the Truatees of the
above Distriot* to discuss the proposed Dam at Beaver Lake*
First the Trustees met at the home of the Secretary* Sept 8th.1941
Present Mr Seaton in the Chair,Messrs Fall ow,Groldie*Huy ens and
Constable.
After a long discussion it was decided to wait until Mr MoEougall
has submitted his plans.that these plans be submitted to Mr Penfold,
and if they appear possible we then proceed to negooiate with the
O.K.Centre Power and Irrigation Co for the oonstuuotion of the Dam*
Another Meeting was held on Sept 15th,all present excepting Mr Fallc
Mr Seaton being in the Chair,this meeting was at the Home of the
Again a very long discussion ensued over the proposed Dam,it was
pointed out that the weather had not been good and did not appear to
be getting any better,also that snow had fallen in the vioinity of
the proposed Dam*
Therefor it was decided that in vieu of this it was not advisable
to start any work this year,and that Mr Seaton see Mr Penfold and
see what means we should have to take re delay of eommenoeing work
on this project*
It was also decided that as many as possible of the Trustees ace
Mr Marshall (Manager for the Company; the next day and see what his
vieus were on the subject*
At this meeting certain accounts were ordered to. be paid,viz
Seo Salary July and Aug       25-00
Spurrier Journal etc 5-05
Kelowna Courier Advert B.Lake   5-&0
Three Trustees met at the Centre on the l6th.Mr 0oldie,Mr Huyens and
Mr Constable.
After a talk with Mr Marshall he agreed that in vieu of everything
it would be as well to put off doing anything re building of new
Dam this season*
Sinoe this Meeting Mr Seaton has seen Mr Penfold who has advised
writing Mr Davis the Comptroller asking for a years extension of
time to oommenoe work on the proposed new dam,your Sec has written
asking for this extension and will let. you know the result as soon
as possible*
Walter.J.Coe* Secretary
Chairman*

Cite

Citation Scheme:

        

Citations by CSL (citeproc-js)

Usage Statistics

Share

Embed

Customize your widget with the following options, then copy and paste the code below into the HTML of your page to embed this item in your website.
                        
                            <div id="ubcOpenCollectionsWidgetDisplay">
                            <script id="ubcOpenCollectionsWidget"
                            src="{[{embed.src}]}"
                            data-item="{[{embed.item}]}"
                            data-collection="{[{embed.collection}]}"
                            data-metadata="{[{embed.showMetadata}]}"
                            data-width="{[{embed.width}]}"
                            async >
                            </script>
                            </div>
                        
                    
IIIF logo Our image viewer uses the IIIF 2.0 standard. To load this item in other compatible viewers, use this url:
http://iiif.library.ubc.ca/presentation/cdm.rainbow.1-0357793/manifest

Comment

Related Items