Open Collections

Rainbow Ranche Collection

Document from Boston-Okanagan Apple Company, July 12, 1930 Boston-Okanagan Apple Company Jul 12, 1930

Item Metadata

Download

Media
rainbow-1.0357639.pdf
Metadata
JSON: rainbow-1.0357639.json
JSON-LD: rainbow-1.0357639-ld.json
RDF/XML (Pretty): rainbow-1.0357639-rdf.xml
RDF/JSON: rainbow-1.0357639-rdf.json
Turtle: rainbow-1.0357639-turtle.txt
N-Triples: rainbow-1.0357639-rdf-ntriples.txt
Original Record: rainbow-1.0357639-source.json
Full Text
rainbow-1.0357639-fulltext.txt
Citation
rainbow-1.0357639.ris

Full Text

 BCBTGN-OKAHOaiH APPLE COMPANY
Cost of Pumping Water from. Okanogaa River
July IS, 1930
COST OF PLANT:
Coat of first unit installed in 1920 $ 10,795.87
Cost of second "     »    * 1929 15,907*97
Total cost of plant 24,701#S*
Basis:
6 cubic feet of water per second or 12 acre feet per 24 hours, one-half
of which is used on lor;er bench and one-half on upper bench.
Length of irrigation season 150 days naking a total of 1,800 acre feet of
water pumped during the irrigation season*
Pumping Costs to Upper Bench*
Highest point 580 feet above river*
Depreciation}    20$ #    3,860.98
Interest on investment:    8$ 1,544.43
Power Cost 7,471.05
Cost of Operator  587.50
Cost pumping 900 A* F, to Upper Bench 15,215.96""
Cost per acre foot 14.68
.NOTE;    Depreciation and interest is computed on one-half of the investment
made in 1926 plus all of the investment made in 1929.    Power cost is one*
half of amount of rlTer pump plus all of the booster pimp.    One-half of
the cost of the operator is charged.
Pumping Cost to Lower Bench.
Highest point 350 feet above river.
Depreciations, ft   2,158*77
Xnterst on Investment?  2 863.51
Bower Cost                V++C+, 4,439.75
Cost of Operator        4- 387.50
Cost pumping 900 Aa Fa to Lower Bench 7, 849.53
Cost per acre foot 8.72
NOTE:    Interest and depreciation of the above is computed on the investment
in 1926.    Power cost is one-half of the cost of power for rL ver pump.    One*
half of operators cost.    If, fcawever, interest and depreciation had been
computed on one-half of the 1926 investment, only, the cost per acre foot
would be #7*04.
Average Cost one—half of water to Upper and one-half to Lower.
Depreciation %   4,969.13
Interest on investment 1,976.14
Power Cost 11,910.80
Cost of Operator 675.00
Cost pumping 1,800 acre feet 19,551.07
Cost per acre foot 10.85 ■D8TC»W)KAR0aJBI J
Cost of Punning Water frd
Jtoly 12, 190
fRS OHIPAlf
* Okanogan River
OOSt OF -PUMt
Cost of firat unit installed in 1926
Cost of secoff    ■ it « XQS©
Total cost of plant
# 10,793*87
11,907*97
£4,701*84
Basis:
6 cublo feet of water per aeeond or IS aero feet per 24 hour©-., one-half
of wfeioli is used on ieiey bench and one-half on upper bench*
Length of irrigation season 150 days naklng a total of 1,600 acre feet of
water* pulped during the irrigation season*
Pumping Costs to Upper Bench*
Highest point 580 feet above river*
Sejreciatlon:    gogj
Interest on inveataMfcf    9$
Power Govt
Coat of Operator
■Cost pumping 900 A* ?* to Ujaper Bench
Cost per acre fool
3,360.98
1*544*43
7,471*05
357*50
13,213*96
14*68
NOTE:    IBpre elation and interest is computed on one-half of the investment
made in 1926 plus all of the invo^rtWHifc md© in 1929*   Power ceet is one-
half of amount of rivor pomp plus all of the booster piap.    One-half of
the cost .of the operator ie charged.
Pumping Coat to Lower Bench*
Hlf^ieet point 350 feet above river*
jjepre elation:
laterst on Investment:
Power Coat
Coat of Operator
Cost pimping tOO A* ?• to Lower Bench
Cost peT acre foot
2,188*7?
8§3*-51
4*439-. 75
387*50
^1149*53
8.72
NOTKt    Interest and depreciation of the above is computed on the ia*eetment
in 1926*    pqnt cost la one-half ef the cost of power for ii ver pmp*   0ie«
half ef o erator*s cost*    If, however, interest and depreciation had been
computed on «»e«&&l£ of the 1926 investment* only, the cost per acre foot
would be #7*04*
Average Cost ono-hal*? of water to
to Lower.
Depreetation
Interest on investment
Bower Cost
Cost of Operator
Cost pta»fglitg 1*80© acre feet
Cost ww aero foot
4*969*19
1*976*14
11*910*80
fro* oo
19,531.07
10,85
,*. M
fc-unAs Su$Z 'XJV ^^^j^i^^J^^Mx^^^ j&tw mm*
dMfe ## fa*l% *$&«*** vipe •*• i*s*^l*Siae* #l%ii§*flft
Jon of operaUM f^ 4fi daj^ onjrla« 1926 JtftMf.
total seat * ivm.51
of name tartoiMI HI
ft *0*e feet 4M1whI m
?mm #i«i #•§* «m* s ftett
#$•• |pt» «£f* #*U93
ChMd jpH* iMSivs i&e% e^M&9W*A 46*W
jyi an have ft usewlte awratem ^hioh l# aanooavat fee flimi ah ana
w&ffc aejffieiiut irrl^Ktioii naleF tNi llwte fIgure* 4*9$ tttHptitett irttli
tia§ fcf}?#0i.fi« €« i* will aiWf to mmmmmw to
.4% laHafe#y ftfMt mi tod the psap latttoJlat tn 4&e* ftfft to*
It toe* eaa.taaiy to p«*p £»* tto •**!*» litem tto £u!I»i#g figure*
#&«% «# a$*9*tioa tor «tol« iwiaatlem mmmm
for
*U*S7l.T6
49to #09§ per tore toto 9MhpI toftPfc Imnh
§St weft jnit »» t#- to*e toft peW wm! Tl*#8
If Hat towtotoial m ft#m4 *& a iiiy^n $f H*v ftom aparaHam
tto fttlMU* tUgum mil to *ppro*im**l;7 iiftifl*
mm if is***"*    — --— ■»!«*w»mW.i«» ->~—..- ■ ■ # na&vww
l$el £&&'.$ jjj&& #ejft""" m   «.«.~«     miwwuwte    in uiipiiiiiiiionwiiimiHiMj) mi iMuimi. i«i       lf00&*96
Jfcwt jptoarn epMRrtle&» \ ■* » wn i i in ■ ■ i law-ai i j ■■ m   «
toto'yevtom Jetettl     -
Mat fit to** ft** tatt
mm& imparity **f& witu to wtoel tomm pmm in pa* ef tot t# 1ft
w ^ o   p *^-^ ^ ^
liiife
L_ 

Cite

Citation Scheme:

        

Citations by CSL (citeproc-js)

Usage Statistics

Share

Embed

Customize your widget with the following options, then copy and paste the code below into the HTML of your page to embed this item in your website.
                        
                            <div id="ubcOpenCollectionsWidgetDisplay">
                            <script id="ubcOpenCollectionsWidget"
                            src="{[{embed.src}]}"
                            data-item="{[{embed.item}]}"
                            data-collection="{[{embed.collection}]}"
                            data-metadata="{[{embed.showMetadata}]}"
                            data-width="{[{embed.width}]}"
                            async >
                            </script>
                            </div>
                        
                    
IIIF logo Our image viewer uses the IIIF 2.0 standard. To load this item in other compatible viewers, use this url:
http://iiif.library.ubc.ca/presentation/cdm.rainbow.1-0357639/manifest

Comment

Related Items