The Chung Collection

Chung Logo

The Chung Collection

Princess Patricia survey Canadian Pacific Railway. British Columbia Coast Steamship Service 1969

Item Metadata

Download

Media
chungtext-1.0362817.pdf
Metadata
JSON: chungtext-1.0362817.json
JSON-LD: chungtext-1.0362817-ld.json
RDF/XML (Pretty): chungtext-1.0362817-rdf.xml
RDF/JSON: chungtext-1.0362817-rdf.json
Turtle: chungtext-1.0362817-turtle.txt
N-Triples: chungtext-1.0362817-rdf-ntriples.txt
Original Record: chungtext-1.0362817-source.json
Full Text
chungtext-1.0362817-fulltext.txt
Citation
chungtext-1.0362817.ris

Full Text

 ..7   \
LLOYD'S REGISTER OF SHIPPING
Port o.f...Vane..QUver.,....B...C,
.lQth.^une,...196.3....
1 hlS 1S tO C^ertify that t- have surveyed part of the machinery
of the  S.S.   "PRINCESS PATRICIA" •'6061.58      Gross tons hf Victoria
for  IBS,  ABS,  TS  (CL)S,  Part Continuous Survey of Machinery
and Alterations for conversion to cruise ship
our our We
and that all xtcp recommendations have been carried out to aap> satisfaction,   i
are
iSftfit reporting accordingly and recommending to the Committee of Lloyd's Register
of Shipping that the machinery classification should be retained and the following
survey records assigned W>Q  5-63, ABS 5-63, TS(CL)S 4-63 now and CS
(with date) when the survey has been completed and without
special condition regarding Auxiliary Boiler Tubes.
Parts now examined:—for C.S.
Starboard Main Turbine.
Starboard Main Thrust Block and Shaft.
Port Main Condenser.
No.5 & 6 Shaft Bearings P&S.
Aft Starboard Main L.O. Pump.
Starboard Main Feed Pump.
Sprinkler Pump.
Port Forward O.F. Unit Pump.
Emergency Fire & Bilge Pump.
Port Forward Main Circulating Pump.
Port Outboard extraction pump.
Steering Machinery.
Fire Extinguishing Arrangements.
Starboard Turbo Generator in its entirety.
Sea Valves.
Starboard Main Propulsion alternator, motor & exciter with air coolers.
Megger test of electrical installation.
J/.i.,...STEWART...3nd...D..,....McKIM.QN...
Surveyor to Lloyd's Register of Shipping
ABS Auxiliary Boiler Survey MBS
CSM Continuous Survey of Machinery OF
DBS Donkey Boiler Survey SGS
ES Engine Special Survey SPS
KEY TO ABBREVIATIONS
Main Boiler Survey
Fitted for oil fuel (date) FP above 150° F.
Steam Generator Survey
Steampipe Survey
TS Tailshaft Survey
TS(CL) Tailshaft Survey—Continuous Liner
TSN       Tailshaft renewed
TS(OG) Tailshaft Survey—Oil Gland
This Certificate is issued upon the terms of the Rules and Regulations of the Society, which provide that:—
"While the Committees of the Society use their best endeavours to ensure that the functions of the Society are properly executed, it is to be
understood that neither the Society nor any Member of any of its Committees is under any circumstances whatever to be held responsible for any
inaccuracy in any report or certificate issued by the Society or its Surveyors, or in any entry in the Register Book or other publication of the Society,
or for any error of judgment, default or negligence of any of its Committees or any Member thereof, or the Surveyors, or other Officers or Agents
of the Society."
Cert. B.l.   60m,l,62   (made and printed in England.)
 COPY
»    «   >
7      \
XX
LLOYD'S REGISTER OF SHIPPING
Port ftf..flNMc#attttv*..9t«C^.
 i.0M...liaf.t...IfM«..
XhlS IS tO Certify that Bhave surveyed part of the machinery
of the  <*»«  IIIHIHIMH M8P    iftHttll      Gross tons ®# f Ictorit
for I9it £84, 28 (CI»)ff« Ifcr* Costings***! S»rw|> of Mmehteofy
jnmI AXt#r^tions .for o«m*»r#iOfi to $mi## ateif.
oar osm?
«»</ that all W$ recommendations have been carried out to W$ satisfaction.   B
mm
reporting accordingly and recommending to the Committee of Lloyd's Register
of Shipping that the machinery classification should be retained and the following
sum. r&cqrds assienedj** Mil 0§ feH#  **<CLH 4-&3 OO* »M C®
*>oo**X ©osiiitio© *m$»r&tot Mm&X&mf MmXm fufe«#«
Parte wok; examined;—*W &#»#
Starbo*** lala f?srbifi«#
atur&onri Jttla T&rts*fc Sloote «a$ SIm
^ .      fort gain CteritaMMrr*
U      ■*•! * * «»ft Boarlnga !*§,
Aft «t*t%o*r« gal* L.o. Fa*i>.
st«#feo«i*<3 iifcia $*<*$ Punp*
$pr£iifclwr fvwp*
Port Itorwarft @#F» Chit tap*
ftaorgaaoy Wrt ft Bilgo ang$»»
1%-rt tanafd gafo Ciraulatliig tap*
Fort iutfeoorfi «strs«tien puasu
*%*
Flp# Skitawftiititiikf Jdrr«ii«*oat»»
8t8;rt*omrd ttertw 0#»#F&fesr ia tta aatlroty*
Ion faXvao*
fctftifeoturti loto Fropfelaioa altorafttor* a»t*r k traitor oith sir ooolora*
afefgor tout of oiootrioal tw*tali*tieo»
J»A» iftlAISJ aftA £>« HeKXIBfQII
Surveyor to Lloyd's Register of Shipping
ABS Auxiliary Boiler Survey MBS
CSM Continuous Survey of Machinery OF
DBS Donkey Boiler Survey SGS
ES Engine Special Survey SPS
KEY TO ABBREVIATIONS
Main Boiler Survey
Fitted for oil fuel (date) FP above 150° F.
Steam Generator Survey
Steampipe' Survey
TS Tailshaft Survey
TS(CL) Tailshaft Survey—Continuous Liner
TSN       Tailshaft renewed
TS(OG) Tailshaft Survey—Oil Gland
This Certificate is issued upon the terms of the Rules and Regulations of the Society, which provide that:—
"While the Committees of the Society use their best endeavours to ensure that the functions of the Society are properly executed, it is to be
understood that neither the Society nor any Member of any of its Committees is under any circumstances whatever to be held responsible for any
inaccuracy in any report or certificate issued by the Society or its Surveyors, or in any entry in the Register Book or other publication of the Society,
or for any error of judgment, default or negligence of any of its Committees or any Member thereof, or the Surveyors, or other Officers or Agents
of the Society."
Cert. B.l.    120m,4,62   (made and printed in England.)
 /'"X
^
4     <       «
/•~\
 LLOYD'S REGISTER OF SHIPPING
5^59
Port   Seafc1'le> Washington
-tr*
Date   April 29, 1964
This is tO Gertify  that I have surveyed part of the machinery
0f the     S.S.   "PRINCESS PATRICIA" gross tons     6061
for   Docking Survey at Seattle, Wn. on April 28th & 29th 1964
and that all my recommendations have been carried out to my satisfaction.   I
am reporting accordingly and recommending to the Committee of Lloyd's Register
of Shipping that the machinery classification should be retained and the following
survey records assigned      None. Subject to any outstanding condition of
class being dealt with as previously recommended.
Parts now examined:—
Propellers, sea connections and fastenings.
Scupper valves (62) between fwd fire room blkhd.& after e.r. blkhd,
Sea chests and gratings.
Discharge overboard valves (15)
Sea valves: One Grinnel pump suction.
One General service pump suction
One Emergency fire pump suction.
.£^:.dy
Sttr*feyorJ to Lloyd's Register of Shipping
H.J. Caple
ABS Auxiliary Boiler Survey MBS
CSM Continuous Survey of Machinery OF
DBS Donkey Boiler Survey SGS
ES Engine Special Survey SPS
KEY TO ABBREVIATIONS
Main Boiler Survey
Fitted for oil fuel (date) FP above 150° F.
Steam Generator Survey
Steampipe Survey
TS Tailshaft Survey
TS(CL) Tailshaft Survey—Continuous Liner
TSN       Tailshaft renewed
TS(OG) Tailshaft Survey—Oil Gland
This Certificate is issued upon the terms of the Rules and Regulations of the Society, which provide that:—
"While the Committees of the Society use their best endeavours to ensure that the functions of the Society are properly executed, it is to be
understood that neither the Society nor any Member of any of its Committees is under any circumstances whatever to be held responsible for any
inaccuracy in any report or certificate issued by the Society or its Surveyors, or in any entry in the Register Book or other publication of the Society,
or for any error of judgment, default or negligence of any of its Committees or any Member thereof, or the Surveyors, or other Officers or Agents
of the Society."
Cert. B.l.     20m,10,63    (MADE AND PRINTED IN ENGLAND.)
 LLOYD'S REGISTER OF SHIPPING
Port .el.Vans.Q.H.Ye.r, E.g.,
Date T.t.h.M.Qy,... 1.9.64..
1 his is tO Gertify  that I have surveyed part of the machinery
of the S.S. "PRINCESS PATRICIA"       5911      gross tons    of Victoria
for   H3St ABS and part Continuous Survey of Machinery
and that all my recommendations have been carried out to my satisfaction.   I
am reporting accordingly and recommending to the Committee of Lloyd's Register
of Shipping that the machinery classification should be retained and the following
survey records assigned   MBS 3-64 and ABS 3-64 now and CSCwith date) when
the survey has been completed.
Parts now examined:—
A"
Port Main Turbine in its entirety.
Port Main Alternator with air cooler.
Port Main Motor with air cooler.
Port Intermediate Shafts and Bearings.
Starboard Main Condenser.
Port Main Feed Pump.
Starboard Forward Main Circulating Pump.
Port Inner Extraction Pump.
Port Aft M.E. L.O. Pump.
Forward Auxiliary Feed Pump.
Starboard Forward O.F. Unit Purap.
Megger Test of electrical installation.
ABS -  Auxiliary Boiler Survey MBS
CSM      Continuous Survey of Machinery OF
DBS       Donkey Boiler Survey SGS
ES Engine Special Survey SPS
 B«..HcJ<INI!»N.
O \JUJ^>^WWKA^L«W
Surveyor to Lloyd's Register of Shipping
KEY TO ABBREVIATIONS
Main Boiler Survey
Fitted for oil fuel (date) FP above 150° F.
Steam Generator Survey
Steampipe Survey
TS Tailshaft Survey
TS(CL) Tailshaft Survey—Continuous Liner
TSN       Tailshaft renewed
TS(OG) Tailshaft Survey—Oil Gland
This Certificate is issued upon the terms of the Rules and Regulations of the Society, which provide that:—
"While the Committees of the Society use their best endeavours to ensure that the functions of the Society are properly executed, it is to be
understood that neither the Society nor any Member of any of its Committees is under any circumstances whatever to be held responsible for any
inaccuracy in any report or certificate issued by the Society or its Surveyors, or in any entry in the Register Book or other publication of the Society,
or for any error of judgment, default or negligence of any of its Committees or any Member thereof, or the Surveyors, or other Officers or Agents
of the Society."
Cert. B.l.    20m,10,63   (made AND PMNKD IN ENGLAND.)
 copy FOR SHIP
LLOYD'S REGISTER OF SHIPPING
Port lft.lHMNIlft...fltfC>
Date m.im..wmit
1 his is tO Certify  that I have surveyed part of the machinery
of the 1.1* "WKBBS fmmUm      mm     gross tons    *f Victoria
for m®# m «t$ pm ikmmmm sttwgr of mMm?
and that all my recommendations have been carried out to my satisfaction. I
am reporting accordingly and recommending to the Committee of Lloyd's Register
of Shipping that the machinery classification should be retained and the following
survey records assigned   W* $«64 m& Sm &4| ap» Ml OMtftti dlMl **•»
Parte ttozg> examined:—
von £i»ia fastii.» to its mlfwty.
trltb ftlr ostler*
It* alt wotac
mia &w* Ha*
flm Ms 1Mb U»» ftigb
list af #§««fc#t#«l fat
^^^f^^y^
ABS
Auxiliary Boiler Survey
MBS
Main Boiler Survey
CSM
Continuous Survey of Machinery
OF
Fitted for oil fuel (date) FP above 150° F
DBS
Donkey Boiler Survey
SGS
Steam Generator Survey
ES
Engine Special Survey
SPS
Steampipe Survey
Surveyor to Lloyd's Register of Shipping
KEY TO ABBREVIATIONS
TS Tailshaft Survey
TS(CL) Tailshaft Survey—Continuous Liner
TSN       Tailshaft renewed
TS(OG) Tailshaft Survey—Oil Gland
This Certificate is issued upon the terms of the Rules and Regulations of the Society, which provide that:—
"While the Committees of the Society use their best endeavours to ensure that the functions of the Society are properly executed, it is to be
understood that neither the Society nor any Member of any of its Committees is under any circumstances whatever to be held responsible for any
inaccuracy in any report or certificate issued by the Society or its Surveyors, or in any entry in the Register Book or other publication of the Society,
or for any error of judgment, default or negligence of any of its Committees or any Member thereof, or the Surveyors, or other Officers or Agents
of the Society."
Cert. B.l.     40m,10,63    (MADE AND PRINTED IN ENGLAND.)
I
 LLOYD'S REGISTER OF SHIPPING
Port Qf..Vancouyerll...Bf...CJ,
Date 3.0th..Noyember,...19.65,.,
1 his is tO (certify that I have surveyed part of the machinery
of the S.S.  "PRINCESS PATRICIA"      6062        gross tons   of Victoria,   B . C.
for       Part Continuous Survey of Machinery and Alterations.
and that all my recommendations have been carried out to my satisfaction. I
am reporting accordingly and recommending to the Committee of Lloyd's Register
of Shipping that the machinery classification should be retained and the following
survey records assigned C.S.M. 5-65 as previously recommended.
Parts now examined: —
Propellers and fastenings.
Port and Starboard main engine L.O. coolers.
Fore and aft main fuel oil  heaters.
Auxiliary fuel oil heater „
Port and starboard air ejectors.
Port and starboard gland condensers.
Feed heaters.
Emergency 25 K.W. generator Diesel Engine complete.
Emergency generator oil fuel tank.
Main engines tested working and manoeuvring.
ABS Auxiliary Boiler Survey MBS
CSM Continuous Survey of Machinery OF
DBS Donkey Boiler Survey SGS
ES Engine Special Survey SPS
D....McKINN0.N.
C\waikju^^>jy
Surveyor to Lloyd's Register of Shipping
KEY TO ABBREVIATIONS
Main Boiler Survey
Fitted for oil fuel (date) FP above 150° F.
Steam Generator Survey
Steampipe Survey
TS Tailshaft Survey
TS(CL) Tailshaft Survey—Continuous Liner
TSN       Tailshaft renewed
TS(OG) Tailshaft Survey—Oil Gland
This Certificate is issued upon the terms of the Rules and Regulations of the Society, which provide that:—
"The Committees of the Society use their best endeavours to ensure that the functions of the Society are properly executed, but it is to be
understood that neither the Society nor any Member of any of its Committees nor any of its Officers, Servants or Surveyors is under any
circumstances whatever to be held responsible or liable for any inaccuracy in any report or certificate issued by the Society or its Surveyors, or in
any entry in the Register Book or other publication of the Society, or for any act or omission, default or negligence of any of its Committees or
any Member thereof, or of the Surveyors, or other Officers Servants or Agents of the Society."
N.       Cert. B.l.   50m,2,65   (made and printed in enoland.)
 •"^
COPY *     JS
LLOYD'S REGISTER OF SHIPPING
Port e* Vancouver, a. c.
Date 30tft lteiriBab«r« 196S»
I his is tO Certify that I have surveyed part of the machinery
of the S.S. "PitffCESS ftHSICXA*     6062        gross tons ** Victoria. B . C.
for      Part Continuous Survey of Machinery and Alterations.
and that all my recommendations have been carried out to my satisfaction. I
am reporting accordingly and recommending to the Committee of Lloyd's Register
of Shipping that the machinery classification should be retained and the following
survey records assigned C.S.H. 3-65 a* previously recommend*!.
Parts now examined:—
Propellers and fastenings.
Port and Starboard main engine L.O. coolers,
fore and aft main fuel oil heaters*
Auxiliary fuel oil heater .
7, Port m<i starboard air ejectors.
Pert and starboard gland condensers*
Feed heater....
iimergency 23 K.w. generator Diesel Engine complete*
Emergency generator oil fuel tank.
Main engines tested working and manoeuvring.
ABS Auxiliary Boiler Survey MBS
CSM Continuous Survey of Machinery OF
DBS Donkey Boiler Survey SGS
ES Engine Special Survey SPS
0. MeKZNNON
foJXAj^>>~'v-^-'V^-^'OV _
Surveyor to Lloyd's Register of Shipping
KEY TO ABBREVIATIONS
Main Boiler Survey
Fitted for oil fuel (date) FP above 150° F.
Steam Generator Survey
Steampipe Survey
TS Tailshaft Survey
TS(CL) Tailshaft Survey—Continuous Liner
TSN       Tailshaft renewed
TS(OG) Tailshaft Survey—Oil Gland
This Certificate is issued upon the terms of the Rules and Regulations of the Society, which provide that:—
"While the Committees of the Society use their best endeavours to ensure that the functions of the Society are properly executed, it is to be
understood that neither the Society nor any Member of any of its Committees is under any circumstances whatever to be held responsible for any
inaccuracy in any report or certificate issued by the Society or its Surveyors, or in any entry in the Register Book or other publication of the Society,
or for any error of judgment, default or negligence of any of its Committees or any Member thereof, or the Surveyors, or other Officers or Agents
of the Society."
Cert. B.l.   100m,3.64  (made and printed in England.)
 LLOYD'S REGISTER OF SHIPPING
Port of .Vancouver,.. B...C...
Date ^tfe...^?.9RberJl...1966T
We
1 hlS IS tO v^ertity  that XK have surveyed part of the machinery
of thes. S.  "PRINCESS PATRICIA"    6062 gross tons   of Victoria, B.C.
for     Part Continuous Survey of Machinery and Steam Pipe Alterations.
our
our
and that all m# recommendations have been carried out to Xbq> satisfaction.
are
Qilt reporting accordingly and recommending to the Committee of Lloyd's Register
of Shipping that the machinery classification should be retained and the following
survey records assignedCS(with date) when the survey has been completed,   subject
to any conditions at present attached to the vessel's class being dealt with as
previously.
Parts now examined:—
Propellers Port and Starboard.
Fastenings and Gratings.
Sea Connections.
Aft Auxiliary Feed Pump.
Aft Outboard and Inboard Fuel Oil Service Pumps.
Starboard Outboard Extraction Pump.
ABS       Auxiliary Boiler Survey
CSM      Continuous Survey of Machinery       OF
DBS       Donkey Boiler Survey SGS
ES Engine Special Survey SPS
P.,...McKINN0.N...aad...J.wrfA.-STEWA8T-
Surveyor to Lloyd's Register of Shipping
KEY TO ABBREVIATIONS
MBS      Main Boiler Survey
TS
Tailshaft Survey
Fitted for oil fuel (date) FP above 150° F.   TS(CL) Tailshaft Survey—Continuous Liner
Steam Generator Survey TSN       Tailshaft renewed
Steampipe Survey TS(OG) Tailshqft Survey—Oil Gland
This Certificate is issued upon the terms of the Rules and Regulations of the Society, which provide that:—
"The Committees of the Society use their best endeavours to ensure that the functions of the Society are properly executed, but it is to be
understood that neither the Society nor any Member of any of its Committees nor any of its Officers, Servants or Surveyors is under any
circumstances whatever to be held responsible or liable for any inaccuracy in any report or certificate issued by the Society or its Surveyors, or in
any entry in the Register Book or other publication ot the Society, or for any act or omission, default or negligence of any of its Committees or
any Member thereof, or the Surveyors, or other Officers, Servants or Agents of the Society."
Cert. B.l.   80m,9,65   (made and printed in England.)
 X r>CQPY   ~ y,
LLOYD'S kEGISTER OF SHIPPING
Port.
■ «f ■ -Hmtmmv* ■ ■ *»■ • -H* •
Date Mil..f!lMnlMf*..1966»..
■p
This is tO Certify that l&have surveyed part of the machinery
of the g. $, •<*i«lCM» fmm±*   &m       Sross tons   *f ^ietorin. Mi
for     gifegt Cofttiaaoiti Sumray of staafclaaty and »t«a» Pipe ,4tar»Uaaa.
awa1 /Aaf all tMX recommendations have been carried out to W& satisfaction,    ix
ara
reporting accordingly and recommending to the Committee of Lloyd's Register
of Shipping that the machinery classification should be retained and the following
survey records assigned €$(*!tli «f»t#l wftttft ***# c*4Jf¥#f f»»» baa* eaapl*Satf#  aafcjaat
to atfp eowdltlMt lit *>«*«*»% auaekaci t« taa vataal'* iUm t*la0 tfaait **** at
prevlimsly.
Parts now examined:—
$rap,*nm§   art aaa* StatfeoaiKi*
lf**t*«i»ff »«*! Or»ti«it.
Sat Caaaaatiaaa*
Aft A««JU»ry ^eed mu*
Aft oattaara* *»** *»&©**** rati ail borate* «*»?*•.
blMrtMHunl *>«i%aar*t ftstfaatiM Paa*
ABS Auxiliary Boiler Survey MBS
CSM Continuous Survey of Machinery OF
DBS Donkey Boiler Survey SGS
ES Engine Special Survey SPS
l!.:...^.^!!E..*^...^.*..*/..*M»iSf.
Surveyor to Lloyd's Register of Shipping
KEY TO ABBREVIATIONS
Main Boiler Survey TS Tailshaft Survey
Fitted for oil fuel (date) FP above 150" F. TS(CL) Tailshaft Survey—Continuous Liner
Steam Generator Survey TSN       Tailshaft renewed
Steampipe Survey TS(OG) Tailshaft Survey—Oil Gland
This Certificate is issued upon the terms of the Rules and Regulations of the Society, which provide that:—
"The Committees of the Society use their best endeavours to ensure that the functions of the Society are properly executed, but it is to be
understood that neither the Society nor any Member of any of its Committees nor any of its Officers, Servants or Surveyors is under any
circumstances whatever to be held responsible or liable for any inaccuracy in any report or certificate issued by the Society or its Surveyors, or in
any entry in the Register Book or other publication of the Society, or for any act or omission, default or negligence of any of its Committees or
any Member thereof, or of the Surveyors, or other OfHceis, Servants or Agents of the Society "
Cert. B.l;   240m,9,65    (MADE AND PRINTED IN ENGLAND.)
 o
madia/i (faerie
13941
Vancouver, B.C.,
March 1st 1966
H.J. Tumilty, Esq.,
Assistant Superintendent (Engineering),
Victoria, B. C.
Enclosed herewith is Lloydte Register of Shipping
certificate of survey of the "Princess Patricia" on December
30th 1965 concerning examination of the installation of an
additional ventilator trunk to the auxiliary machinery space
in No. 2 Lower Hold.
Also enclosed is Lloyd's Register of Shipping
memorandum of alterations reported since the ship was surveyed
for assignment of Load Lines.
Marine'Superintendent
 o
Rpt.    C.ll    (cont.)
Ship's Name SS/Mx  "PRINCESS  PATRICIA"
PortLos Angeles
o
n
V A
Freeboard
Rpt. No. 257
LLOYD'S REGISTER OF SHIPPING
Ship's Name:  SS "PRINCESS PATRICIA"
Official No. 190663
Memorandum of Alterations reported since ship was surveyed for
assignment of Load Lines.
Now Done:-
New ventilator trunk installed Starboard Side of center line fwd.
end of No. 2 Hold between shell frames 121-122, piercing main deck
and orlop deck.
Size of trunk:  20" dia. x 3/8" thick.
Ventilator coaming on main deck 39" high.
Means of Closing:  Steel bolted cover plate 23" dia. x 1/4",
and suitable canvas cover.
SURVEYOR TO LLOYD'S REGISTER
OF SHIPPING
50m,4,62   (made and printed in England)
 ( )
V.V
LLOYD'S REGISTER OF SHIPPING
Port mS..ANGELESi...CALIFpMIA.
Date 3Q...JAN.yARY..i966.
This is to Certify that i have
6,062
surveyed the   SS "PRINCESS PATRICIA" gross tons     of Victoria
while  she lay afloat at this Port on 30 December  1965  and
subsequently for the purpose of  examining the completion of
the installation of  an additional ventilator trunk to the
auxiliary machinery space in No.   2 Lower Hold
and that I am transmitting to the Committee of Lloyd's Register of
Shipping, London, a report, stating that all repairs recommended by
me have been completed to my satisfaction, also that I am
recommending  that  she  be     retained as  classed.
<^Zd
Surveyor to Lloyd's Register ofShippin
KEY   TO   ABBREVIATIONS
AS Annual Survey
BiS Biennial Survey
DS Docking Survey
NS Cargo Battens not fitted (No Sparring)
SS Hull Special Survey
SS(Dr) Hull Special Survey (Drilling)
SS(M) Hull Special Survey (Modified)
CSH Hull Special Survey (Continuous)
This Certificate is issued upon the terms of the Rules and Regulations of the Society, which provide that:—
"The Committees of the Society use their best endeavours to ensure that the functions of the Society are properly executed, but it is to be
understood that neither the Society nor any Member of any of its Committees nor any of its Officers, Servants or Surveyors is under any circumstances
whatever to be held responsible or liable for any inaccuracy in any report or certificate issued by the Society or its Surveyors, or in any entry in the
Register Book or other publication of the Society, or for any act or omission, default or negligence of any of its Committees or any Member thereof,
or of the Surveyors, or other Officers, Servants or Agents of the Society." iyj_ 7774
N.   Cert. B   80m,9,65   (made and printed in England.)
 COPY
_y
LLOYD'S REGISTER OF SHIPPING
Port ...lM..J^^!^..»J^MMMi..
Date ?*Li^^L*?$!L..
y
This is to Certify that i have
surveyed the   SS "^X$CIS$ MSftf&A" gro'ss t0ns    of Victoria
while she lay afloat at this Fort on 30 December 1965 and
subsequently for the purpose of examining the completion of
the Installation of an additional ventilator trunk to the
auxiliary machinery space In Ho. 2 Lower Hold
{
v. y
and that I am transmitting to the Committee of Lloyd's Register of
Shipping, London, a report, stating that all repairs recommended by
me have been completed to my satisfaction, also that I am
recommending  that  she  be    retained an classed.
Surveyor to Lloyd's Register of Shipping
KEY   TO   ABBREVIATIONS
AS Annual Survey
BiS Biennial Survey
DS Docking Survey
NS Cargo Battens not fitted (No Sparring)
SS Hull Special Survey
SS(Dr) Hull Special Survey (Drilling)
SS(M) Hull Special Survey (Modified)
CSH Hull Special Survey (Continuous)
This Certificate is issued upon the terms of the Rules and Regulations of the Society, which provide that:—
"The Committees of the Society use their best endeavours to ensure that the functions of the Society are properly executed, but it is to be
understood that neither the Society nor any Member of any of its Committees nor any of its Officers, Servants or Surveyors is under any circumstances
whatever to be held responsible or liable for any inaccuracy in any report or certificate issued by the Society or its Surveyors, or in any entry in the
Register Book or other publication of the Society, or for any act or omission, default or negligence of any of its Committees or any Member thereof,
or of the Surveyors, or other Officers, Servants or Agents of the Society." 1^. —.•«.<
N.   Cert. B   240,m,9,65   (made and printed in England.)
 LLOYD'S REGISTER OF SHIPPING
Port of...Vanco Liver...B....C
Date 22.n.d...M.ay,....I9<a6,
1 lllS IS tO V^ertliy  that I have surveyed part of the machinery
of the  S.S. "PRINCESS PATRICIA"        6062     gross tons     of Victoria,  B.C.
for        Main Boiler Survey, Auxiliary Boiler Survey, Screwshaft Survey (Port),
Part Continuous Survey of Machinery and Condition of Class.
and that all my recommendations have been carried out to my satisfaction.    I
am reporting accordingly and recommending to the Committee of Lloyd's Register
of Shipping that the machinery classification should be retained and the following
survey records assigned   MBS 5/66, ABS 5/66, TS(CL)  Port 5/66.  and CSCwith date)
when the survey has been completed and without special condition regarding port
sft main boiler.
Parts now examined:—    For C.S.
Propeller and Fastenings,
Sea Connections.
Port Propulsion Motor.
Port and Starboard Main Condensers.
Starboard Aft Main Circulating Pump.
Port Main Feed Pump.
Fore and Aft General Service Pumps.
Port Forward Lub. Oil Pump.
Port 400 KW Turbo-Generator Engine in its entirety.
Port Steering Gear Hydraulic Pump.
Port end Starboard Lub. Oil Coolers.
ABS Auxiliary Boiler Survey MBS
CSM Continuous Survey of Machinery OF
DBS Donkey Boiler Survey SGS
ES Engine Special Survey SPS
o.....McKmmi...y£ffi
Surveyor to Lloyd's Register of Shipping
KEY TO ABBREVIATIONS
Main Boiler Survey TS Tailshaft Survey
Fitted for oil fuel (date) FP above 150° F. TS(CL) Tailshaft Survey—Continuous Liner
Steam Generator Survey TSN      Tailshaft renewed
Steampipe Survey TS(OG) Tailshaft Survey—Oil Gland
This Certificate is issued upon the terms of the Rules and Regulations of the Society, which provide that:—
"The Committees of the Society use their best endeavours to ensure that the functions of the Society are properly executed, but it is to be
understood that neither the Society nor any Member of any of its Committees nor any of its Officers, Servants or Surveyors is under any
circumstances whatever to be held responsible or liable for any inaccuracy in any report or certificate issued by the Society or its Surveyors, or in
any entry in the Register Book or other publication of the Society, or for any act or omission, default or negligence of any of its Committees or
any Member thereof, or the Surveyors, or other Officers, Servants or Agents of the Society."
Cert. B.l.   80m,9,65   (made and printed in England.)
H
 _ -     COPY
u
LLOYD'S REGISTER OF SKbxfTING
P°rt            ef ¥aaaaa*a** •■•»» •••©*■
Date 32stf-«asr-i9te«	
1 JllS 1S tO v>»Crtify  that I have surveyed part of the machinery
of the    S#S, «mmm> ?attlC*a*       *Q*2   gross tons      «>* ¥ iatarla. S.€.
for tiftjUl boiler Harvey, axillary INtllar &*r*»iy, Ssneslksft Sar*#y tffcrt).
Pari ferflt&aaottt S*ir**y ef Haeaiaery sue CoiH.lt tea el Ciaa*.
awa* that all my recommendations have been carried out to my satisfaction.    I
am reporting accordingly and recommending to the Committee of Lloyd's Register
of Shipping that the machinery classification should be retained and the following
survey records assigned    m$ $/&* ffi& S/6§, tfttCO Van *S/fc»* *«« CSlalta <i*te>
h«« trie tarva* h*fi oaaa «wpUt«d a»«J altlwat apteetat eeaalttan lll)afltal port
aft »ata boiler.
Parts now examined:—     far £•&*
m (sailer and faattalMgav
&e« Caaaaatleaa*
ffcrt ffapalilea Mater*
aart aad iitaffcaaN Mala Caadaaaart*
Stad^aN Aft «ala Cireulatlag Pmp.
Ht% &al» read *5**a*
rare an** Aft ©aaeral &ar*tee Paaaa*
fen forward Lub, all fesp».
fart 4*10 an lurtw-eeaeratar Ma§iaa ta its aatlraty*
fen Haarlap iaar <»ydr*ulic r*a»p.
fen «aa Starboard Lab. oil Coatart*
&» mumm
Surveyor to Lloyd's Register of Shipping
KEY TO ABBREVIATIONS
ABS Auxiliary Boiler Survey MBS Main Boiler Survey TS Tailshaft Survey
CSM Continuous Survey of Machinery OF Fitted for oil fuel (date) FP above 150° F. TS(CL) Tailshaft Survey—Continuous Liner
DBS Donkey Boiler Survey SGS Steam Generator Survey TSN       Tailshaft renewed
ES Engine Special Survey SPS Steampipe Survey TS(OG) Tailshaft Survey—Oil Gland
This Certificate is issued upon the terms of the Rules and Regulations of the Society, which provide that:—
'*The Committees of the Society use their best endeavours to ensure that the functions of the Society are properly executed, but it is to be
understood that neither the Society nor any Member of any of its Committees nor any of its Officers, Servants or Surveyors is under any
circumstances whatever to be held responsible or liable for any inaccuracy in any report or certificate issued by the Society or its Surveyors, or in
any entry in the Register Book or other publication of the Society, or for any act or omission, default or negligence of any of its Committees or if..
any Member thereof, or of the Surveyors, or other Officers Servants or Agents of the Society.'*
N.       Cert. B.l.   240m,9,65   (made and printed in enoland.)
 LLOYD A REGISTER OF DIPPING
§8fc
Port of....Y.anc.o.uv.er.,...B...C...
Date.....2.9.t.h..M.ay.,....19.6.7.	
ThlS 1S tO (certify that I have surveyed part of the machinery
6062
of the     S.S.   "PRINCESS PATRICIA"        gross tons  of Victoria,  B.C.
for   Part Continuous Survey of Machinery,   Screwshaft Survey
(Starboard),  Main and Auxiliary Boiler Survey and on account
of damage to the Starboard Aft.   Intermediate Shaft stated to
have occured on the 2*+th April,  1967 whilst Tailshaft was
being withdrawn
awa* that all my recommendations have been carried out to my satisfaction.    I
am reporting accordingly and recommending to the Committee of Lloyd's Register
of Shipping that the machinery classification should be retained and the following
survey records assigned   M.B.S.   5/67,  A.B.S.   5/67,   T.S.(C.L.)   starboard h/6? now and C.S.   (with date)  when the Survey has been
completed  subject to any conditions at present attached to
the vessel's Class being dealt with as previously recommended,
Parts now examined:—
Propellers Port and Starboard.
Fastenings and Gratings.
Sea Connections.
Steering Machinery Complete.
Machinery Spare Gear.
Port and Starboard Main Engine Lub. Oil Coolers,
Port and Starboard Stop and Manoeuvring Valves.
Port and Starboard Main Condensers.
Starboard Thrust Block, Shaft and Bearings.
Starboard Intermediate Shafts and Bearings.
Nos. 1 and 2 Port Shaft Bearings.
P.T.O,
u!X*^ftXC^^owi-l/»—
Surveyor to Lloyd's Register of Shipping
KEY TO ABBREVIATIONS
ABS Auxiliary Boiler Survey MBS Main Boiler Survey TS Tailshaft Survey
CSM Continuous Survey of Machinery OF Fitted for oil fuel (date) FP above 150° F. TS(CL)  Tailshaft Survey—Continuous Liner
DBS Donkey Boiler Survey SGS Steam Generator Survey TSN       Tailshaft renewed
ES Engine Special Survey SPS Steampipe Survey TS(OG) Tailshaft Survey—Oil Gland
This Certificate is issued upon the terms of the Rules and Regulations of the Society, which provide that:—
"The Committees of the Society use their best endeavours to ensure that the functions of the Society are properly executed, but it is to be
understood that neither the Society nor any Member of any of its Committees nor any of its Officers, Servants or Surveyors is under any
circumstances whatever to be held responsible or liable for any inaccuracy in any report or certificate issued by the Society or its Surveyors, or m
any entry in the Register Book or other publication of the Society, or for any act or omission, default or negligence of any of its Committees or
any Member thereof, or of the Surveyors, or other Officers, Servants or Agents of the Society "
N
Cert. B.l.   80m,9,65   (made and printed in England.)
 •. - v../ - . vX *
Parts Now Examinedi-    Cont.
Nos. 2 & 3 (from forward) General Service Pumps.
Starboard Aft. Main Engine Lub. Oil Pump.
Starboard Main Feed Pump..
Both Auxiliary Feed Pumps.
Port Forward Main Engine Circulating Pump..
Port Outboard, Starboard Inboard and Outboard
Extraction Pumps.
Starboard Aft. Inboard and Outboard Fuel Oil Pumps.
Port and Starboard Propulsion Motor Air Coolers.
 * COPY
LLOYD 6 REGISTER OF DIPPING
Port &..fmMwmi..»M&M..
Date ifltM.*..lf?£.,
ThlS IS tO Certify that I kSB^J^rveyed part of the machinery
im   V." if  JL*-U»
*** 3t«ftoat4 itfta l»p(S»IJU» Sfcaf% stfttoti to
** t*» S 7ti, X967 *&&«« ^aUghedTH warn
awa* fAaf a// m;y recommendations have been carried out to my satisfaction. I
am reporting accordingly and recommending to the Committee of Lloyd's Register
of Shipping that the machinery classification should be retained and the following
survey recorJ^MSi&ned     *•   ♦   •  $W| **B*f*  $/&?*   ••   §&*&•?  IStli**
!$**£ WW mm mi e»§. mm mm} mm m ; v -3  t*» fcasa
•fla^Utod cm&g«et %» my vandtticait *% pmmmt- ®%%m$mA m
th* ***9*1** £&•** ^aiRf dtiU *itto a® 9*m«Btft£r awnaioMa
Parts now examined: —
ItXBrt P-aWt *fi& *twlNNK*&»
Fft»%«mg$ and Orating**
StMUNLnig lltttfltfAety C«£>lt«««
Elno to* Oil cooler**
f*e#t i*»4 itgia?&o$*M nnis
Part «ad $$«Sso*£a stop
pan i&$& ii»&»yd *4ai» o»teii«r8*
titertoKrd Throat Bl©ekt £fctf t nM 8*«ri»£S«
&***&)•#& xnt*na*&i&t*' &fen£$* «* £»**jtog«*
ion* a. «& a wm% sfc**t i.:o*rtfif *•
Ha afiflp
.....v^^^*^5^rtwft*ftrfXA»
Surveyor to Lloyd's Register of Shipping
KEY TO ABBREVIATIONS
ABS Auxiliary Boiler Survey MBS Main Boiler Survev TS Tailshaft Survey
CSM Continuous Survey of Machinery OF Fitted for oil fuel (date) FP above 150° F. TS(CL) Tailshaft Survey—Continuous Liner
DBS Donkey Boiler Survey SGS Steam Generator Survey TSN       Tailshaft renewed
ES Engine Special Survey SPS Steampipe Survey TS(OG) Tailshaft Survey—Oil Gland
This Certificate is issued upon the terms of the Rules and Regulations of the Society, which provide that:—
"The Committees of the Society use their best endeavours to ensure that the functions of the Society are properly executed, but it is to be
understood that neither the Society nor any Member of any of its Committees nor any of its Officers, Servants or Surveyors is under any circumstances
whatever to be held responsible or liable for any inaccuracy in any report or certificate issued by the Society or its Surveyors, or in any entry in the
Register Book or other publication of the Society, or for any act or omission, default or negligence of any of its Committees or any Member thereof,
or of the Surveyors, or other Officers, Servants or Agents of the Society".
N.       Cert. B.l.   150m,l,66   (made and printed in England.)
 No*« 2 & 3 (from forward) General Service Pumps,
Starboard Aft* Main Engine X*ub* Oil Pump.
Starboard Main Feed Pump*
Both Auxiliary Feed Pusaps.
fort Forward Main Engine Circulating ftsu*
Port Outboard, Starboard Inboard and Outboard
Extraction Pumps*
Starboard Aft, inboard and Outboard Fual Oil. Putsps*
Port and Starboard Propulsion Motor Air Coolers*
 LLOYD'S REGISTER OF SHIPPING
Port pf.Vs.ao.o.u.ve.t:»...B......C,
Date 1.6th..May....l96S...
XhlS is tO Certify that I have surveyed part of the machinery
of the S. S.  "PRINCESS PATRICIA"      6062     gross tons     of Victoria,  B.C.
for       Main Boiler Survey, Auxiliary Boiler Survey and Part Continuous Survey
of Machinery*
and that all my recommendations have been carried out to my satisfaction. I
am reporting accordingly and recommending to the Committee of Lloyd's Register
of Shipping that the machinery classification should be retained and the following
survey records assigned M.B.S. 4/68, A.B.S. 4/68,  now and C.S.(with date) when
the survey has been completed subject to any conditions at present attached
to the vessel's class being dealt with as previously recommended.
Parts now examined:—    For C.S.M.
Port and starboard main propulsion turbines and alternators,   and alternator air
Port and starboard main propulsion motors and air coolers. coolers,
Port and starboard main condensers.
Port Main thrust block,shaft and bearings.
Port intermediate shafts  and bearings.
Starboard forward main circulating pump.
Port and starboard forward boiler F.O. pumps.
Port inboard extraction pump.
Fire curtain pump.
Port aft M.E. lub oil pump.
Port main feed pump.
Port and starboard stop and manoeuvring valves.
All overboard discharge valves.
Auxiliary electrical  installation,
Port and starboard propellers.
Fastenings  and gratings.
Emergency fire and bilge pump.
Oil fuel transfer pump.
Holding down bolts and. chocks.
Engines working and manoeuvring.
Electrical and machinery spar^gr^^^
D.*..MciaJM}N..
Surveyor to Lloyd's Register of Shipping
ABS Auxiliary Boiler Survey MBS
CSM Continuous Survey of Machinery OF
DBS Donkey Boiler Survey SGS
ES Engine Special Survey SPS
Main Boiler Survey TS Tailshaft Survey
Fitted for oil fuel (date) FP above 150° F. TS(CL)  Tailshaft Survey—Continuous Liner
Steam Generator Survey TSN       Tailshaft renewed
Steampipe Survey TS(OG) Tailshaft Survey—Oil Gland
This Certificate is issued upon the terms of the Rules and Regulations of the Society, which provide that:—
"The Committees of the Society use their best endeavours to ensure that the functions of the Society are properly executed, but it is to be
understood that neither the Society nor any Member of any of its Committees nor any of its Officers, Servants or Surveyors is under any
circumstances whatever to be held responsible or liable for any inaccuracy in any report or certificate issued by the Society or its Surveyors, or in
any entry in the Register Book or other publication of the Society, or for any act or omission, default or negligence of any of its Committees or
any Member thereof, or of the Surveyors, or other Officers, Servants or Agents of the Society "
Cert. B.l.   80m,9,65   (made and printed in England.)
H
 COPY
LLOYD'S REGISTER OF SHIPPING
Port ftf..f.MMM».«*Y»...llk...<M
Date *.^...is**..im..
1 his is tO C^ertify that I have surveyed part of the machinery
of the   fc i» *9W&* fmffim*     Vm   gross tons      a* f latsrla. B.C.
for        iaia taller Sartejf* ^axillary Hollar i>urv«jr m4 Pert Ca»llaaa»s Sartay
al $aeteiaery*
awa" that all my recommendations have been carried out to my satisfaction. I
am reporting accordingly and recommending to the Committee of Lloyd's Register
of Shipping that the machinery classification should be retained and the following
survey records assigned   *«*•#• 4/69* A*ti*S. 4/W, mm and C.;>.t»ith .iaia) »feaa
tha sartay tiaa aaaa eoeptbtad suites to any eaaaltioBs at praseat attaabad
to tha vessel** alas* beia§ dealt wttfe as j»t«v4o«sly rateaeraeded*
Parts now examined: —
j-att asa ataraeara ttaiii fwepalslea tarbiaas and altaraasaffs, aad altaraataf air
Pert aa4 starboard »*ln $*opol8ieo «etors and all aoelera* sealers.
Pert »ad starboard stale aeadaaser*.
rart iota tbrast Meek, abaft aad bootless*
flat* iataraedleta shafts aad baerlags*
starboard forward as la elftalttlef $&$*
-Part tad starbeard forward bailor K*e* peatpu
Pitt iafeeard extractlea ;>es^*
fire agitata wm$*
Part aft »»fii tub all {neap,
Part *aia faad mtep*
s*ert m4 starbe*rd stop mui Kaaeeesrtag valves*
All avarboard dtfttfeafga vsivsa.
Auxiliary aieetrtaal iMtalietiee.
r| aad starbetrd pre <;*sllers*
Fasteaifiys aad gtstfitgt*
laergaaey fire aad bilge puis,
ail ft*ei trsasfer psa*?**
ialdirtfj dawn baits mi4 ebecHs*
Kaalaas warblRtt aad naaooaarlaa* _ n  .»  »  •.     >«.*_••
Ill cet r leal art «acb lues? i*ftre«eai. ^^ to L4^' ***'" of shippm*
t». ^ai«p«-
ABS Auxiliary Boiler Survey MBS
CSM Continuous Survey of Machinery OF
DBS Donkey Boiler Survey SGS
ES Engine Special Survey SPS
KEY TO ABBREVIATIONS
Main Boiler Survey
TS
Tailshaft Survey
Fitted for oil fuel (date) FP above 150" F.   TS(CL) Tailshaft Survey—Continuous Liner
Steam Generator Survey
Steampipe Survey
TSN       Tailshaft renewed
TS(OG) Tailshaft Survey—Oil Gland
This Certificate is issued upon the terms of the Rules and Regulations of the Society, which provide that:—
"The Committees of the Society use their best endeavours to ensure that the functions of the Society are properly executed, but it is to be
understood that neither the Society nor any Member of any of its Committees nor any of its Officers, Servants or Surveyors is under any circumstances
whatever to be held responsible or liable for any inaccuracy in any report or certificate issued by the Society or its Surveyors, or in any entry in the
Register Book or other publication of the Society, or for any act or omission, default or negligence of any of its Committees or any Member thereof,
or of the Surveyors, or other Officers, Servants or Agents of the Society".
N.       Cert. B.l.   150m,l,66   (made and printed in England.)
a
 LLOYD'S REGISTER OF SHIPPING
Port .Qf..V.aaco.u.v.er.*..£*...c;*.
Date .9th..De.c£wib.er.*..19.69..	
1 his IS tO L<ertify that I have surveyed part of the machinery
of the   S.S.  "PRINCESS PATRICIA"      6062      gross tons    of Victoria
for        Auxiliary Boiler Survey while lying afloat at Victoria,  B. C. on the
25th November,  1969 and subsequently.
and that all my recommendations have been carried out to my satisfaction. I
am reporting accordingly and recommending to the Committee of Lloyd's Register
of Shipping that the machinery classification should be retained and the following
survey records assigned   A.B.S. 11/69.
Parts now examined:
Auxiliary Boiler Survey.
A.K.McDOUi
ABS Auxiliary Boiler Survey MBS
CSM Continuous Survey of Machinery OF
DBS Donkey Boiler Survey SGS
ES Engine Special Survey SPS
Surveyor to Lloyd's (Register of Shipping
KEY TO ABBREVIATIONS
Main Boiler Survey TS Tailshaft Survey
Fitted for oil fuel (date) FP above 150° F. TSfCL) Tailshaft Survey—Continuous Liner
Steam Generator Survey TSN       Tailshaft renewed
Steampipe Survey TS(OG) Tailshaft Survey—Oil Gland
This Certificate is issued upon the terms of the Rules and Regulations of the Society, which provide that:—
"The Committees of the Society use their best endeavours to ensure that the functions of tie Society are properly executed, but it is to be
understood that neither the Society nor any Member of any of its Committees nor any of its Officers, Servants or Surveyors is under any circumstances
whatever to be held responsible or liable for any inaccuracy in any report or certificate issued by the Society or its Surveyors, or in any entry in the
Register Book or other publication of the Society, or for any act or omission, default or negligence of any of its Committees or any Member thereof,
or the Surveyors, or other Officers, Servants or Agents of the Society."
N.      Cert. B.l.   50m,3,68   (made and printed in England.)
D
 copy   ^^^ SHU
LLOYD'S REGISTER OF SHIPPING
Port.
••ef-^»aee»»#r*-8^-G»-
Date
0tb4*eee»b«r* 19**.
I JUS IS tO L«ertlfy that I have surveyed part of the machinery
of the     S.S. *VKl«k;u»& m*3&tA*     bOeS   gross tons      ©f Victoria
for miliary Bailer barvey wblle iyiag alien at victoria, e, C. aa the
IStfc ftataaber* 1W »ad sebse<t«e«tly.
and that all my recommendations have been carried out to my satisfaction. I
am reporting accordingly and recommending to the Committee of Lloyd's Register
of Shipping that the machinery classification should be retained and the following
survey records assigned     A*tt*S»  11/6®.
Parts now examined:
Auxiliary ttoliar   urvey.
,t~\
A.&.lfelHMSfAy,.
Surveyor to Lloyd's Register.
Shipping
ABS Auxiliary Boiler Survey MBS
CSM Continuous Survev of Machinery OF
DBS Donkey Boiler Survey SGS
ES Engine Special Survey SPS
KEY TO ABBREVIATIONS
Main Boiler Survey TS Tailshaft Survey
Fitted for oil fuel (date) FP above 150° F. TS(CL) Tailshaft Survey—Continuous Liner
Steam Generator Survey TSN      Tailshaft renewed
Steampipe Survey TS(OG) Tailshaft Survey—Oil Gland
This Certificate is issued upon the terms of the Rules and Regulations of the Society, which provide that:—
"The Committees of the Society use their best endeavours to ensure that the functions of the Society are properly executed, but it is to be
understood that neither the Society nor any Member of any of its Committees nor any of its Officers, Servants or Surveyors is under any circumstances
whatever to be held responsible or liable for any inaccuracy in any report or certificate issued by the Society or its Surveyors, or in any entry in the
Register Book or other publication of the Society, or for any act or omission, default or negligence of any of its Committees or any Member thereof,
or of the Surveyors, or other Officers, Servants or Agents of the Society".
N.       Cert. B.l.   150m, 1,66   (made and printed in England.)
 LLOYD'S REGISTER OF SHIPPING
Port oi...Vanc.QjjiV£ir*...JB....C*..
Date i.6lh.3iay*...19.69.
1 hlS is tO Ltertify that I have surveyed part of the machinery
of the     S.S.  "PRINCESS PATRICIA"    6062      gross tons    of Victoria,  B. C.
for Main Boiler Survey, Auxiliary Boiler Survey, Steam Pipe Survey,  Part
Continuous Survey of Machinery and Alterations to Steam Piping*
and that all my recommendations have been carried out to my satisfaction. I
am reporting accordingly and recommending to the Committee of Lloyd's Register
of Shipping that the machinery classification should be retained and the following
survey records assigned   M.B.S. 4/69, A.B.S. 4/69 S.P.S. 4/69 now and CSM(with date)
when the survey has been completed subject to any conditions at present
attached to the vessel's class being dealt with as previously recommended*
Parts now examined:
FOR C.S.f
P & S propellers.
Fastenings and gratings.
P & S main condensers.
P & S main lub oil coolers,
P & S main propulsion motor and alternator heaters and air coolers*
Both main O.F. heaters.
Auxiliary O.F. heater.
All 4 main boiler forced draught fans*
Auxiliary boiler forced draught fan.
Feed heater.
Inboard air compressor for combustion control.
Sea inlet valves.
Emergency generator F.O. tank.
Port aft main circulating pump*
Starboard main feed pump.
Aft auxiliary feed pump.
Starboard inboard extraction pump*       y^\      —-^==v
Starboard forward LO pump.    D> M(jKHm ..*^2^^	
P.T.O.
ABS Auxiliary Boiler Survey MBS
CSM Continuous Survey of Machinery OF
DBS Donkey Boiler Survey SGS
ES Engine Special Survey SPS
Surveyor to Lloyd's Register of Shipping
KEY TO ABBREVIATIONS
Main Boiler Survev
Fitted for oil fuel (date) FP above 150° F.
Steam Generator Survey
Steampipe Survey
TS Tailshaft Survey
TS(CL) Tailshaft Survey—Continuous Liner
TSN       Tailshaft renewed
TS(OG) Tailshaft Survey—Oil Gland
This Certificate is issued upon the terms of the Rules and Regulations of the Society, which provide that:—
"The Committees of the Society use their best endeavours to ensure that the functions of the Society are properly executed, but it is to be
understood that neither the Society nor any Member of any of its Committees nor any of its Officers, Servants or Surveyors is under any circumstances
whatever to be held responsible or liable for any inaccuracy in any report or certificate issued by the Society or its Surveyors, or in any entry in the
Register Book or other publication of the Society, or for any act or omission, default or negligence of any of its Committees or any Member thereof,
or the Surveyors, or other Officers, Servants or Agents of the Society."
D
N.       Cert. B.l.   50m,7,66   (made and printed in England.)
 Port aft main'boiler F.O. pump*
Auxiliary F.O. pump*
Starboard (450 KW) turbogenerator set in its entirety*
Starboard aft (200 KW) turbo-Generator set in its entirety.
Emergency diesel engine in its entirety*
Sprinkler pump.
Fire curtain pump.
Starboard steering gear pump*
P & S stop and manoeuvring valves.
n
 COPY *
LLOYD'S REGISTER OF SHIPPING
Port «f.i««fi#.«tM....#.*...^#
Date lW.m»..tW.*..
This is tO Certify that I have surveyed part of the machinery
of the     &*&* mmtm-&i-> mWmW*   40*2     ,™„ .»„*    ef Vletaria. ft* C*
for
gross tons
min miim baraay. raillery feller fmwqr, 3t*a* Htm ftartey, Part
C^etlneees I arv*y of -,aebltt«ry aw* Aiwttlwt ta J»*aaw flplug*
Xy
a»a" f/taf a// »y> recommendations have been carried out to my satisfaction.   I
am reporting accordingly and recommending to the Committee of Lloyd's Register
of Shipping that the machinery classification should be retained and the following
survey records assigned     «••-»• «*•*• *•«•*• «** ****** 4'^ ■* ** {'S^s*4*h <*e|<il
wbttt tba *t*r*ay baa baaa aaop-latad »-»bj«ct t« e»y e^oditiaaa at f»ra»*ttt
Htacbwl fca tb* «*«•*!"a dlest balaf daalt «ltb <sa jtraalMtaly fe«a«a«d«d.
/ >
Parte now examined:—
jFaataalaga intf grails^s.
f I | asata OMtMMMtfi*
£ & b «aia lab ail aaal^ra.
j$ I sola ptapalalaii swear essd aitaraator bastara aaa air <u*oiar»,
flat* »•*• 7>-. &0®t«a#
Aafttltavy 8*#« b«at»*»
All 4 Site boliar laread draagbt fata*
bantu**? bollar fa wad <4raa«bt fta*
r«ad baatat*
labaard- air c«i»-r«8*<?r fat ««*b».itia» e»atral.
&•» laiat aalvat*
iwifaw*? gaa-wtaf P»#* taab.
f*art aft ■«*!* eiraalatlafj pa»p*
Starbaard «l» faad gwMp*
Aft auxiliary ft»t* pn*->
Starbaard lai»»»frd vattaatlaa flaaip*
£t«rfea»rd farmed t# paw* ^ gobimatr
-'.A.-..
!-^^\	
 *JU~3?
ABS Auxiliary Boiler Survey MBS
CSM Continuous Survey of Machinery OF
DBS Donkey Boiler Survey SGS
ES Engine Special Survey SPS
Surveyor to Lloyd's Register of Shipping
KEY TO ABBREVIATIONS
Main Boiler Survey TS Tailshaft Survey
Fitted for oil fuel (date) FP above 150° F. TS(CL) Tailshaft Survey—Continuous Liner
Steam Generator Survey TSN       Tailshaft renewed
Steampipe Survey TS(OG) Tailshaft Survey—Oil Gland
This Certificate is issued upon the terms of the Rules and Regulations of the Society, which provide that:—
"The Committees of the Society use their best endeavours to ensure that the functions of the Society are properly executed, but it is to be
understood that neither the Society nor any Member of any of its Committees nor any of its Officers, Servants or Surveyors is under any circumstances
whatever to be held responsible or liable for any inaccuracy in any report or certificate issued by the Society or its Surveyors, or in any entry in the
Register Book or other publication of the Society, or for any act or omission, default or negligence of any of its Committees or any Member thereof,
or of the Surveyors, or other Officers, Servants or Agents of the Society."
0
N.       Cert. B.l*   150111,4,68   (made and printed in England.)
 i*brt aft Mala bailor *.i*. pm?,
Auxiliary r.O.   r«tmp,
btarbaard (450 I*J> tarbv-yaaaratar l*t la its entlraty*
Starbaard aft <J0O **&> *arb#-©a««rat«r »«t i« u« aatiraty*
£aargamiy diasal ««gi©# la its eatlraty*
SprSatelar pattfi.
fir* awrtala faxtpt
Starboard stearlag %mx rj«*»i»»
;f lr S step «M -aaaausrlag taires.
 LLOYD'S REGISTER OF SHIPPING
ir
Port 0.f...V.ancouv.er,.B... C*.
Date 1.5th May, 19.7.0...
1 hlS is tO L<ei*tify that if have surveyed part of the machinery
of the   s.S.   "PRINCESS PATRICIA"    6062       gross tons      of Victoria
for        Donkey Boiler Survey, Main Boiler Survey,   Port Tailshaft Survey and
Completion of Continuous Machinery Survey.
our our We
and that all M]X recommendations have been carried out to ffi$ satisfaction.  XK
are
KM reporting accordingly and recommending to the Committee of Lloyd's Register
of Shipping that the machinery classification should be retained and the following
survey records assigned   d.B.S. 11/69,  M.B.S. 4/70, T.S. CL P. 5/70 and
CSM 5/70.
Parts now examined:-
For CSM
Port intermediate shafting ancT No. 1, 2, 3, 4, 5 and 6 bearings*
Port and starboard main condensers, air ejectors*
Port main feed pump, Starboard outer extraction pump. Port ford lub oil pump*
Starboard aft main cir. water pump.
Ford and centre port general service pumps.
Starboard aft outer main O.F. pump*
Port 400 K.W. turbo generator complete.
Starboard 400 K.W. generator.
Windlass.
Outboard starboard air compressor,air receiver engine room starboard*
Storm valves centre section.
Sea valves (overboard).
Pumping arrangements.
Electric propulsion controls,
Main and auxiliary machinery un
equipment,
'siEWARI..and..A»..ii....MeI^P(
Surveyor to Lloyd's Register of Shipping
ABS
CSM
DBS
EGES
Auxiliary Boiler Survey
Continuous Survey of Machinery
Domestic Boiler Survey
Exhaust Gas Heated Economiser
Survey
ES
MBS
OF
SGS
SPS
KEY TO ABBREVIATIONS
Engine Special Survey TS Tailshaft Survey
Main Boiler Survey TS(CL) Tailshaft Survey—Continuous Liner
Fitted for oil fuel (date) FP above 150° F. TSN Tailshaft renewed
Steam Generator Survey TS(OG) Tailshaft Survey—Oil Gland
Steampipe Survey
This Certificate is issued upon the terms of the Rules and Regulations of the Society, which provide that:—
"The Committees of the Society use their best endeavours to ensure that the functions of the Society are properly executed, but it is to be
understood that neither the Society nor any Member of any of its Committees nor any of its Officers, Servants or Surveyors is under any circumstances
whatever to be held responsible or liable for any inaccuracy in any report or certificate issued by the Society or its Surveyors, or in any entry in the
Register Book or other publication of the Society, or for any act or omission default or negligence of any of its Committees or any Member thereof,
or the Surveyors, or other Officers, Servants or Agents of the Society."
D
N.
Cert. B.l.   50m,12.6S    (made and printed in England.)
 COPY
LLOYD'S REGISTER OF SHIPPING
Port Q$-tyNHMMHMt*, •■•»»■
Date iHh jj»y. ...m&.
g,
1 hlS IS tO L<ertlfy  that I wave surveyed part of the machinery
of the      s. s# «0*fJ|gl(88 *»«fbiseur   btfr3  £ross tons ttf victoria
/or _        ftoakay Jailer S««vajr, aalii flolaar fkirvay, nan Seliiaaft BvfffMf aad
€i»t£iatias at €aatl»«aaa yaablaary £-«mwy«
?M$bitf
awa" /Aa/ a// m$Wecommendations have been carried out to njjp&atisfaction.    I
am
arX&kporting accordingly and recommending to the Committee of Lloyd's Register
of Shipping that the machinery classification should be retained and the following
survey records assigned
»*<!.*. U/bFi. *.&.&. 4/?0* I*** CL P* $/?0 aad
Parts now examined:—        fiMUMB
.Hn imwmdlwb abaft tftgMS *». |» g, 3* 4* ft aad b baarlng*.
ran a«d starbe»rd «*ain a»»i«a»««ra» air ajaatwra*
P&w% *»1* famf paam* btarbbard aater aattaotlw P*»£*  fetf ford Aab all swap*
btarbeard »rt Mia air* watar ?hmifv.
K«fd aad aaatra $n% %m«t*i sartieo pmm*
Starboard aft oa*a< mi# (K4Ta gwai^*
&»rt 4«W £*i* turbo gaaaratar eoftplotft*
ifcarbaatd 400 H.b. gaaaratar*
IltHttfa*
Oatbaard atarbaard air ee*^r*s*or,elr r«a«irar aaylaa rea« starboard.
*t«ia> falaaa aaatra aaotiaa*
i«a trait** iotarboardj.
i%*pi«g *rraa$aa»aat**
Kloetria sra^tlsloa eoatrel*.   fe*e««r*aal a^alpseat*
Sola aad a«#iliarf m&Uimxy obdor/^rttay eand.it iomu
Surveyor to Lloyd's Register of Shipping
ABS
Auxiliary Boiler Survey
ES
Ent-ine Special Survey
CSM
Continuous Survey of Machinery
MBS
Main Boiler Survey
DBS
Domestic Boiler Survey
OF
Fitted for oil fuel (date) FP above 150" F
EGES
Exhaust Gas Heated Economiser
SGS
Steam Generator Survey
Survey
SPS
Steampipe Survey
KEY TO ABBREVIATIONS
TS Tailshaft Survey
TS(CL) Tailshaft Survey—Continuous Liner
TSN      Tailshaft renewed
TS(OG) Tailshaft Survey—Oil Gland
This Certificate is issued upon the terms of the Rules and Regulations of the Society, which provide that:—
"The Committees of the Society use their best endeavours to ensure that the functions of the Society are properly executed, but it is to be
understood that neither the Society nor any Member of any ofits Committees nor any ofits Officers, Servants or Surveyors is under any circumstances
whatever to be held responsible or liable for any inaccuracy in any report or certificate issued by the Society or its Surveyors, or in any entry in the
Register Book or other publication of the Society, or for any act or omission, default or negligence of any ofits Committees or any Member thereof,
or the Surveyors, or other Officers, Servants or Agents of the Society."
N.       Cert. B.l.   150m,6,69   (made and printed in England.)

Cite

Citation Scheme:

        

Citations by CSL (citeproc-js)

Usage Statistics

Share

Embed

Customize your widget with the following options, then copy and paste the code below into the HTML of your page to embed this item in your website.
                        
                            <div id="ubcOpenCollectionsWidgetDisplay">
                            <script id="ubcOpenCollectionsWidget"
                            src="{[{embed.src}]}"
                            data-item="{[{embed.item}]}"
                            data-collection="{[{embed.collection}]}"
                            data-metadata="{[{embed.showMetadata}]}"
                            data-width="{[{embed.width}]}"
                            async >
                            </script>
                            </div>
                        
                    
IIIF logo Our image viewer uses the IIIF 2.0 standard. To load this item in other compatible viewers, use this url:
http://iiif.library.ubc.ca/presentation/cdm.chungtext.1-0362817/manifest

Comment

Related Items