Open Collections

BC Sessional Papers

REPORT of the WATER RESOURCES SERVICE YEAR ENDED DECEMBER 31 1966 British Columbia. Legislative Assembly 1967

Item Metadata

Download

Media
bcsessional-1.0364212.pdf
Metadata
JSON: bcsessional-1.0364212.json
JSON-LD: bcsessional-1.0364212-ld.json
RDF/XML (Pretty): bcsessional-1.0364212-rdf.xml
RDF/JSON: bcsessional-1.0364212-rdf.json
Turtle: bcsessional-1.0364212-turtle.txt
N-Triples: bcsessional-1.0364212-rdf-ntriples.txt
Original Record: bcsessional-1.0364212-source.json
Full Text
bcsessional-1.0364212-fulltext.txt
Citation
bcsessional-1.0364212.ris

Full Text

 PROVINCE OF BRITISH COLUMBIA
DEPARTMENT OF LANDS, FORESTS, AND WATER RESOURCES
Hon. R. G. Williston, Minister A. F. Paget, Deputy Minister of Water Resources
REPORT
of the
WATER RESOURCES
SERVICE
YEAR ENDED DECEMBER 31
1966
Printed by A. Sutton, Printer to the Queen's Most Excellent Majesty
in right of the Province of British Columbia.
1967
COVER
Surrey water well being pump tested under
supervision of Groundwater Division.
  Victoria, B.C., January 23, 1967.
To Major-General the Honourable George Randolph Pearkes,
V.C., P.C., C.B., D.S.O., M.C., CD.,
Lieutenant-Governor of the Province of British Columbia.
May it please Your Honour:
Herewith I beg respectfully to submit the Annual Report of the British
Columbia Water Resources Service of the Department of Lands, Forests, and
Water Resources for the year ended December 31, 1966.
RAY WILLISTON,
Minister of Lands, Forests, and Water Resources.
 Victoria, B.C., January 23, 1967.
The Honourable Ray Williston,
Minister of Lands, Forests, and Water Resources,
Victoria, B.C.
Sir,—I have the honour to submit the Annual Report of the British Columbia
Water Resources Service of the Department of Lands, Forests, and Water Resources
for the 12 months ended December 31, 1966.
A. F. PAGET,
Deputy Minister of Water Resources.
 ::sl7':7r7
-    —.
■■:     :'     '-:
Westbank Irrigation District diversion dam on Powers
Creek.
ii
  CONTENTS
Page
Organization of the British Columbia Water Resources Service  8
Water Resources Service  9
Water Rights Branch—
Organization Chart of the Water Rights Branch  15
Water Licensing Division  16
District Engineers Division  23
Improvement Districts Division  33
Power and Major Licences Division  40
Water Investigations Branch—
Organization Chart of the Water Investigations Branch   55
Water Supply and Investigations Division  58
Hydrology Division  67
Groundwater Division  69
Basin Planning and Power Division  74
ARDA Division  76
Projects Division  80
Records Compilation and Reports Section  82
Draughting Office  8 3
Pollution Control Board  87
Office of the Inspector of Dykes  91
Southern Okanagan Lands Project  95
Personnel Office and Accounting Division  99
 z
o
a* ^
If
P
.S     CU
w s
<
Eng
auds
1
u J
0
~.fi*
H
0.
W
_>
2 si
U C
U    .
St-1
s
:a
11
§1
a   •
a
t/_
ol
u
_C
5
z
oo
l-H
S3
2_
s?
rt    o
CO
H
► 9
o S3
i- JQ
te-
0
—"S flea Q
"I  I
o w
2
a _•
ft«
I
E
0 v-
<
o
>.
£
U
a
o o
•is
15
■3 2 -S
•a <
■k a
>» 3.
2 "8
-Si
o    .
o rt
I*
11
- BM
So
o
GO GO
m co
T3-D
rt «
_-).-»
coco
 Report of the Water Resources Service
A. F. Paget, P.Eng., Deputy Minister of Water Resources
The steady development throughout British Columbia is reflected in the annually increasing number of applications handled by the Water Rights Branch for
water licences and the many other administrative processes associated with water
administration. In 1966, applications for licences increased by AV2 per cent and
the total number of processes handled increased by 2 per cent to 6,635. During
the year, 1,706 licences were issued, up 17% per cent from 1965.
In the six districts, applications for water licences were as follows: Kamloops,
316; Kelowna, 196; Mission, 211; Nelson, 205; Prince George, 164; Victoria, 183.
Revenue from all sources increased for the third successive year, reaching a
new high of $2,286,000 in 1966.
Improvement districts can be formed under the Water Act for a variety of
needs, and in 1966 eight new districts were created, bringing the net total in the
Province to 321 at the end of the year. Of this number 35 are hospital improvement
districts, with only two having responsibility for provision and operation of hospital
facilities, the remainder being responsible for financial aid toward constructing,
equipping, and operating a hospital. In most cases, districts are financed through
debenture issues fully guaranteed as to principal and interest by the Province of
British Columbia. In 1966, debenture issues totalling $621,600 were guaranteed,
bringing the total outstanding under the Improvement Districts Assistance Loan Act
to $13,560,600. During the year, capital works to the value of $23,635,096 were
completed by improvement districts with financing arranged under ARDA, through
the Municipal Development and Loan Board, or by means of district resources and
borrowings.
During 1965, the last year for which complete data are available, the total
amount of energy generated by hydro-electric plants in British Columbia amounted
to 15,257,960,000 kilowatt-hours, slightly down from the preceding year, whereas
thermal generation nearly doubled the 1964 figure, to 3,238,000,000 kilowatt-hours,
Over-all increase in power generation was 7.1 per cent above 1964 output, but
imports, netting 456,000,000 kilowatt-hours, were necessary to meet the 10-percent increase in demand. Over the 10-year period 1955 to 1964, the average
annual rate of load growth was 8.0 per cent.
Estimated generation for 1966 is 21,000,000,000 kilowatt-hours, which would
represent an increase of about 13.6 per cent over that of 1965. Although energy
was both imported and exported during the year, the net result was zero, indicating
that British Columbia's installations through interconnection were able to meet
demand. This was the result partly of a better water year, and partly of the starting
of the fourth and final 90-m.w. unit at the Waneta plant of Cominco Ltd.
Construction on the major flood-control and hydro-electric power projects is
progressing satisfactorily. The Portage Mountain Dam received some 23,400,000
cubic yards of material, or about 40 per cent of the total for the completed structure.
It is anticipated that power will be available to meet the demand in 1968 as planned.
On the Columbia River, the Arrow Lakes dam is on schedule, with good progress
both on the earth fill and on the concrete section. Duncan Lake storage dam is
well ahead of its time schedule, and storage is expected to be available a year ahead
of the planned date of April, 1968. At Mica Creek, preliminary site work is well
in hand and good progress was made during 1966 on the diversion tunnels.
 BB  10
WATER RESOURCES SERVICE
Many engineering studies were completed during the year by the Water Investigations Branch. In addition to some 15 irrigation-water supply and nine flood- and
erosion-control projects, a comprehensive study was completed on the possibilities
of a Shuswap River-Okanagan Lake canal. Most of the water-supply investigations
were of existing irrigation systems in need of rehabilitation. The studies provided
technical data in support of applications for financial assistance toward system repair
under the ARDA programme.
The snow survey programme is constantly being expanded, and new and up-
to-date equipment is being installed. A snow-pillow for the continuous recording
of snowfall was placed in operation in Manning Park. The results will be assessed
at the end of the 1966/67 winter season.
The early snow reports of 1965 indicated an above average snow-pack, but,
as the spring months passed, the pack was depleted until, in general, there was an
average amount of snow on the catchment areas when the spring run-off commenced.
The Interior rivers during midwinter 1964/65 were flowing above average for that
time of the year, whereas Coastal streams were at or below their 10-year average.
With the melting of the snow-pack, run-off remained above average for the major
streams until May, whereas Coastal river volumes dropped below the 10-year
May median.
The ground-water programme, designed to assess the potential of that water
source, now has 63 observation wells, from which data are being obtained on annual
ground-water levels and cyclic fluctuations. This is a net increase of eight wells over
the number in use in 1965. Of the total, 18 wells are in the Lower Fraser Valley,
38 are in the Okanagan-Kamloops area, and the remainder at Prince George, in
the Kootenays, and on Vancouver Island.
A long-standing and important aspect of Departmental work is the assessment
of hydro-electric potential in British Columbia. The Liard River remains as one
of the last great streams in British Columbia for which knowledge of power-
development potential is lacking. Field investigations during the summer of 1966
have provided sufficient information for a site exploration programme due to start
in January, 1967.
The Water Resources Service is now actively engaged in construction programmes, with expenditure in 1966 well in excess of $2,000,000 for water-supply
projects under the ARDA assistance programme. This is approaching the maximum
figure set by Federal and Provincial Governments for expenditure in any one year
on projects under this programme.
The first agreement between British Columbia and Canada under the Canada
Water Conservation Assistance Act was made in February, 1966. The project,
involving the improvement of stream channels in North and West Vancouver to
reduce flooding and erosion, is expected to cost $23,000,000 and will take at least
three years to complete.
A second agreement between the Province and the Federal Government under
the Canada Water Conservation Assistance Act was reached in late 1966. This
pertains to tributary diversion in Hastings Creek in North Vancouver and is estimated to cost some $600,000.
Other major projects under active consideration which will probably be
financed under the Canada Water Conservation Assistance Act include flood control
at Alberni and flood and erosion control in the Squamish Valley.
Flooding and erosion are pressing and costly problems. A Federal-Provincial
committee reassessed the problems in the Lower Fraser Valley, examining not
only the current needs of the dyking systems, but also requirements for improved
drainage, river-bank stabilization, as well as flood protection on some of the
 WATER RIGHTS BRANCH
BB  11
valley streams. Approximate cost estimates indicate expenditure could exceed
$30,000,000 over a period of time. In this same area, bank protection was carried
out during 1966 at a cost to the Province of some $100,000. This is an annual
programme in which the two senior Governments assist the local authority by
financing two-thirds of the cost each year.
Limited dyke reconstruction was commenced in two municipalities in the
Lower Fraser Valley during the year. The work will form part of the larger dyke
improvement programme currently available to local authorities as a joint project
wherein Federal and Provincial financial assistance is available in amounts up to
two-thirds of the reconstruction cost.
In June, 1966, the area of jurisdiction of the Pollution Control Board was
increased with the inclusion of Strathcona Park, thereby ensuring close surveillance
of mining developments in the vicinity of Buttle Lake. A major achievement for the
year was the development of effluent standards for kraft mills.
Increasing demands on the Department necessitated expansion of office space.
Late in the year the Pollution Control staff and the ARDA division were moved to
new accommodation in the Professional Centre.
  WATER RIGHTS BRANCH
 WATER RESOURCES  SERVICE
WATER RIGHTS BRANCH
The Water Rights Branch is the agency of the Provincial Government which administers the control and use of surface water under the authority of the Water Act.
The main principles of the Water Act regarding the use of water are:—
(1) The property in and the right to the use and flow of all water at any time in
any stream in the Province are for all purposes vested in the Crown in right
of the Province. The common-law principle of riparian water right has been
abolished.
(2) Licence-holders have a right to the use of water under the terms and conditions
of the water licence issued by the Comptroller of Water Rights. Earlier licences
have priority over licences issued later.
(3) Retention of a water licence is dependent upon the beneficial use of the water,
payment of the water-licence rentals, and observance of the regulations of the
Water Act.
(4) A water licence is generally made appurtenant to a parcel of land, mine, or
undertaking, and it will pass with any conveyance or other disposition thereof.
(5) If it is necessary that a water licensee construct works on another person's land,
he can expropriate the land reasonably required if an amicable agreement cannot be reached. If the works will be on Crown land, the water licensee may
acquire a permit to occupy Crown land for such purpose.
The second major function of the Water Rights Branch is to generally supervise and
assist the administration of the improvement districts which have been incorporated under
the Water Act for irrigation, waterworks, drainage, dyking, street-lighting, providing financial aid to hospitals, fire protection, and several other purposes. An improvement district
is a self-governing public corporate body administered by elected Trustees. The undertakings of an improvement district can be financed by Provincially guaranteed debenture
issues.
The administration of the Water Act is carried out by the Comptroller of Water
Rights and his staff, who are located at a headquarters office in Victoria and district
offices at Victoria, Kamloops, Kelowna, Nelson, Prince George, and Mission City.
Water is a natural resource which often has a controlling influence on economic
development of other resources and, therefore, is in competitive demand by the utilizers
of other resources. Much of the vast industrial expansion presently occurring in this
Province is associated with the use of British Columbia water. A large number of communities have been incorporated into improvement districts under the Water Act to operate community projects and provide essential amenities.
 WATER RIGHTS BRANCH
BB  15
WATER RIGHTS BRANCH
H. D. DeBeck, P.Eng., Comptroller of Water Rights
The Water Rights Branch is responsible for the administration of all use of
water in British Columbia under the provisions of the Water Act. For this purpose
a licensing system has been developed over the course of the last century, from its
origin in the Gold Fields Act of 1859 through a gradual evolution to the first
Water Act of 1909 and on to the present Water Act, which has been substantially
unchanged since 1939. In addition to administration of water use, the Water Act
also provides for the incorporation of improvement districts which provide local
services in water-related fields and other fields such as street-lighting and the financing of hospitals. In addition to its purely administrative functions, the Water Rights
Branch carries out a great number of engineering studies on water matters, including erosion and flood damage and some aspects of pollution control. The capital
undertakings of improvement districts are given careful scrutiny, both with regard
to economic feasibility and engineering adequacy, and some engineering services
are provided to improvement districts and to groups proposing to organize districts
for water-supply purposes. During 1966 a large number of water-supply feasibility
studies were carried out, and final design and supervision of construction were provided to improvement districts by both headquarters and regional engineering staff.
The division of responsibilities between the Water Rights Branch and the
Water Investigations Branch, which carries out water investigations of a greater
scope, is somewhat flexible, and a close liaison has been maintained between these
two branches of the Water Resources Service. There is a sharing of some head
office facilities, such as filing, and the district offices of the Water Rights Branch,
because of their location, provide office facilities and staff assistance to the Investigations Branch, which in return provides specialist engineering advice to the Water
Rights Branch.
ORGANIZATION CHART OF THE WATER RIGHTS BRANCH,
YEAR ENDED DECEMBER, 1966
Comptroller of Water Rights
(H. D. DeBeck)
Deputy Comptroller of Water Rights
(A. K. Sutherland)
Improvement Districts
Division
(P. J. Leslie)
District Engineers
Division
(M. L. Zirul)
District Engineers
Victoria—.D. E. Smuin
Kamloops—P. G. Odynsky
Kelowna—-R. J. Talbot
Mission City—E. G. Harrison
Nelson—R. A. Pollard
Prince George—J. C. Purnell
Power and Major
Licences Division
(H. M. Hunt)
(D. B. Tanner)
Water Licensing Division
(W. R. Tuthill)
Chief Clerk
(A. G. Sargent)
Chief Draughtsman
(M. Chandler)
 BB  16
WATER RESOURCES SERVICE
The trend of steadily increasing activity in the water-licensing field, which has
been evident in recent years, continued through 1966. The combined total of
applications for new licences and amendments to existing ones increased to a new
high, and in spite of an increase of 18 per cent in the number of licences issued
from the previous production record established in 1965, the backlog of applications
outstanding also reached a new high.
The District Engineers Division has been heavily involved in the increased
volume of licensing work and has also undertaken a substantial volume of engineering work not directly connected with licensing.
Work associated with improvement districts continued at a high level throughout the year, both in the administrative and the engineering fields. The number of
improvement districts under the Water Act reached a new high of 321. As a result
of the Federal Government ARDA programme, construction activity by districts
reached a very high level, although new project starts were somewhat reduced, toward the end of the year, by the effect of the shortage of capital funds and high
interest rates.
During the year the Power and Major Licences Division has been extremely
busy with work associated with approval of plans and other aspects of the three
Columbia River Treaty projects and the Peace River project, all of which were
under active construction phases. A number of other projects of substantial scope
were also under review. In addition, this Division has also provided the technical
services required in connection with the position of the Deputy Minister on the
Columbia River Treaty Permanent Engineering Board and the Canada-British
Columbia Liaison Committee, and other special assignments. Extensive use of
the computer is made for power-licence rentals, statistical studies of water use, and
various engineering studies.
A number of staff changes took place during the year. Mr. H. M. Hunt was
appointed Chief of the Power and Major Licences Division, succeeding Mr. J. T.
Rothwell, who passed away early in the year. Mr. D. E. Smuin completed his
requirements for registration as a professional engineer, and was appointed District
Engineer at Kamloops, succeeding Mr. P. G. Odynsky, who will become District
Engineer at Victoria early in 1967. Meanwhile Mr. Smuin has been serving as
District Engineer at Victoria, replacing Mr. C. Errington, who retired in October.
Mr. W. R. Tuthill was promoted to Chief, Water Licensing Division to replace
Mr. Smuin. Mr. Tuthill was in turn replaced as Principal Clerk, Water Licensing
Division by J. W. P. Martin. Severe staff loss occurred at the Assistant District
Engineer level. Mr. F. N. Manson left our Mission City office to transfer to the
Public Utilities Commission. Mr. L. A. Bergman resigned from our Nelson office
to pursue postgraduate education, and Mr. J. Wester and Mr. S. B. Mould transferred from our Kamloops and Kelowna offices to the Water Investigations Branch.
Because of a shortage of engineers, it has not yet been possible to obtain permanent
replacements for any of these positions.
The activities of 1966 are recorded in greater detail in the reports of the
separate divisions of the Water Rights Branch, which follow.
WATER LICENSING DIVISION
W. R. Tuthill, Chief of Division
Under the Water Act the Comptroller of Water Rights is responsible for the
administration of licensing the use of the water resources of the Province. The
Water Licensing Division is responsible, under the direction of the Comptroller, for
 WATER RIGHTS BRANCH
BB  17
the processing of new applications for water licences and amendments to existing
licences and for maintaining the records necessary for the administration of the
rights when they have been granted. In this regard, close Maison is maintained with
the District Engineers Division, which is responsible for field investigations of
applications.
The Licensing Division's volume of work during 1966 remained high in comparison to previous years. New applications received were the second highest on
record, while the number of licences issued and amended reached new records.
The number of applications pending also reached a new high of 1,701, up 252
from 1965. The additional work load was also taken on by the Draughting Office,
which assumed the responsibility for the preparation of engineering drawings
formerly prepared for the Improvement Districts Division by Water Investigations
Branch Draughting Office.
The Licensing Division is composed of the General Office, which handles the
clerical aspects of licensing, and the Draughting Office, which looks after the
mapping requirements. The main functions of these two offices and details of their
activities for 1966 are contained in their reports, which follow.
General Office
The General Office of the Water Rights Branch is divided into the Applications,
Amendments, Rights-of-way, and Ground-water Sections.
The Applications Section processes all new applications for water licences,
approvals, and permits over Crown land. It compiles and maintains indexes by
name, by file number, by licence number, and by water district, and makes use of
these and the records of the Accounting Section, and of the Draughting Office, when
processing applications.
If objections to the granting of a licence are received, these are fully investigated
before adjudication of the application. In some cases the Comptroller may hold a
formal hearing before making his decision.
The Applications Section also processes applications for approvals, both for
the non-recurring use of water and for making changes in and about streams.
The Amendments Section processes applications for the amendment of existing
licences by apportionment, by change of works, by transfer of appurtenancy, etc.
When the land to which a licence is appurtenant is subdivided, the rights and
obligations granted and imposed under the licence may be apportioned between the
owners of the several parcels in proportion to the interest held by each.
If a licensee wishes to construct additional works, or works other than those
authorized under his licence, he may apply for an amendment of the licence by
change of works.
If a licensee wishes to transfer the rights he holds under a licence to an additional or other parcel of land, he may apply for a transfer of appurtenancy of the
licence.   The Comptroller may grant this either in whole or in part.
Other licence amendments include the authorization of additional time in
which to construct the works, a change of the purpose for which the water may be
used, or the correction of any error in the licence.
The Rights-of-way Section is responsible for the processing of applications
for permits for a right-of-way over Crown land from the time they are received until
they are issued.
A noticeable feature of the past year has been the number of cases where
applicants have requested a permit to occupy an area considerably wider than the
15 feet normal for a pipe-line right-of-way.   Most of these applications have been
2
 BB  18
WATER RESOURCES SERVICE
from mining or pulp-mill companies, and they entail considerable additional work
and a very close liaison with both the Lands Service and the Department of Mines
and Petroleum Resources.
The Ground-water Section is engaged in preparing the forms and administrative procedures necessary for the licensing of this water source. However, no part
of the Province has yet been designated as one to which the Water Act will apply
with respect to ground-water.
The General Office is also responsible for the processing of abandoned and
refused applications and of abandoned and cancelled water licences. Records of
water-users' communities, incorporated under the Water Act, are also maintained.
There were 74 of these at the end of 1966.
During the year under review there have been numerous personnel changes
in the General Office. These include two resignations, two transfers, and five promotions. Three new members have joined the staff in the same period. These
changes and the necessary staff training, coupled with the general increase in the
work load, have made 1966 a particularly difficult year. There are no indications
that the volume of work handled during 1967 may be less than during 1966.
The principal activities of the General Office in the 12-month period ended
December 31, 1966, are shown in the following table, together with the same data
for the five preceding years:—
1961
1962
1963
1964
1965
1966
Applications for—
1,133
180
29
32
174
24
1,127
149
56
59
120
14
1,335
164
53
65
164
17
1,119
207
43
72
147
40
1,277
273
68
90
198
44
1,333
Rights-of-way 	
259
65
112
185
32
Totals    	
1,572
1,525
1,798
1,628
1,950
1,986
131
127
150
136
162
165
Changes of ownership, address, etc	
Cancellations and abandonments.	
2,750
426
2,471
323
2,264
270
2,274
258
2,348
350
2,144
254
3,176
2,794
2,534
2,532
2,698
2,398
689
222
883
187
760
258
1,026
422
1,034
415
1,163
543
Totals _ _	
911
1,070
1,018
1,448
1,449
1,706
Rights-of-way issued	
158
75
17
196
67
13
210
100
19
297
159
28
333
131
38
338
182
25
Totals  _. _  	
250
276
329
484
502
545
5,909
5,665
5,679
6,092
6,505
6,635
Administrative Draughting Office
The Administrative Draughting Office staff is composed of a Chief Draughtsman, a Supervising Draughtsman, nine draughtsmen, and one clerk. The main
functions of this office are checking the legal status of water applications; maintaining stream registers and plan indexes; compiling, maintaining, and revising
water rights maps; preparing plats for water licences; clearing land applications
for the Lands Branch; checking petitions and preparing legal descriptions and
plans for improvement districts; attending to requests for maps and various information from our district offices, other departments of Government, and the public.
Applications for water licences and amendments to licences received by the
Licensing Division are cleared through the Draughting Office, and a complete check
 WATER RIGHTS BRANCH
BB  19
is made of the legal status of every application received. In most cases this work
entails a search of the records of other departments of Government, such as Lands
Branch, Land Registry Office, Surveyor of Taxes, Department of Highways, and
Department of Mines and Petroleum Resources. Upon completion of this work,
all applications are entered on the water rights maps and in the stream registers,
which together form a record of all pertinent data regarding water licences and
applications.
A major function of this office is the checking of petitions pertaining to improvement districts. This involves searches of the records of the Land Registry
Office and Surveyor of Taxes to obtain correct property descriptions. When a
petition to incorporate an improvement district has been checked and found correct,
a plan showing all lands within the boundaries of the proposed district is drawn up
and a legal description defining the boundaries of the district is prepared. This
work accounts for about 25 per cent of the time of the Draughting Office. During
1966 nine new improvement districts were incorporated and the boundaries of 52
districts were amended. Considerable time was also spent by the staff on engineering drawings for the Improvement Districts Division during 1966.
The table and the plates which follow illustrate the work which the Draughting
Office has handled during the last five years:—
1962
1963
1964
1965
1966
New water licence applications cleared and plotted on maps .
Final and conditional licence plans prepared	
New water rights maps complied and traced 	
Water rights maps revised   —
New improvement districts described and plans prepared	
Improvement districts descriptions and plans amended	
Reference maps renewed _
Extensions of time, apportionments, transfer of appurtenancy..
Change of works  	
Approvals    	
Rights-of-way over Crown land _ _ 	
Change of ownership and cancellations 	
Land clearances (purchases, leases, Crown grants, etc.)	
Land clearances (cancellations)  	
1,097
1,195
30
42
10
42
16
182
120
13
196
2,794
Totals .
5,737
1,269
1,281
9
10
14
38
30
218
164
19
210
2,534
6,508
1,493
1,099
1,633
50
15
25
47
13
274
147
28
297
2,532
7,155
2,263
1,184
1,587
71
15
19
46
21
289
198
38
333
2,698
6,475
2,251
13,797    | 15,578    I 15,217
1,268
1,920
40
8
9
52
46
368
176
25
337
2,410
6,641
1,493
14,793
 BB 20
WATER RESOURCES SERVICE
APPLICATION S
500
1
\
y
1     »
1    I
/   I
1  I
\
\
\
\
y
f I
' i
1
t
\
X
/
000
/
/
i
9
1
>"
*1
f
t
1
r
f
I
1        1
I        §
t       1
500
0
A     ,°o     .<*>     ,o     ,n.      rcy     r"3      v-     <o     ,co
<o      ip      Jn        to       to      Jo      Jp       to       <a       <p
RECEIVED
OUTSTANDING
Plate 1
 WATER RIGHTS BRANCH
BB 21
LICENCES    ISSUED
1500
1000
500
/
/
I
/
/
/
/
/
^^^
/
— - —
/
1
/
\
i
\
j
>
/
"*•
\
/
/
\
1
/
/
>
f
■	
/
/
/
/
/
\
\
/
/
N
\
"^■•~.«.
*«.-,
./
i>
*•-.
*>*
A, ch Oi o        .•**       .<V        ,°3 V- *o        to
<t,        <<?       <o       JP       riP      &<       £>        to to       Co
\' »s'
CONDITIONAL LICENCES   ISSUED
FINAL LICENCES   ISSUED
TOTAL LICENCES   ISSUED
Plate 2
 BB 22
WATER RESOURCES SERVICE
MAJOR AMENDMENTS TO LICENCES
300
/
^^
/
200
100
A
A
cT?
to
-P)
0/
CO
pi
Z0
to
Co
3i
-P>
CO
JP
■Pi
Plate 3
 WATER RIGHTS BRANCH BB 23
DISTRICT ENGINEERS DIVISION
M. L. Zirul, P.Eng., Chief of Division
The Water Rights Branch has regional offices located at Kamloops, Kelowna,
Nelson, Mission City, Prince George, and Victoria, each in charge of a District
Engineer. The function of the District Engineer is to assist the Comptroller of Water
Rights in the administration of the Water Act within the region for which he is responsible. District Engineers are empowered under section 37 of the Water Act to
exercise administrative authority related to the use of water under water licences and
approvals issued under the Water Act and, in addition, have responsibility for public
safety with respect to impounded water and for the prevention and correction of
pollution of water sources by sawdust, timber, tailings, gravel, refuse, and similar
substances.
The District Engineers investigate and report to the Comptroller on all new
applications for water licences, applications for approvals under the Water Act, and
on applications for amendment of existing licences. Their reports are expected to
contain firm recommendations for the disposal of each application received. They
have, therefore, a major responsibility as advisers to the Comptroller on matters
related to the use of the water resources of the Province.
The staff of the district offices have prepared a number of water-supply reports
which include the design of works for waterworks or irrigation supply to new areas
or extensions to existing systems and have investigated the financial feasibility of the
proposals. They have also carried out a number of investigations and prepared
engineering reports on flooding and stream-bank erosion problems. In cases where
direct Government assistance has been given in correcting such problems, the District
Engineers have drawn up the necessary plans and specifications, engaged equipment,
and supervised the work. This arrangement is normally only carried out where
the public interest is involved and there is participation in the cost of the project
by the owners of property benefiting.
With one retirement, three resignations, two transfers to the Water Resources
Investigations Division, and one other engineering position remaining unfilled, the
District Engineers Division has suffered from a shortage of staff all year. It is hoped
we will be successful in attracting suitable engineering personnel to this Division in
the coming year.
The Chief of the Division visited district offices during the year and accompanied the District Engineers on field inspections to assist in resolving problems.
Several complaints in the area administered by the Victoria District Engineer required his attention due to the retirement from the service of the Victoria District
Engineer. The Victoria District Engineer's position is now covered by a new
appointment. The Chief of the Division investigated a flooding and erosion problem
at the Village of Zeballos and prepared a report containing a design and cost estimate
of corrective works. Engineering reports prepared by District Engineers were
reviewed before release to the public.
The separate reports of the District Engineers of the six regional offices follow.
Kamloops District Office
P. G. Odynsky, P.Eng., District Engineer
The District Engineer at Kamloops is responsible for regulating the use of water
under licences in the Ashcroft, Cariboo, Kamloops, and Nicola Water Districts, and
assists the Comptroller in administering the Water Act within these districts. Although the City of Kamloops is not at the geographical centre of this area, it is
 BB 24 WATER RESOURCES SERVICE
centrally located in the Dry Belt of the Province, where water for irrigation is in
greatest demand and the supply is most critical.
In the Kamloops District the 1966 water year began with a mild winter yielding
higher than average winter snowfall. At the Kamloops Airport the recorded minimum temperature during the winter was —13° F., which occurred on December 29,
1965, and the accumulated snowfall at the end of March totalled 41 inches, compared with the average of 29.1 inches. Mild weather in February and March
brought premature melting of most of the snow at levels below 3,000 feet, which
resulted in shortages of water in some areas at the beginning of the irrigation season.
Brief but intensive rain showers in July relieved water shortages throughout the
four water districts. A maximum rainfall of 0.85 inch for one day was recorded
at the Kamloops Airport on July 3rd, and total precipitation for the month was
a record 2.72 inches, which fell in nine days. The long-term average for July is
0.97 inch.
Maximum temperatures occurred in August, Kamloops experiencing seven
consecutive 90° days beginning August 19th. Dry sunny weather in September
and October resulted in the harvesting of the best fall hay crop in years for the
Kamloops area.
Staff movements, which resulted in a reduction by approximately 50 per cent
of the permanent force available for field work, had a marked effect on ability
to cope with the work load. In addition to having to curtail the engineering work
undertaken, it also became necessary to shorten the survey season and to deploy the
field technician to assist the District Engineer in inspecting applications for water
licences, to prevent the backlog from increasing out of manageable proportions.
A summary of applications for water licences received and dealt with for the
years 1959 to 1966, inclusive, is shown in the following table:—
Year
1959     	
Water
Applications
Received
   221
Water
Applications
Reported On
151
1960           	
    186
133
1961	
  237
95
1962           	
       300
164
1963 	
          330
282
1964    	
  294
290
1965	
  281
253
1966	
   316
250
There are now 2,347 active conditional water licences and 2,906 active final
water licences under the jurisdiction of the Kamloops District office.
Summary of Year's Work
Applications for water licences—
On hand, November 1, 1965  270
Received during year  316
Cancelled or abandoned  12
Inspected and reported on  250
On hand, November 1, 1966  324
Applications for approvals reported on  4
New conditional water licences received  337
New final water licences received  77
 WATER RIGHTS BRANCH BB 25
Summary of Year's Work—Continued
Licence amendments reported on—
Changes of works  69
Transfers of appurtenancy   49
Apportionment of licences  19
Extension of time  84
Change of purpose  1
L.R.O. searches made for Victoria office  223
L.R.O. plans ordered for and sent to Victoria office  466
Final-licence surveys run  41
Final-licence survey reports forwarded   39
Miscellaneous surveys run  17
Dam inspections made  46
Meetings attended  56
Complaints investigated  62
Orders issued  10
Engineering Investigations and Studies
Investigations concerned with flooding included drainage from Williams Lake
Airport into Missioner Creek affecting private property, North Thompson River
affecting proposed development of marginal lands, and tail-water from irrigation
at Walhachin and at Cherry Creek affecting Canadian Pacific Railway trackage.
Engineering projects included the preparation of construction drawings, specifications, and contract documents for an earth dam at Smith Lake for the Darfield
Irrigation District, ARDA Project 29006, a proposal for the renewal of Goldbridge
Waterworks Districts distribution system, design and supervision of construction
of a new drop structure for a storage dam for the Village of Clinton, and a report
covering proposals to extend the Savona Waterworks District's distribution system
to serve new subdivisions in the Durand Creek area.
Reported on an investigation of a complaint of pollution of Boss Creek and
Canim Lake by Noranda Mines Limited tailings disposal from mining and milling
of molybdenum ores.
Inspections made of construction and performance of pile-driven drop structure in spillway of dam on Charcoal Creek near Chase. Failure of this structure
necessitated ordering the licensee to lower the spillway of the dam.
Plans were reviewed and field inspections made in connection with dams to
store water for irrigation use on Yook Lake near Ashcroft and on Jones Lake near
150 Mile House.
Inspected drilling and testing of water wells for Rayleigh Mount and Heffley
Creek Waterworks Districts.
Reported on investigation of effect on Sword Creek of the relocation of Chil-
cotin Highway west of the Fraser River highway bridge.
Inspected control structure and new outlet channel at the outlet of Salmon
Lake, constructed for land-improvement purpose by Douglas Lake Cattle Company.
Supervision provided to bailiffs employed to regulate use of water from Ingram
Creek at Westwold and Peterson Creek at Knutsford.
Hydrologic studies undertaken of watersheds of Brenda, Pennask, and Spaho-
min Creeks in connection with applications for water licences filed by Brenda
Mines Limited.
 BB 26
WATER RESOURCES SERVICE
Kelowna District Office
R. J. Talbot, P.Eng., District Engineer
The Princeton, Fairview, Grand Forks, Vernon, and Revelstoke Districts fall
under the jurisdiction of the Kelowna District office. These districts comprise the
Kettle, Similkameen, and Okanagan drainage basins; Shuswap River drainage basin,
above Sicamous; and part of the Columbia River drainage from its confluence with
the Canoe River downstream to Arrow Lake.
Precipitation recorded at Kelowna for the 12-month period from November 1
to October 31, 1966, was 10.5 inches, or 81 per cent of the average annual precipitation of 12.41 inches. During this same period, precipitation recorded at the
Penticton Airport was 8.57 inches, or 74 per cent of the average precipitation at
that station. While winter snow-pack appeared to be about average at February
1st, readings on most snow courses were down 15 to 20 per cent on the April, May,
and June readings, indicating an early run-off. Because of this early run-off, low
May and June precipitation, and high spring south-westerly winds, the run-off into
Okanagan Lake was only about 54 per cent of its average for the period 1914-65.
The discharge from the Okanagan Lake at Penticton was controlled at a
steady 350 c.f.s. throughout the spring because of the below average run-off. Water
supply was ample for irrigation and other requirements where the licensees had
storage to support demand, but creeks without upstream storage dried early in the
summer, causing problems in allocation of water under licences. September and
October precipitation was low and watersheds became quite dry. However, rains
and snow in November partially recharged the ground.
Forty dams were inspected during the year. Inspections included Nicklen
Lake Dam under construction, replacement of the gate on Naramata Irrigation District Big Meadow Dam, and a fish ladder constructed for the Smithson-Alphonse
Dam on Mission Creek. It can be seen from the table included in this report that
the number of dams being reconstructed or repaired is increasing, presumably a result of more serious and systematic inspection of the storage dams of this district
by the staff of the Kelowna office.
In latter years the number of engineering studies completed by this office has
increased. The addition in 1963 of a second Assistant District Engineer to the
engineering staff of this office has made it possible to carry out more engineering
and feasibility studies while still maintaining the flow of routine administrative
work. The number of applications for water licences investigated and reported on
this year was equal to the average for the past five years, but there was an increase
of 35 per cent over 1965 in the number of reports on amendments to existing water
licences.
A summary of the activity of this office in connection with water licence applications, dam construction, and preparation of engineering reports for the years
1959 to 1966, inclusive, is shown in the following table:—
Year
Applications
Reports
Cancelled or
Total
Received
Abandoned
Disposed Of
156
112
10
122
193
141
22
163
168
146
13
159
115
153
31
174
211
177
18
195
192
193
46
239
187
145
13
158
196
165
35
200
Dams under
Construction
or Repair
Major
Engineering
Reports and
Studies
1959
1960
1961
1962
1963
1964
1965
1966
5
10
14
 WATER RIGHTS BRANCH BB 27
Summary of Year's Work
Applications for water licences—
Applications outstanding, November 1, 1965  119
New applications received  196
Applications inspected and reported on  165
Applications cancelled or abandoned     35
Applications on hand, October 31, 1966  115
New water licences received 1966—
Conditional licences   185
Final licences     84
Reports for licence amendments  141
Final licence and miscellaneous surveys     66
Meetings attended     51
Complaints investigated      99
Engineering Investigations and Studies
Prepared a design and supervised the construction of new intake works and
concrete settling-tank for the Christina Waterworks District and repairs to the gate
works for Big Meadow Dam for Naramata Irrigation District.
Prepared feasibility studies for the storage of water at the headwaters of Fortune Creek for the City of Armstrong, for proposed storage on Bellevue Creek near
Okanagan Mission, and for a proposed domestic water system for Hillside Improvement District near Sicamous.
Reviewed and completed a feasibility study for Lakeview Irrigation District in
respect of repairs to or replacement of its diversion works from Lambly Creek to
Rose Valley Lake.
Prepared a study of the hydrology of Peachland, MacDonald, and Pennask
Creeks in conjunction with the District Engineer at Kamloops, for water applications
by Brenda Mines Limited.
Supervised construction of the Mission Slough drainage works, south of
Kelowna.
Prepared " as constructed " drawing and maintenance instructions for Canyon
Waterworks District's new waterworks system.
Inspected a fish ladder for the Smithson-Alphonse Dam on Mission Creek,
being constructed by the Provincial Fish and Wildlife Branch.
Participated in the recording of data for the Esperon watershed (at the headwaters of Lambly Creek) in connection with the international hydrologic decade
studies.
Mission City District Office
E. G. Harrison, P.Eng., District Engineer
The Mission City District Office administers the Water Act in the Vancouver
and New Westminster Water Districts in the south-west portion of British Columbia.
The increase in the relatively large population and continued prosperity and
development of the area have brought about further demands on the water resources
to meet the needs of irrigation, industrial, and waterworks projects. These demands
are reflected in the increase in the number of investigations of applications for
water licences and other activities required of this office during the year. The
number of applications investigated and licence reports submitted was up more than
100 per cent over the previous year, and well above the average of any of the five
years this office has been established.
 BB 28 WATER RESOURCES SERVICE
Municipalities which had previously attempted to settle water problems themselves now refer those problems to this office. It has been found that many of the
investigations are complicated and require discussions and meetings with various
representatives and authorities. A long-standing dispute in Sumas between the
municipality and one of the ratepayers was settled, after lengthy investigation, when
municipal equipment removed an unauthorized dam and other works from a stream
under authority of the Water Act.
Considerable time has also been required in the investigation of disputes in
the unorganized areas. One such complaint, regarding control of water levels in
Alta Lake, remains unsettled.
There were no shortages of water attributable to weather conditions or low
stream flows. Any disputes regarding water supply were the result of unauthorized
diversions and were resolved by attention from this office.
Two orders were issued under authority of section 37 of the Water Act, and
several warning letters were sent in connection with offences against the Water Act.
There are now 3,300 active licence files in the Mission City office, including
the 384 new final and conditional licences and approvals received this year. The
office was handicapped by lack of an Assistant District Engineer since we have
been unable to get a permanent replacement for Mr. L. A. Bergman, who was
transferred to the Nelson District office in 1965.
A summary of the work accomplished by the Mission City District office for
the 12-month period November 1, 1965, to October 31, 1966, follows:—
Summary of Year's Work
Applications for water licences—
Applications outstanding, November 1, 1965  109
New applications received  211
Applications inspected and reported on  214
Applications cancelled        9
Applications on hand, October 31, 1966     97
New water licences received—
Conditional licences  185
Final licences   195
New approvals received       4
Final-licence reports submitted  215
Amendment of water licences reported on—-
Apportionments        2
Changes of works     36
Transfer of appurtenancy       9
Reports for cancellation of licences      11
Meetings attended     26
Complaints investigated     50
Ground-water measurements of Lower Fraser Valley wells     12
Nelson District Office
R. A. Pollard, P.Eng., District Engineer
The Nelson District office administers the Water Act in the Nelson, Kaslo,
Cranbrook, Fernie, and Golden Water Districts within South-eastern British Columbia, an area of 26,000 square miles with a population of 110,000.
Staff working in the Nelson office during 1966 consisted of a District Engineer,
two Assistant District Engineers, a field-survey party chief, and a stenographer, all
 WATER RIGHTS BRANCH BB 29
full-time employees. Two student assistants were employed during the summer,
one of these being retained to assist in plotting surveys and other technical work.
Assistant District Engineer L. A. Bergman resigned in August to study for a master's
degree in the United States.
In the Kootenays the 1965/66 winter snow-pack and the 1966 spring melt
rate were average, with the result that there were no unusual freshet-period floods
of natural origin. The early summer was exceptionally cold and wet. The weather
changed in early July and remained dry until late fall. In the West Kootenay there
was no appreciable rain, except local convective precipitation, between July 5th
and October 10th. This drought condition was manifest in unusually low flows or
complete drying up of small streams and springs in the autumn, but, fortunately,
the irrigation demand was small by this late season. In late December, 1965, a
cold snap followed by a heavy snowfall and then a return to mild weather produced
an unusual floe-ice jam on the Kootenay River at Canal Flats, which flooded a farm
and made two families homeless for several weeks. The ice-pack did not move out
until the early spring of 1966.
There was an unprecedented number of complaints in 1966, particularly during the spring, of erosion, sedimentation, slides, washouts, and of slash disposal in
streams due to logging. Most complaints were confined to the populated watersheds
of the West Kootenay near Nelson. Our staff spent about 40 man-days investigating
and reporting on these complaints and inspecting timber sales prior to logging
where an effect on the water supply was anticipated. Repeated inspections by our
staff have been required to follow up the investigation of the original complaints.
Three engineer's orders have been issued to logging operators to clean up streams.
In March the District Engineer met with Nelson Forest Rangers and Fish and
Wildlife Branch management personnel to discuss the effects of logging on water
supply, and some agreement was reached regarding administrative action to be
taken.
During 1966, 249 new conditional licences and 109 new final licences were
added to the office files, making a total of 7,710. Approximately 5,128 licences are
now active (23 per cent of the total for the whole Province), and approximately
2,865 licences have been cancelled.
There was an increase in applications for water licences received in 1966 over
those received in 1965. The number inspected and reported on, however, was
lower than in 1965 because the staff was one engineer short for two months, and
because so much time was devoted to complaints resulting from logging operations.
The number of final-licence survey reports and licence-amendment reports remains
at the same higher level as for 1964 and 1965, which exceeded earlier years.
This year our office designed and prepared contract documents for a new well,
pump-house, and force main at Fort Steele to replace the temporary pumping system
which now supplies the new distribution system serving the Fort Steele restoration
project. Tenders were called, but the only bid received was considered too high.
The work, therefore, has been undertaken with rented equipment and day labour
under our supervision.
Summary of Year's Work
Applications for water licences—
Applications on hand, November 1, 1965  184
New applications received  205
Applications inspected and reported on  124
Applications cancelled or abandoned  19
Applications on hand, October 31, 1966  244
 BB 30 WATER RESOURCES SERVICE
Summary of Year's Work—Continued
Reports on applications for approvals
Final-licence surveys and licence amendments reported on      148
Pollution investigations         21
Flooding and erosion investigations       25
Water-use investigations   6
Meetings with improvement districts and water-users' communities 5
Miscellaneous non-routine meetings and investigations        65
Routine calls and problems  1,789
Outgoing letters and memoranda  1,441
Sampling snow courses        16
Orders issued   6
Dam inspections   6
Engineering Investigations and Studies
Domestic water-supply reports were prepared for a proposed improvement
district at Slocan Park, Radium Waterworks District at Radium Hot Springs, the
Village of Marysville, and for a group of licensees on Barrie Creek near Robson.
Flooding and erosion problems were investigated on Hospital and Thos Creeks
near Cranbrook, McKay Slough near Kimberley, Moyie River at Yahk, Dutch Creek
at Fairmont, Little Bull Creek near Bull River, Salmo River at Ymir, Acme Creek
near Rossland, unnamed creek at Boswell, Rosebud Lake near Nelway, Monroe
Lake near Cranbrook, Kootenay River at Canal Flats, Goose Creek at Krestova,
Goat River at Creston, Kootenay Lake at Lardeau, Slocan River and unnamed
creek at Slocan Park, unnamed stream at Wynndel, Waldie Creek at Robson, and
Lime Lake near Gray Creek.
Pumping tests were conducted for the Beaver Falls Waterworks District's
drilled well and an exploratory dug well for the Fort Steele restoration project.
A pumping-station and force main were designed for the Fort Steele restoration
project at Fort Steele.
An interconnection between springs near Andrew Spring at Nelson and beneficial use of irrigation water under Final Licence 7108 on Birbeck Creek near Gray
Creek were investigated.
A division tank was designed for Trust Brook near Winlaw.
An inventory was prepared of irrigated and irrigable areas in Robson and
Raspberry Irrigation Districts near Castlegar.
The effect of logging on water supply in the Kootenay region of British Columbia and the possible effect of proposed logging in watersheds of Sitkum, Redfish,
and Smoky Creeks near Nelson, Elgood Creek near Rossland, and Duncan Lake
watershed were investigated.
A study was conducted to determine the cause of a shortage of water in Nor-
bury Creek near Bull River.
Dams at Paddy Ryan Lakes near Invermere, Moyie Lake near Cranbrook, and
Marion Creek near Fairmont were inspected.
Pollution problems investigated included the possible pollution of Wasa Lake
by proposed pulp-mill at Skookumchuck, Grigsby Spring near Ymir, La France
Creek near Boswell, Coffee Creek near Ainsworth, Bernard Creek near Mirror Lake,
Giveout Creek near Nelson by logging-roads, Pedro Creek at Winlaw, Bradley and
Bourke Creeks near Nelson by logging, Floyd Creek near Lister by poultry, Cow
Creek, Mark Creek and St. Mary River near Kimberley by Cominco's mining operation and fertilizer plants, Burrard Brook near Nelson and Goldsmith Creek near
Kaslo by highway construction, Lussier River near Wasa by gypsum-mining, Scho-
 WATER RIGHTS BRANCH BB 31
field Creek near Kinnaird and Redfish Creek near Nelson by bulldozers grading
residential land, Sheep Creek near Salmo by sawdust and stream-channel cleaning,
Goat River at Creston and Balfour Creek at Robson by garbage, and Wilds Creek
near Wynndel by mineral-prospecting.
Prince George District Office
J. C. Purnell, P.Eng., District Engineer
The Prince George, Quesnel, Peace River, Liard, Fort Fraser, Hazelton, and
Prince Rupert Water Districts, which comprise the northerly two-thirds of British
Columbia, are administered by the Prince George District office. The office is
staffed by a District Engineer, an Engineering Assistant, and a stenographer. One
student assistant is employed during the summer survey season to assist with final-
licence surveys and other survey work.
Cool moist weather occurred in nearly all areas throughout the growing
season, which resulted in very little irrigation being required. There were no water
shortages during the year. The Prince Rupert and Hazelton Water Districts along
the Skeena and Bulkley Rivers near Terrace and Smithers experienced flash floods
during the month of October due to heavy snowfall followed by warm weather and
rain. The floods resulted in loss of several highway bridges. Precipitation recorded
at Prince George for the year was 27.38 inches, which was slightly above the normal
of 24.67 inches for this area.
An increase in the demand for water for mining purpose has been observed
in the Prince Rupert, Hazelton, Fort Fraser, and Prince George Water Districts.
Water requirements for pulp-mills are also on the increase, with applications for
water licences being received for mills at Quesnel, Houston, Prince George, and
Kitimat, and a future mill is proposed on the Parsnip River north of McLeod Lake.
The water requirement of each of these mills is in excess of 100 c.f.s.
Water licence applications received were 164, an increase of 29 over 1965,
setting a new record. The number of applications reported on has risen 300 per
cent over the 1963 level; however, there is still a considerable backlog of applications to be reported on, with 85 applications still on hand.
There has been an increase over 1965 in water licence amendments requiring
attention. With the increasing public awareness of the need for these amendments,
we can expect a continuous rise in future years.
The district office assisted the Water Investigations Branch in its study of the
effects of log-driving on the Stellako River. The time spent on this study resulted
in the noticeable cut-back in surveys completed in 1966. This office also continued
assistance to the ARDA engineers, with piezometer readings being taken once each
week on five ground-water test wells.
There was continued interest in formation of new improvement districts. Three
new districts were incorporated this year—College Heights, Ste. Marie, and Park-
ridge Heights Improvement Districts.
The rapid expansion within improvement districts immediately adjacent to
Prince George has been particularly noticeable in the past year, due to the heavy
demand for reasonably priced land outside the city boundaries. It is interesting to
note that those improvement districts having substandard systems and limited water
supplies are finding it extremely difficult, and in some cases impossible, to supply
all existing parcels of land within their boundaries, resulting in little growth within
the district or up-grading of their present facilities. On the other hand, those districts having adequate supplies and standard systems are experiencing a tremendous
increase in water-users on their systems.
 BB 32 WATER RESOURCES SERVICE
The establishment of a Land Registry Office in Prince George has greatly
assisted this office in establishing property-ownership and legal descriptions of lands
on which water applications have been made. We have been able to assist the
Kamloops District office and the Water Licensing Division in Victoria in obtaining
plans and carrying out title searches.
Interest in the ground-water potential in the Pineview area, south of Prince
George, has continued. Four new test wells were drilled by the Groundwater
Division, and drilling and development of a flowing artesian well south of the airport were carried out by private enterprise.
Summary of Year's Work
Applications for water licences—
Applications on hand at beginning of year  62
New applications received  164
Applications inspected and reported on  121
Applications cancelled or abandoned  20
Applications on hand at end of year  85
Conditional licences added to files  80
Final licences added to files  37
Active-licence files   1,054
Cancelled or abandoned licences  522
Final-licence surveys completed   45
Routine items and problems  703
Dam inspections   4
Meetings with improvement districts  9
Miscellaneous investigations  10
Flooding and erosion investigations  6
Outgoing letters and memoranda  473
Engineering Investigations and Studies
Investigated and reported on complaints of flooding and erosion on Bateman
Creek and Willow River near Giscome and Sinkut River south of Vanderhoof,
flooding caused by alleged dynamiting of beaver dams on Upper Dragon Creek
near Quesnel, and flooding allegedly caused by control of levels on Eaglet Lake
at Giscome.
Continued the field study of flooding and erosion on Kispiox River north of
Hazelton, assisted by Department of Agriculture personnel.
Prepared design and cost estimates for protective revetments on the Bulkley
River at Houston and on the Pouce Coupe River near Pouce Coupe.
Assisted Water Investigations Branch on study of the effects of log-driving on
the Stellako River and investigation of erosion on the Nechako River at Vanderhoof.
Prepared design and cost estimate of sewer and water extensions for Fort Nelson Improvement District.
Completed a survey and assessment of the existing distribution system in
Charella Gardens Waterworks District.
Victoria District Office
D. E. Smuin, P.Eng., District Engineer
Water districts under the jurisdiction of the Victoria District office are Alberni,
Nanaimo, and Victoria, comprising Vancouver Island and the Gulf Islands.   The
 WATER RIGHTS BRANCH BB 33
staff at present consists of one District Engineer and one engineering technician.
Clerical duties are performed by the staff of the Water Licensing Division.
The current industrial expansion which has caused a rapid increase in use of
water has not been so evident on Vancouver Island, where lumbering is still the
main industry. Mining, however, has played a part in the continuing interest in
water, and several operations on the Island required investigations by this office
in connection with applications for water licences or complaints of water pollution.
Flooding occurred from some major streams in January and again in December,
particularly in the south-east part of Vancouver Island. In contrast, precipitation
during the summer months was normal and some water shortages were experienced
in the Duncan-Nanaimo area.
A number of meetings were held and investigations made during the year concerning licensing and water use and erosion, pollution, and flooding problems.
Greater awareness by the public of the value of water rights has resulted in many
inquiries being received, with consequent applications for water licences being made.
Mr. Charles Errington, P.Eng., Victoria District Engineer since 1949, retired
from office in October.   His duties were taken up by the writer.
Summary of Year's Work
Applications for water licences—
Applications on hand at beginning of period  27
New applications received  183
Applications inspected and reported on  139
Applications refused, abandoned, and cancelled  22
Applications on hand at end of period  49
Engineering Investigations and Studies
Investigated flooding from Nanaimo, Chemainus, and Cowichan Rivers, within
the south-easterly part of Vancouver Island.
Investigated flooding affecting private property and the public highway at
Kelsey Bay in company with Highways Department District Engineer.
Reviewed water-supply potential for Parksville with village water commissioner.
Inspected proposed bridge alterations by MacMillan, Bloedel and Powell River
Company over Koksilah River near Duncan.
Attended meeting and reviewed plans for water supply to proposed gaol at
Saltair.
Inspected dam at fourth Nanaimo Lake.
Continued discussions with District of Saanich re control of Prospect Lake
flooding.
Investigated a complaint of pollution of Tsolum River by mill tailings from
the Mount Washington Milling Company.
Investigated flooding at Duncan and Cowichan Lake resulting from excessive
rainfall during December.
IMPROVEMENT DISTRICTS DIVISION
P. J. Leslie, P.Eng., Chief of Division
The number of improvement districts in operation has been increasing steadily
for many years, as illustrated in Plate 4, and there is now a total of 321 districts in
existence. During the year the following new districts were incorporated: College
Heights Improvement District, East Latoria Road Waterworks District, Heffley
 BB 34
WATER RESOURCES SERVICE
NUMBER    OF
IMPROVEMENT   DISTRICTS
3ZV
280
240
200
160
120
80
40
321
I9G6
1920 1925 1930 1935 1940 1945 1950 1955 1960 1965
Plate 4
 WATER RIGHTS BRANCH
BB 35
Creek Waterworks District, Hillside Waterworks District, La la Hache Improvement
District, Lakeside Orchards Improvement District, Parkridge Heights Improvement
District, and Ste. Marie Improvement District. The following districts were dissolved: Hudson Hope Improvement District, Michel-Natal Hospital Improvement
District No. 35, and 100 Mile House Sewerage District. Osoyoos Irrigation District
and East Osoyoos Irrigation District were amalgamated under the name of Osoyoos
Irrigation District.
The object (or objects) for which a district is incorporated is set out in its
Letters Patent. Upon petition of the Trustees, action may be taken to have such
Letters Patent amended to include extra objects, and many districts which were
originally incorporated for one purpose now have several. The activities for which
the existing districts are responsible include irrigation (system ownership and
operation); domestic waterworks (ownership and operation); dyking-works;
drainage-works; land-improvement works; fire protection (provision and (or)
operation); street-lighting (provision and (or) operation); garbage collection and
(or) disposal; sewerage-works (ownership and operation); parks and playgrounds
(provision and (or) operation); cemetery operation; community hall provision
and (or) operation; electric-power generation and (or) distribution; mosquito
control (financial aid toward); hospital provision and operation (or provision of
financial aid toward building and (or) operation of a hospital); and ambulance
service (ownership and (or) operation).
Improvement districts incorporated for hospital purposes are distinctively
named, with the words " Hospital Improvement District No. " contained within
the corporate name. There are 35 such districts now in existence. Two of these
have the responsibility for the provision and the operation of hospital facilities, but
the remainder are responsible only for providing financial aid toward the constructing, equipping, or operating of a hospital in the vicinity.
All improvement districts are empowered by the Water Act to raise revenue
by the levying of a tax or taxes upon one or more of a number of bases, and to raise
money by the imposition of tolls and charges. They are also empowered to issue
debentures to obtain funds for capital purposes, this being the usual method in use.
In many cases, improvement district debentures and the interest thereon are guaranteed by the Province pursuant to the Improvement Districts Assistance Loan Act.
At the present time there is $13,560,600 of such guaranteed debentures outstanding, of which $621,600 was guaranteed during 1966.
During the year, capital works projects to a total value of $3,635,096 were
completed by improvement districts and financed as follows:—
ARDA     $544,000
Municipal Development and Loan Board debentures       179,750
District resources and borrowing  2,911,346
Section 62 of the Water Act enables districts to obtain current operating funds
as advances from the Province (for certain purposes only) and to utilize the services
of the local Provincial Assessor and Collector to collect these advances from the
land-owners in the areas and to repay the Province. The purposes for which this
procedure may be used are fire protection, street-lighting, hospital purposes, and
ambulance services, providing they are supplied by a fire protection or hospital district. If a larger amount is required for capital purposes, and collection and repayment by the Provincial Collector in the same year would result in too heavy a tax
burden for that year, an advance of the required amount may be obtained from the
Province, with collection and repayment carried out over a number of years. During
1966 the following advances and collections were made under this section of the
Act:—
 BB 36 WATER RESOURCES SERVICE
Assessed and collected for repayment of amounts advanced
for the current year  $1,362,869
Amounts advanced in 1966 by the Province repayable in
future years     1,301,500
Assessed and collected for amounts advanced with repayment over a number of years        254,892
Total long-term advances outstanding as at December 31,
1966      1,489,755
Engineering Services
The Engineering Section of the Improvement Districts Division handles the
technical and engineering work associated with improvement districts throughout
the Province. This is principally concerned with domestic water supply, irrigation,
drainage, and sewerage projects.
An important facet of the work consists of investigating and reporting on the
engineering and economic feasibility of new schemes and checking the technical and
financial aspects of proposals submitted by districts.
Other duties include assistance to districts in operating existing engineering
works and the dispensation of technical advice. In some instances a complete
engineering service has been provided for a particular project from the initial investigation stage to preparation of the design drawings, contract documents and specifications, and, finally, supervision of the installation of the works.
The following is a list of assignments completed during the past year:—
Review of Water Supply and Sewerage Proposals
Barrier Irrigation District.—A review of plans and specifications for a domestic
water system to serve Barriere Irrigation District resulted in approval for the project.
It is anticipated that construction will be completed early in 1967.
Big Eddy Waterworks District.—Approval was given to plans for replacements
and improvements to the district's existing domestic water-supply system.
Blue River Waterworks District.—Approval was given to a domestic water-
supply scheme for the Blue River Waterworks District. The system was installed
during the summer.
Chase Waterworks District. — Plans and specifications were approved for
works required by the district to supply water to the Sahhaltkum Indian Reserve.
East Latoria Road Waterworks District.—The East Latoria Road Waterworks
District near Colwood was incorporated in June of this year. The district has submitted plans for installing a domestic water-supply system, using a bulk supply from
the Greater Victoria Water District.
Ellison Irrigation District.—A preliminary design prepared by the Kelowna
District office for rehabilitation of the Ellison Irrigation District's system was
reviewed.
Fort Nelson Improvement District.—Following protracted negotiations to
evolve a satisfactory cost-sharing arrangement between the district and the West-
coast Transmission Company, approval was given to sewer and water-supply extensions to serve the 55th Avenue area. Sewer and water extensions to the G. W.
Carlson School were also approved.
Hagensborg West Water Supply.—A feasibility report for the construction of
a domestic water supply to serve Hagensborg West was reviewed. The scheme is
not considered economically feasible at this time.
 7V^d:J7:7S:7r,977ZZZ7^
-■-■■-."-7-:-u 7
Reconstruction of Murray Creek Dam, Spences Bridge Waterworks District.
 BB 38 WATER RESOURCES SERVICE
Lac la Hache Improvement District.—Preliminary approval was given to proposals to service the community of La la Hache with sanitary sewers and sewage-
treatment facilities.
Lower Nicola Waterworks District.—After several unsuccessful attempts had
been made to locate a satisfactory ground-water source to supply the district, it was
decided to adopt a scheme for pumping from the Nicola River. Contractors' bids
for the works, however, exceeded the estimated costs, and the district's consulting
engineer is at present preparing a revised system design in an attempt to reduce costs.
North Saltspring Waterworks District.—Plans of water-system extensions to
serve the Hundred Hills Subdivision were approved.
North Wellington Waterworks District.—Approval was given to preliminary
plans for a sewerage scheme to serve the North Wellington Waterworks District. At
a plebiscite held in November, a majority of land-owners voted in favour of amending the Letters Patent of the district to include sewage disposal.
Okanagan Falls Irrigation District.—Proposals for installing a sanitary-sewer
system for the community of Okanagan Falls were reviewed. The scheme is, however, being temporarily held in abeyance.
Parkridge Heights Improvement District.—A domestic water-supply and sewerage scheme for the recently incorporated Parkridge Heights Improvement District
near Prince George was approved and installed.
Rayleigh Waterworks District.—After some difficulty had been experienced in
locating a suitable aquifer, a well was drilled having sufficient yield to supply the
domestic water requirements of the district. The district's consulting engineers are
currently engaged on the system design.
Ships Point Subdivision, Vancouver Island.—Following a Water Rights report
on a proposed amalgamation of the Ships Point Subdivision with the Fanny Bay
Waterworks District, the subdividers decided to install a separate water system.
The consulting engineer's plans of the proposed works were approved.
Sorrento Waterworks District.—Following submission of a revised design,
tenders for the installation of a domestic water-supply system were recalled early in
the year, and the contract awarded in May. The system is now installed and
operating.
Todd Hill Irrigation District and Thompson Park Waterworks Company Limited.—A public utility-—namely, Thompson Park Waterworks Company Limited—
supplying water to a residential subdivision bordering the Todd Hill Irrigation
District near Kamloops has requested amalgamation of the two authorities. The
technical and economic feasibility report regarding the proposed amalgamation was
reviewed, and meetings were held with the Trustees to consider the policy to be
followed.
West Lantzville Waterworks District.—Plans were approved for the installation
of a domestic water-supply system to serve the West Lantzville Waterworks District.
The system is now in operation.
Investigations for Reports
Alta Lake Area.—An investigation was made to determine the probable cost
of providing a domestic water supply for the community on the west shore of Alta
Lake near Pemberton. The scheme envisaged would use Scotia Creek as a source
of supply.   A report will be released early in 1967.
Clearwater District.—A report describing alternative schemes for supplying
water to the Clearwater district in the North Thompson Valley and the estimated
costs will be completed shortly.
 WATER RIGHTS BRANCH
BB 39
French Creek-Hilliers-Coombs Area.—A number of small communities lying
between Cameron Lake and Parksville have requested that the possibility of supplying the area with water from Cameron Lake be investigated. Preliminary studies
are at present being made.
Grantham Area Water Supply.—Grantham is a small farming community distributed along the Courtenay-Merville Road. As many of the residents have spent
considerable sums in drilling unsuccessfully for water, an investigation was made to
determine whether installation of a community supply would be feasible. It was,
however, concluded that unless a local source could be found, such a scheme would
not be economic.
Sechelt Area Water Supply.—The Village of Sechelt and three adjacent communities are at present supplied with water by a private water company. The system
was originally installed in 1929, and many of the components are now nearing the
end of their useful service life. At the request of local organizations, a study of the
water-supply position in that area is being carried out to provide the communities
concerned with a guide for future planning.
West Howe Sound Area.—There are at present six independent domestic
water systems in the Gibsons area. These systems are proving inadequate to meet
the needs of the expanding population, and it has been proposed that an area
organization should assume the responsibility for an over-all water-supply scheme.
The various sources of water in the area are being studied in detail, and a report is
being prepared to set out the technical and financial implications of such a scheme.
Reports Prepared
Black Creek Area.—A report examining the problem of supplying water in
the Black Creek area was prepared. A pumped supply from the Oyster River was
found to be the most favourable possibility, but economic feasibility could not be
established, due mainly to the low population density.
Canyon Waterworks District.—Following completion of the contract for the
rehabilitation of the farm water-supply system for Canyon Waterworks District, an
" as constructed " report was prepared. This report contained a full description of
the works, together with construction drawings, recommended procedures for system
maintenance and operation, and suggestions regarding future administrative policy.
Comox Valley Water Supply.—-The larger communities in the Comox Valley
are using their water-supply systems to their full capacity and must seek additional
sources of water in the immediate future. A report setting out the technical and
economic implications of a regional water-supply system for the valley was prepared.
It was recommended that if the communities concerned decided to proceed with
such a scheme, a gravity supply from the Puntledge River should be adopted.
Little River Area.—A long history of complaints regarding low flow, flooding,
and tidal conditions at the mouth of Little River near Comox resulted in an investigation by Water Rights personnel. The subsequent report found that the causes
of complaint were natural in origin. Tentative remedial measures were outlined,
and the formation of an improvement district to implement them was recommended.
Long Beach Area Water Supply.—A report was prepared on the technical and
economic feasibility of providing a domestic water supply to the Long Beach area
between the Villages of Ucluelet and Tofino. The report found that such a project
was not economically feasible, and recommended that consideration be given to an
over-all water scheme for the peninsula, using Kennedy Lake as the source.
 BB 40 WATER RESOURCES SERVICE
Sointula Waterworks District. — The majority of residents of Sointula, on
Malcolm Island, obtain their water supplies from individual wells. Many of these
yield an inadequate supply after periods of dry weather and are subject to pollution
from septic-tank effluent. Early in the year a test well was drilled, and a subsequent
report set out the technical considerations which would govern the exploitation of
this source, together with the financial implications of installing a water system to
serve approximately 170 connections.
West Lantzville Waterworks District.—A report was prepared on a domestic
water-supply system for the small community of West Lantzville. A well previously
drilled by residents of the district was recommended as a source of supply.
Wilson Creek Area Water Supply.—The Wilson Creek area on the Sechelt
Peninsula at present has no community water-supply system, although there are
more than 100 homes in the area. A report was prepared outlining three possible
schemes using surface and ground-water sources, and indicating the probable costs
involved in each case. The financing of a water system for this area is complicated
by the inclusion of the Tsawcome Indian Reserve, which has been subdivided and
leased.
Design and Engineering Services
Canyon Waterworks District.—Minor problems arising from the operation of
a new farm water-supply system were investigated and rectified. A final inspection
of the works was made after the 12-month contract maintenance period, and the
contractor discharged.
Charella Gardens Waterworks District.—The wells which supply the Charella
Gardens Waterworks District are of inadequate yield to meet the district's requirements. Advice was given on what steps would be necessary to obtain an alternative
source of supply.
Gold Bridge Waterworks District.—Rehabilitation of the Gold Bridge Waterworks District's system was completed in November, and it is now in operation and
serving 30 homes in Gold Bridge. The design and supervision of construction was
carried out by Water Rights personnel. Local labour and machinery were employed
to install the works.
Grandview Waterworks District.—The design and specifications for the water
system to serve Grandview Waterworks District were completed, and the contract
was awarded in June, 1966. Design and supervision were carried out by Water
Rights personnel, and the work was completed by October, 1966. This project
was financed under the Agricultural Rehabilitation and Development Act.
Lions Bay Improvement District.—An inspection was made of the water system serving the Lions Bay Improvement District, and advice given regarding operation of the system.
Royston Improvement District.—Royston Improvement District, which is
supplied with water from the Cumberland system, has for some time suffered from
surging problems in its main line. The system was analysed and remedial measures
discussed with the district.   At last report the system was functioning satisfactorily.
Spences Bridge Waterworks District.—Reconstruction of the Murray Creek
Dam was carried out to designs prepared by the Division and under its supervision.
The new dam is a mass concrete structure 22 feet high.
Willow Point Waterworks District.—A field investigation and study of supply
conditions in the Willow Point Waterworks District were made to determine future
major pipe-line requirements.
 WATER RIGHTS BRANCH BB 41
Wood Lake Improvement District.—Approval under the Agricultural Rehabilitation and Development Act has been given to the construction of an irrigation
system to serve the Wood Lake Improvement District, near Oyama in the Okanagan.
Water Rights personnel are preparing final designs and specifications for a gravity
system supplying water for sprinkler irrigation to 832 acres of orchard land in the
district.   Construction is expected to start early in 1967.
Throughout the year, personnel from the Division travelled extensively in the
Province, holding meetings with district trustees, organization committees, municipalities, and other groups actively concerned with problems of development.
The increasing impetus of the Agricultural Rehabilitation and Development Act
programme was apparent, and despite some difficulties caused by widely fluctuating
construction costs, the Division concluded a successful year.
POWER AND MAJOR LICENCES DIVISION
The Power and Major Licences Division is responsible for engineering and
administrative duties in connection with the use of water for power generation and
for other substantial uses.
The various duties performed by the Division include:—
(a) Reporting upon the suitability of all power licence applications, and
undertaking any further investigations that may be required.
(b) Administration of the Water Act in so far as it applies to the use of water
for power purposes, including the calculation and billing of annual rentals
and fees.
(c) Investigation and research necessary to guide the development of Government policy with respect to the utilization of the hydro-electric power
potential of the Province.
(d) Carrying out an engineering review of plans for major licence applications
for industrial and mining purposes.
(e) Compilation of statistics concerning the use of water for all purposes as
a guide to future water-resource planning.
(/)  Inspection of all major dams in the Province.
Major Licensing Administration
All water licence applications for power purposes are scrutinized by an engineer
of the Division for feasibility and to determine the rentals payable. Where the
amount of power to be developed is fairly substantial, further investigation may be
made by the Division, including, where necessary, the use of specialist consultants.
In the case of major licence applications, special attention is paid to public
safety. This may require carrying out specific studies or obtaining expert advice on
such matters as the stability of dams and the necessary measures for dealing with
floods. In the case of power licences, the optimization of site potential is reviewed
in terms of the economic integration of the proposed hydro development into Provincial loads and resources.
Other aspects, commonly taken into consideration as being in the public interest, are the extent to which reservoirs should be cleared of timber, the effects on
fish and wildlife, and the possibility of the use of reservoir areas for recreation.
Existing Licences
The duties of the Division staff with respect to existing power licences consist
of the calculation and billing of annual rentals and fees; the compilation of annual
generation figures for use in calculating rentals and preparing statistical records;
 r ±
Pipe-laying at Grandview Waterworks District near Armstrong.
 WATER RIGHTS BRANCH BB 43
administration in connection with special clauses in licences, including carrying out
the necessary studies and investigations; and interpretation of the Water Act with
respect to use of water for power purposes, including any general matters pertaining
thereto.
In certain major storage licences, notably those applying to the Columbia River
and Peace River power projects, the powers of the Comptroller have been set forth
explicitly in special clauses in the licences. These special clauses cover such matters
as approval of plans for dams and other structures, the clearing of reservoirs, public
access to reservoirs, the release of water from reservoirs, and the protection of fish
and wildlife. Thus an important function of the Power and Major Licences Division
is the implementation of studies and administrative work necessary to enable the
Comptroller to exercise his responsibilities with respect to such major water-
resource projects.
During 1966, work proceeded on the approval of plans for the Peace River
and Columbia River. With major developments of this nature, approval of plans
is a process which is expected to continue throughout the period of construction for
each project.
Because of the highly specialized nature of major dam construction, it is often
necessary for the Comptroller to obtain advice from specialist consultants of internationally recognized stature during the review of plans for major dams. For the
Portage Mountain Dam, the Department's general consultant is Mr. D. J. Bleifuss,
of Atherton, Calif., who is actively involved in major dam projects on four continents. Dr. H. Q. Golder, of Toronto, Ont., has been retained as specialist consultant on soil and foundation problems for this project. Mr. Bleifuss is also acting
as consultant for the Duncan Lake Dam, while the consultant for the Arrow Lakes
and Mica Creek Dams is Mr. F. B. Slichter, of Burke, Va. Mr. Slichter was formerly
chief civil engineer of the U.S. Corps of Engineers, and brings from his career with
the corps a wide experience with dams and other hydraulic structures.
The Power and Major Licences Division is responsible for the background
work necessary in making the services of the specialist consultants effective in providing the advice necessary to the Comptroller in the approval of plans. During
the course of this work in 1966, meetings were held with these consultants and
with engineers of the British Columbia Hydro and Power Authority and its consultants. During 1966, visits were made to the Portage Mountain, Arrow, Duncan,
and Mica sites with Mr. Bleifuss, Mr. Slichter, and Dr. Golder in attendance.
Other Major Licences
The Division is also responsible for the review of plans and other details in
connection with major licence applications. A number of major licence applications are being processed by the Branch at present, principally for use in pulp and
paper plants and in mining operations. Worthy of particular mention is the development by Celgar Limited at Prince Rupert of additional storage by the construction
of a new dam on Rainbow Lake and the raising of the existing dam at the outlet of
Diana Lake to form one large interconnected reservoir. These dams were the
subject of detailed review during the design and construction stages, and in October
a final inspection was made upon completion of the work.
Power-policy Planning
An important duty of the Division is to assist in the over-all planning of power
development in the Province. Studies are made of all potential major developments
to determine how they might best fit into a Province-wide hydro-electric system.
 BB 44 WATER RESOURCES SERVICE
This is a continuing task, as fresh scientific and engineering developments constantly improve the feasibility of different projects and thus entail periodic reassessment of the situation.
Specific fields of study in connection with power-policy planning include the
compilation of historical electric-power generating records and the preparation
therefrom of forecasts of future load growth; studies of international power-system
developments, such as the Columbia River; investigation of other public benefits
obtainable at hydro-electric developments; and preparation of an inventory of
available undeveloped power resources.
Undeveloped Water Power in British Columbia
In 1954 the Water Rights Branch published a booklet entitled " Water Powers
of British Columbia." Studies subsequent to that date have shown the available
potential to be several times greater than was then anticipated. Because of this, a
review has been made to up-date the information previously published and to make
a more realistic estimate of the Province's undeveloped hydro-electric power resources. In the past, calculations of power potential have been unduly conservative, and it is therefore intended to correct this situation, taking into account modern
techniques in the development of major sites and the transmission of power over
long distances.
For some years the Department of Energy, Mines, and Resources (formerly
part of the Department of Northern Affairs and National Resources) of the Government of Canada and the Water Rights Branch of the Government of British
Columbia have been engaged in the compilation of an index of known undeveloped
hydro-electric power sites in British Columbia, which is itself part of a study covering the whole of Canada. The assembly of data is now more or less complete, and
a summary, showing the up-dated totals for different areas of the Province, was
included in the 1966 Annual Review of Water Powers of British Columbia, published by the Water Resources Service in July, 1966. The next stage of the study
consists of determining the contributions which individual sites can be expected to
make when operated in an integrated system. It is believed that this method of
calculating potential output will increase the total from known sites by perhaps as
much as 50 per cent on the present figure of 23,930,000 kilowatts. It must be
remembered, however, that many sites have not yet been investigated at all, and it
is possible that the ultimate total may be several times that amount.
Developed Hydro Power
The following paragraphs summarize the development of hydro-electric power
in British Columbia during the past two years. For further details, reference should
be made to previous Annual Reports or to the Annual Reviews of Water Powers of
British Columbia.
During the past few years the most massive hydro-electric construction programme in the history of British Columbia has been proceeding on schedule. Four
major dams, one on the Peace River and three in the Columbia River basin, are
being constructed to provide power, flood control, and downstream flow regulation.
Private industry also is increasing its potential; Cominco Limited, for instance, has
installed a new unit at its Waneta plant. Other companies are planning additions
in the near future, and the City of Revelstoke recently doubled the capacity of its
Walter Hardman plant by the addition of a second 4-megawatt unit.
 WATER RIGHTS BRANCH
BB 45
DEVELOPMENT  OF   HYDRO-POWER
BRITISH   COLUMBIA
BRITISH    COLUMBIA    TOTAL
GENERATING   CAPACITY
AND
ANNUAL   LOADS
The peak  bads  of individual   power   plants     rarefy
occur at  the same time. The  Total of Plant Peak Loads
thus  exceeds   the highest simultaneous output   of
all  B-C. hydro plants, though  the  yearly   changes
shown   in  the  Sraph  should be similar in  size  and
direction.
2000
b
Q
1000  Z
BOO  3
O
600  V.
19ZO     1325      1330     1935      1340     1345      1350      1955      I960     19S5     1370      1975
CALENDAR     yEAR
Plate 5
 BB 46
WATER RESOURCES SERVICE
DEVELOPMENT  OF   HYDRO-POWER
IN
BRITISH   COLUMBIA
ANNUAL    PRODUCTION  OF   HYDRO-ELECTRIC   ENERGY
BY    MAJOR    PRODUCERS
BCHPA
\?s
,.
f
BCE
BCE
■ BCPC
'//y
\y
cm as
#>
hALCAN
-BCPC
J*
i
/■'
cF-   •
' V
/
fp*~^r
/
Jr
__>
f
3
5000 <o
4000   -S
O
3000   3.
2000   k
I
1000 $
Ic.
500
400
300
200  5
1920     1925      1930      1935
1940     1345      1950     1355      1360     1365      1970     1375
CALENDAR     YEAR
ALCAN
BCE
BCPC
cms
BCHPA
Aluminum    Company of   Canada.
British Columbia Electric   Company f
„.,.._,,./. _- I Snown   solid untii omolaamat>on  ttien  dotted.
British Columbia   rbmsr Commission. J J
Consolidated Mining 4 5meltlng  Company / Ynsst Kootenay pbiver 4 Light   Company.
British Columbia   Hydro   * Power Authority - Shown   dotted   prior   to oma/qai
INSTALLED    GENERATING    CAPACITIES
OF    MAJOR      PRODUCERS
then  solid.
5000
3000
2000
/
BCHPA
\     >
^-bce
,r /
§ /
BCE
* BCPC
/ fj
^~ALC4
N
ys
fy
J
/
500
i
_A
/r
i
cua
400
300
'   \
/
^BCPt
.
//
—1-
/
200
BCE/-'
/,
 t
A
f
'
ants/
1
100
1320     1925      1930     1935       1940      1945      1950      1955       I960     1965     1970      1975
CALENDAR    YEAR
Plate 6
 WATER RIGHTS BRANCH
BB 47
Generation and Load Growth
During 1965 the total amount of energy generated by hydro-electric plants in
British Columbia was 15,257,960 megawatt-hours, representing a decrease of 1.9
per cent on the corresponding figure for 1964. Thermal-electric generation
amounted to approximately 3,238,000 megawatt-hours, nearly double the previous
year's figure. Imports of electrical power, which in the past have been negligible,
jumped to a substantial level and amounted to 456,000 megawatt-hours (net).
Thus, although the over-all increase in power generated within the Province was
7.1 per cent, the load grew by 10.0 per cent.
The total energy generated 10 years earlier, in 1955, was 8,465,000 megawatt-
hours, so that over the last 10 years the load has grown at an average rate of 8.0
per cent compounded annually. Generation by private industry accounts for about
half of the total, most of which is produced by the two major industrial users,
Aluminum Company of Canada at Kitimat and Cominco Limited at Trail and
Kimberley, who account for 26 and 20 per cent respectively of the Provincial total.
It is inevitable, therefore, that the characteristics of these two industrial loads are
reflected very heavily in the Provincial total.
Plate 5 shows the hydro-electric development in British Columbia to date, and
the following table shows the hydro and thermal generating totals for the past 11
years. Plate 6 shows the breakdown of generating statistics amongst the major
producers.
ELECTRICAL GENERATING STATISTICS FOR BRITISH COLUMBIA, 1955-65
Year
Electrical Generation in Gwh.
Hydroi
Thermal
Total
1955                                                     ...                             	
7,860
9,315
10,161
11,219
11.750
605
688
542
686
712
8,465
10,003
10,703
11,905
12,462
13,634
13,372
14,748
15,609
17,271
18,496
1956  	
1957                         _ _ 	
1958                                                    .. _  	
1959                    _ _	
I960                                                               	
12,669       |           965
12,371                1,001
13,572                1,176
14,262                 1,347
15,558       j        1,713
1961    _      	
1962                                       _ 	
1963                                  _                     _	
1964                        _  	
1965                        ...      _     _   	
1 From Water Rights Branch records.
2 From Bureau of Economics and Statistics.
Interim Estimate of Generation during 1966
An advance estimate of the total electric generation in British Columbia during
1966 is 21,000,000,000 kilowatt-hours, which represents an increase of 13.6 per
cent on the corresponding figure for 1965. However, as there was a substantial
import of power in 1965, the increase in load works out at 10.9 per cent. This is
even higher than the increase from 1964 to 1965, which was 10.0 per cent. Further
details are shown in the tabulation below.
 BB 48
WATER RESOURCES SERVICE
Generation in Gwh.
Per Cent
1965
1966
Decrease
Utilities-
Hydro _     .           	
7,017
1,990
8,070
2,883
+15.00
Thermal __ _                 	
+44.87
9,007               10,953               +21.60
Industries—
8,241                 8,966                +8.79
Thermal   _	
1,248                1,093               —12.42
Sub-totals  	
9,489               10,059                +6.00
Hydro sub-totals   	
15,258
3,238
17,036
3,976
+11.65
Thermal sub-totals    .
+22.79
Total generation  _ 	
18,496
456
21,012
+13.60
18.952         1       21.012
+ 10.86
Note.—All 1966 figures subject to revision.
Hydro-electric Power Projects under Construction
Additional Installations at Existing Plants
The fourth and final 90-mw. unit at Cominco Limited's Waneta plant commenced operation on September 30, 1966.
Peace River Development
Apart from planned additions to existing plants, the next major hydro-power
installation to be completed in British Columbia will be the Portage Mountain Dam
on the Peace River, which is scheduled for first power production late in 1968.
The diversion-works for Portage Mountain Dam were completed in time to
withstand the 1964 summer freshet, which was the highest ever recorded. Fill-
placing operations were started in August, 1964, employing a 15,000-foot-long
conveyer system, which is the world's largest, and was built at a cost of $10,000,000.
A total of 45,622,906 cubic yards of embankment material has been placed
so far, and of this total 23,373,307 cubic yards were placed during the 1966 season.
This brings the embankment above the 425-foot mark, and represents 79 per cent
of the 56,800,000 cubic yards to be placed. This year a world record was achieved
on July 19th when a total of 163,200 cubic yards was hauled, placed, and compacted
in a 24-hour period. It can be seen that a continued rapid placement rate was maintained throughout the season by comparing the 23,373,307 cubic yards placed this
year with the scheduled quantity of 19,500,000 cubic yards or with the 18,469,600
cubic yards placed in the 1965 season. Embankment placement is under the main
dam contract, which was let to the Kiewit, Dawson, and Johnson consortorium in
1963 at a price of $73,600,000. Extra work orders and increased prices have
caused the value of the contract to rise to approximately $82,000,000; the contractor's earnings to date total approximately $67,000,000.
The power-house contract, which was let in 1965 to the Northern, Stewart,
Morrison-Knudson, Perini, and Jones consortium at a price of $77,000,000, started
somewhat slowly, but the rate of progress has improved considerably during the
last year.  The contractor's earnings to date total approximately $36,000,000.
Other contracts let in 1966 totalled $71,226,000, the bulk of this, $43,868,000,
being for the construction of the spillway and low-level outlet works, which was let
to the Kiewit, Dawson, and Johnson consortium.   The remaining $27,358,000 was
 WATER RIGHTS BRANCH BB 49
for a number of contracts including central control building, power intake gates,
transmission-line clearing, transmission-line equipment, low-level outlet materials,
spillway gates, low-level outlet gates, and gate-hoisting equipment. These contracts
are all progressing satisfactorily.
Columbia River Development
Arrow Lakes Dam.—Preliminary activities on the project were in progress in
late 1964. These consisted of construction of a pipe-line to the Celgar pulp-mill,
land acquisition, and railroad relocation. Early in 1965 the contract for the main
dam was awarded to Foundation Dravo, Limited at a price of $55,000,000.
Construction of the concrete section of the Arrow Lakes Dam began in April
following completion of the cofferdam. The 1,200-foot-long concrete section will
include a navigation lock and reservoir discharge-works. The earth section of the
dam is being constructed simultaneously by bottom-dump barges placing fill material
under water. The contractor's earnings to date total approximately $27,000,000,
and progress on the contract to date is ahead of schedule.
A total of $10,734,000 worth of contracts was let in 1966 covering such
features as clearing, bulkhead gates, navigation lock gates, sluice gates, cranes, and
elevators.  The project is required to be in operation by April 1, 1969.
Duncan Lake Dam.—The main contract, for slightly under $16,000,000, was
let in 1964 to the Mannix, Standard-General, and Emil Anderson consortium, and
is proceeding ahead of schedule. The contractor's earnings to date total approximately $13,800,000. During 1966 a total of $1,074,000 worth of contracts was
let, covering such features as access-road construction. The project is required
to be in operation April 1, 1968.
Mica Creek Dam.—This dam, towering 800 feet above bedrock, will be the
highest in Canada and third highest of its type in the world. A contract for the
diversion tunnels, which was let in 1965 to the Perini, Northern, Stewart, Morrison-
Knudson, and Mannix consortium for $21,155,000, is proceeding as scheduled,
with the contractor's earnings to date being approximately $12,900,000.
The main contract, covering the dam, spillway, outlet-works, and power intake
channel, is expected to be called in April and awarded in July, 1967. This contract
is estimated to amount to $150,000,000, which would be the largest single contract
awarded in Canada.
In 1966 a total of $22,680,000 worth of contracts was let, covering such features as diversion tunnels, commercial area of Mica Creek townsite, and diversion-
tunnel gates.   The project is required to be in operation by April 1, 1973.
Use of Electronic Computing Equipment
Power studies were conducted during 1966 using the special computer programme developed for use on the I.B.M. 1620. Various problems relating to the
development of the Peace and Columbia River systems are now under intensive
investigation.
During 1967 the Data Processing Division of the Department of Industrial
Development, Trade, and Commerce will be switching over to an I.B.M. 360
system. This will greatly facilitate the use of the data which have been diligently
compiled over the last few years. Signficant improvements are expected in data
retrieval and statistical analyses.
During the past year the Water Licensing Division has prepared a complete
list of files for the Water Resources Service.    This listing includes special codings
 BB 50
WATER RESOURCES SERVICE
to indicate subject-matter and disposition, and the information has been key-punched
on to I.B.M. cards ready for use with the I.B.M. 360. This is one of the last major
tasks of data-recording required to take full advantage of the latest methods of
electronic processing.
Water Licence Statistics
The compilation of water licence statistics is now virtually complete. Details
of new licences and changes of status are being kept up to date, and listings of all
licences issued are prepared from time to time. A revised statistical analysis was
carried out during 1965, and the results are recorded below.
Statistical Analysis of Licensed Water Use as of April, 1965
Domestic purpose _.
Incidental use
 g.p.d.
 g.p.d.
Irrigation purpose __  ac.-ft.
Area irrigated a.c.
Industrial purpose1  g.p.d.
Industrial purpose1 c.f.s.
 c.f.s.
 g.p.d.
Pulp and saw mill
Fish or log ponds _
Land-improvement purpose  g.p.d.
Mining purpose1  c.f.s.
Mining purpose1  g.p.d.
Hydraulic  c.f.s.
 g.p.d.
Processing ore 	
Crown land occupied—
Dam or power plant ac.
Right-of-way  ac.
Flooding ac.
Other purpose  ac.
Power purpose  c.f.s.
Storage purpose ac.-ft.
Miscellaneous purpose g.p.d.
Mineral trading purpose g-P-d.
Waterworks purpose  g-P-d.
Waterworks purpose  c.f.s.
10,197,000
3,157,000
769,100
310,000
179,274,000
1,577
215
4,500
103,000
891
29,000
21
500,000
155
3,343
178,028
29
216,513
89,945,000
116,000
1,160,000
214,262,000
342
t Breakdown into sub-purposes incomplete.
 1
... ...
..■.. :-■■.■"■■:■:■"■: __#   " ■■-.■-.:■.■    ...™-.-:.   :-y.-:,   ...........
Opening the sluice gate, Westbank Irrigation District.
  WATER INVESTIGATIONS
BRANCH
 WATER RESOURCES  SERVICE
WATER INVESTIGATIONS BRANCH
The Water Investigations Branch was formed in late 1962 as a consequence of the
creation of an independent British Columbia Water Resources Service which took effect
on April 1, 1962. The Hydraulic Investigations Division of the Water Rights Branch
was transferred to the Water Investigations Branch, and it formed the nucleus of the
new Branch.
The functions of the Water Investigations Branch, which is headed by the Chief
Engineer, are to deal with technical matters pertaining to the water resources of the
Province, which matters are not directly connected with the administration of the Water
Act. These functions, carried out by various divisions of the Water Investigations Branch,
are briefly summarized below.
(1) Water Supply and Investigations Division:
(a) Irrigation and domestic water-supply investigations to assist and advise the
Department and general public in the development and maintenance of
water-supply projects.
{b) Flooding, drainage, and stream-erosion investigations to give engineering
advice and assistance in solving water-damage problems.
(2) Hydrology Division:
(o) Snow surveys and snow-melt run-off forecasting to guide judicious utilization of water supply.
(_?) Hydrologic studies of the Province to compile and evaluate basic hydro-
meteorological data in such a form as to make them readily adaptable.
(3) Groundwater Division: Collection of existing ground-water data and investigation and evaluation of ground-water potential to encourage and guide the
future use and conservation of this source of water supply.
(4) Basin Planning and Power Division:
(a) Development of plans for water conservation on regional basis with an
immediate aim to indicate possibilities of augmenting the existing water
supply.
(b) Investigation and inventory of undeveloped hydro-electric power potential
of the Province.
(5) ARDA Division: Processing of water-project proposals made under the Agricultural and Rural Development Act and investigation of project proposals.
(6) Projects Division: Preparation and review of proposals and projects under the
Canada-British Columbia Joint Development Act and the Canada Water Conservation Assistance Act. Design and supervision of construction of water-
damage prevention projects.
(7) The above Divisions are supported by a Draughting Office and a Records Compilation and Reports Section.
The above functions are carried out in co-operation with a number of other Governmental agencies with an aim to enable the British Columbia Water Resources Service
to foster better use of water resource, which is one of the principal physical foundations
of the economic development of the Province.
 WATER INVESTIGATIONS BRANCH
BB 55
WATER INVESTIGATIONS BRANCH
V. Raudsepp, P.Eng., Chief Engineer
The Water Investigations Branch, which was created in December, 1962, deals
with technical matters related to the water resources of the Province, where such
matters are not directly connected with the administration of the Water Act. At the
year-end, the staff consisted of 55 permanent and 28 temporary positions, among
which were 31 civil engineers, 3 geological engineers, and 1 hydrometeorologist.
Sixteen permanent and 1 temporary position were vacant.
The principal functions of the Water Investigations Branch are carried out by
six divisions, as follows:—
(1) Water Supply and Investigations Division.
(2) Hydrology Division.
(3) Groundwater Division.
(4) Basin Planning and Power Division.
(5) ARDA Division.
(6) Projects Division.
These divisions are supported by a Draughting Office and a Records Compilation and Reports Section. Both these offices also perform certain services for the
other branches of the British Columbia Water Resources Service.
An account of the work carried out by the Water Investigations Branch is
given in some detail on the following pages. A few general observations are made
below.
Continuing availability of Federal-Provincial financial assistance for the construction of rural water projects under the Agricultural and Rural Development Act
(ARDA) and for other major water-development and water-damage-prevention
projects under the Canada-British Columbia Joint Development Act and the Canada
Water Conservation Assistance Act has resulted, as in previous years, in a large
number of water-project proposals, of which many have been approved and are
ORGANIZATION CHART OF THE WATER INVESTIGATIONS BRANCH
YEAR ENDED DECEMBER,  1966
Chief Engineer
(V. Raudsepp)
Assistant Chief Engineer
(T. A. J. Leach)
Water Supply and
Investigations Division
(R. G. Harris)
(J. H. Doughty-Davies)
(A. R. D. Robertson)
Groundwater
Division
(E. Livingston)
ARDA Division
(D. J. Pennington)
I
(J. D. C. Fuller)
Hydrology
Division
(H. I. Hunter)
Chief Draughtsman
(B. Varcoe)
Basin Planning
and
Power Division
(J. D. Watts)
Projects Division
(B. E. Marr)
Records Compilation
and Reports Section
(A. Z. Stencel)
 BB 56
WATER RESOURCES SERVICE
under various stages of execution. The Water Investigations Branch has been
responsible for the processing of these proposals and for implementing the approved
projects by providing engineering services or by inspection of project execution.
Under the ARDA assistance programme, a total of 38 water projects with an aggregate cost of over $20,000,000 has been authorized for execution to date. Some
23 project proposals with an estimated total cost of $10,000,000 are under investigation. The Canada Water Conservation Assistance Act programme involves three
approved projects with a total cost of $3,400,000. One proposal with an estimated
cost of over $2,000,000 is under active study, and several project proposals are in
preliminary stages of formulation.
Also falling under the Federal-Provincial assistance programme preparatory
work was a Federal-Provincial joint assessment of the Lower Fraser Valley dyke
reconstruction, drainage improvement, and river-bank stabilization problems. This
study involved review of the existing data compiled by the Fraser River Board and
other agencies and supplemented by brief field examinations and office studies. It
was estimated that the total cost of the improvements to the existing reclamation
works and certain additional flood-control measures would be $34,000,000.
Among noteworthy projects was a study of the proposed Shuswap River-
Okanagan Lake water-supply canal, directed by Mr. T. A. J. Leach, Assistant Chief
Engineer. This preliminary comprehensive water-management plan for the Okanagan region was completed and the report released.
In the Water Supply and Investigations Division, under Mr. R. G. Harris, a
number of ARDA water projects and project proposals received attention. Final
designs and construction supervision of individual projects were carried out by
Messrs. D. J. Pennington, T. H. Oxland, J. V. Eby, and W. B. German. Mr. P. W.
Newson and Mr. J. Wester, Hydraulic Engineers, joined the Division. Mr. W. B.
German was transferred from Oliver to Victoria office and was replaced at Oliver
by Mr. S. Mould.
The Hydrology Division, under Mr. H. I. Hunter, continued its main activities
in connection with snow-survey network and spring run-off volume forecasting.
Substantial snow-course network expansion resulted from the requirements of the
Columbia Treaty projects. One "snow pillow," a recording snow-pack measuring
device, was installed. Rearrangement of stream-flow data into more useful form
was continued.   Mr. C. H. Coulson joined the staff as Assistant Hydraulic Engineer.
The work of the Groundwater Division, under Mr. E. Livingston, consisted of
expansion of ground-water data collection activities by exploratory drilling, water-
well inventories, and installation of observation wells. A number of local water-
supply problems also received attention. A ground-water research project in the
Prince George area, under ARDA programme, was continued.
The Basin Planning and Power Division was strengthened by the appointment
of Mr. J. D. Watts to the position of Division Chief. Water-resource inventory
studies on river-basin basis were continued. Also continued were hydro-electric
power assessments of the northern streams, with an emphasis on the Liard River.
The work load in the ARDA Division continued to grow in connection with
the design and construction supervision of certain ARDA water projects and the
processing of claims for reimbursement under the Agricultural and Rural Development Act assistance programme. These supervisory and administrative activities
are in co-operation with the British Columbia Department of Agriculture, which is
generally responsible for the ARDA activities. Mr. W. K. A. Dobson resigned
from the position of Division Chief and was replaced by Mr. D. J. Pennington at
the year-end.   Mr. A. T. McPhail, Hydraulic Engineer, resigned, and Messrs. N. I.
 WATER INVESTIGATIONS BRANCH BB 57
Guild and J. Boardman arrived from England to join the engineering staff of the
Division.
Mr. J. D. C. Fuller, Construction Engineer, continued to be in charge of the
largest ARDA project—Vernon Irrigation District rehabilitation, with a total cost
of $6,600,000. Mr. P. M. Brady continued the design of the new system for the
Southern Okanagan Lands Project. The ARDA Division moved to new offices at
Cook Street in November.
A new Projects Division, under Mr. B. E. Marr, was created to deal with the
proposed and approved projects under the Federal-Provincial financial assistance
programme in connection with the Canada Water Conservation Assistance Act.
Senior members of the Water Investigations Branch have participated in a
number of committees dealing with water-resource matters, such as Hydrology
Sub-committee of the National Research Council, the National and Provincial Committees for the International Hydrologic Decade, several committees in connection
with the ARDA activities, the Interdepartmental Advisory Committee for the Pollution Conference, Co-ordinating Committee for Hydrometeorological Networks,
and two Federal-Provincial joint committees on proposed water projects.
SHUSWAP RIVER-OKANAGAN LAKE WATER-SUPPLY
CANAL STUDY
T. A. J. Leach, P.Eng., Assistant Chief Engineer
The results of this ARDA research project are contained in a recently completed preliminary report.
An examination of the total water requirements, including irrigation, domestic,
waterworks, and industrial purposes within the Okanagan and North Okanagan
areas (Enderby to the International Border), shows that tributary sources are
reaching their ultimate development and that additional requirements will have to
be obtained from Okanagan Lake.
Okanagan Lake will provide sufficient storage in most years to meet present
needs, but with the anticipated population growth and the expected increase in irrigated land, there will be an increasing need for supplementary water for periods of
drought such as occurred in 1929 to 1932.
The most feasible source to supplement Okanagan Lake inflow in years of low
yield would be a water-supply canal from the Shuswap River, at or near Enderby,
which would carry water southward for some 20 miles along the eastern side slopes
of Fortune Creek valley, thence across the river in a siphon which would discharge
into a canal leading to the Deep Creek channel north of Armstrong. In its movement southward through the improved channel of Deep Creek the water would pass
through five drop structures, through a low dam at the outlet of Otter Lake, and a
chute near the canal entrance to Okanagan Lake.
Water for the Enderby-Armstrong (North Okanagan) area would be diverted
every year, but flows south of Otter Lake would be restricted to the natural run-off
of Deep Creek in years of above average inflow to Okanagan Lake. During drought
years, in addition to the North Okanagan requirements, supplementary water would
be diverted from the Shuswap River for discharge into Okanagan Lake.
Diversion facilities on the Shuswap River would include a 2,600-foot by 55-
foot-high dam some 2.5 miles upstream from Enderby, discharging directly into the
canal, or, alternatively, a low diversion concrete dam just upstream from the mouth
of Fortune Creek in combination with a pumping plant which would lift the water
some 30 feet to the canal. Upstream storage would be required on Mabel Lake
under either scheme.
 BB 58
WATER RESOURCES SERVICE
Total capital costs range from $8,700,000 to $14,600,000 for various pumping schemes, while equivalent gravity schemes would cost between $11,200,000 and
$16,300,000. Equivalent annual costs per acre-foot of water range between $9
and $21, with pumping schemes in all instances running somewhat lower than the
equivalent gravity scheme.
WATER SUPPLY AND INVESTIGATIONS DIVISION
R. G. Harris, P.Eng., Chief of Division
The functions of the Water Supply and Investigations Division can be divided
into two main engineering sections—(a) irrigation and domestic water-supply
projects and (b) flood- and erosion-control and drainage projects.
During the past year, investigations were continued or initiated on 15 water-
supply projects and nine flood- and erosion-control projects. Of these, construction
by this Division was carried out on six under the ARDA programme, involving the
preparation of final design, including contract documents.
Technical staff attached to the Division were responsible for field surveys for
both the obtaining of engineering data and the layout of design and the supervision
of construction.
The main projects dealt with in 1966 are summarized below.
Irrigation and Domestic Water-supply Projects
Black Mountain Irrigation District
Following a request from the Trustees, a detailed inventory and replacement
schedule for existing system works was prepared in 1964, together with plans showing layouts of existing and proposed works. The proposed replacements allowed
maximum use from existing system components, but limited pressurization to areas
where topography provided adequate operating pressures. Domestic supply was
not included. In 1965 the district requested that further studies be carried out to
consider the feasibility of a fully pressurized system to provide both irrigation and
domestic supply to farm areas within the district and to be financed under the ARDA
programme.
These studies were completed in August, 1965, and under the proposed new
system 4,548 acres of irrigable land and 530 farm domestic connections would be
served. The existing low-level ditch from Mission Creek would supply a combined
settling-pond and balancing-reservoir constructed at Gopher Flats, which in turn
would supply some 52 miles of distribution pipe-lines.
Following approval for ARDA assistance in October, 1966, preparations for
final design have commenced.
Doukhobor Lands Water Supply
General.—In recent years the subdivided holdings of the former Christian
Community of Universal Brotherhood Limited, in the Grand Forks and Kootenay
areas, have been offered for sale, and many of the lots have now been purchased.
Individual houses are being constructed on these lots, and water for domestic and
irrigation use has become an immediate consideration. Accordingly, in 1962, the
British Columbia Water Resources Service was requested to carry out water-supply
investigations in these areas.
During 1964 and 1965, water-supply investigations were carried out for the
Doukhobor communities in Grand Forks, Raspberry, Brilliant, Ootischenia, and
Champion Creek.    In 1966 these investigations were continued.
 WATER INVESTIGATIONS BRANCH BB 59
Shoreacres Area, near South Slocan.—Feasibility studies were completed for
the Shoreacres community, situated at the junction of the Slocan and Kootenay
Rivers, near South Slocan. Shoreacres, which has a potential of 261 acres of
irrigable land and some 62 households, could be supplied (a) by gravity from
Rover Creek, which necessitates an underwater crossing of the Kootenay River;
(b) by pumping from the Slocan River; or (c) by pumping from drilled wells on
the Shoreacres Terrace. On the basis of water quality and annual operating costs,
the Slocan River was recommended as the source of supply.
Krestova.—The Doukhobor community of Krestova, situated west of the
Slocan River, has recently been subdivided. A preliminary examination of water
supply for this area was initiated in the spring of 1966, and the results of this study
were turned over to the Nelson District office of the Water Rights Branch for further
study.
Kaleden Irrigation District
Incorporated as an improvement district in 1922, the Kaleden Irrigation District comprised some 540 acres of orchard land and about 130 homes. Water
supply for both domestic and irrigation use was being taken from Shatford and
Shingle Creeks through an 11 Vi-mile-long system of ditches, flumes, and natural
watercourses, augmented from storage reservoirs on Brent, Farleigh, Aeneas, and
Marron Lakes.
In 1964, following ARDA approval, a final design of a new system based on
pumping from Skaha Lake was commenced in preparation for a construction programme in 1965.
Work on the distribution-system pipe-lines was substantially completed in
1965, and the year 1966 saw final conclusion of the project with construction of
a 725-horsepower lake-shore pumping plant and associated intake conduit.
The pumping plant is comprised of two 250-horsepower, one 200-horsepower,
and one 25-horsepower vertical turbine units driven by electric motors, and is
capable of delivering 4,000 U.S. gallons per minute against a total head of 565
feet. Automatic operation is achieved by a telemetering control system between
the pump-house and a 40,000-U.S.-gallon tank reservoir above the irrigated area.
The rehabilitated system is capable of delivering 6Vi U.S. gallons per minute
for each acre of irrigated land and is comprised of a closed pipe network buried at
a sufficient depth to maintain frost-free domestic water service during the winter
months.
Final project costs totalled $325,000, of which $210,000 has been contributed
in equal grants by the two senior Governments under the provisions of the Agricultural and Rural Development Act.
Keremeos Irrigation District
A preliminary study was carried out in 1963 to consider several alternative
schemes for rehabilitating the district's irrigation system.
At the present time the district takes water by gravity from the Ashnola River,
8 miles to the west, and from Keremeos Creek, close by. Neither system provides
adequate pressure for sprinkler irrigation, and both systems are in need of extensive
replacements. The investigation concluded that, subject to results of a groundwater testing program, a supply from wells would appear to be the most economical
scheme.
A request for assistance under the ARDA programme was received from the
Keremeos Irrigation District in the latter part of 1965, and a preliminary design
was completed in 1966.   The availability of an adequate ground-water supply has
 BB 60 WATER RESOURCES SERVICE
been confirmed by tests on existing wells in the area. The design provides for a
pressurized closed pipe system with water supply from separate well groups in the
west and east portions of the district. The total flow required from these wells will
be over 8,000 U.S. gallons per minute, demanding a total of 670 horsepower.
The new system is designed to deliver an average of 6% U.S. gallons per
minute per acre to about 1,220 acres of fruit lands, and to provide water for
domestic use to 216 dwellings. The anticipated irrigation charges after allowing
for one-third reimbursement from each of the two senior Governments amounts to
between $20 and $24 per acre.
Naramata Irrigation District
The district receives water by gravity from Lequime (Chute), Robinson, and
Naramata Creeks. Storage has been developed in three reservoirs—Big Meadow
Dam on Lequime Creek, Naramata Lake Dam on Robinson Creek, and Elinor
Lake Dam. The latter two reservoirs are supplemented by diversion from Lequime
Creek. No storage has been developed on Naramata Creek owing to the lack of
a suitable storage site.
In 1958 the major portion of the distribution-works was reconstructed at a
cost of over $250,000. Subsequently, a portion of the High Line (diversion from
Robinson Creek) and north intake were replaced, and chlorination equipment installed. These works were financed by the issue of Government-guaranteed debentures.
During a dry year the district may not have sufficient water supply to serve the
900 acres of orchard land now under irrigation and about 260 domestic connections.
To alleviate this shortage, an ARDA project for raising Naramata Lake Dam approximately 10 feet, for an increase in storage of 300 acre-feet, has been approved.
A final design has been prepared by a firm of consulting engineers, and construction is expected to start in mid-1967, with completion before the 1968 irrigation
season.
The ARDA approval also included replacement of the steel Mason Line serving
108 acres. This project involved laying 7,500 feet of asbestos-cement pipe, varying in diameter from 10 to 4 inches, and was completed during the fall of 1966.
This line provides an important cross-connection within the distribution system to
allow maximum use of freshet flow from Naramata Creek.
Okanagan Falls Irrigation District
The Okanagan Falls Irrigation District obtains its water supply from an intake
on the Okanagan River near the outlet of Skaha Lake. The system, now irrigating
some 135 acres and supplying domestic water to about 150 consumers, was constructed in 1953. Since then there has been an increase in domestic water use as
well as an increase in the use of sprinkler irrigation. A growing problem in the past
has been the occurrence of disagreeable tastes and odour in the water during the
summer months.
A preliminary report was prepared in 1964, which recommended replacement
of portions of the distribution system, construction of a storage tank and booster
station, and improvements to the river intake. In October, 1966, the district requested assistance under the ARDA programme to carry out these improvements,
and a final design is now being prepared. As an alternative to improving the existing water supply, the use of ground-water is being considered. The Groundwater
Division of the British Columbia Water Resources Service completed the drilling
of two test holes in August, 1966, the results of which indicated favourable condi-
 r
WATER INVESTIGATIONS BRANCH
BB 61
tions for the construction of two wells to meet the district's needs for irrigation and
domestic water.
Okanagan-Mission Irrigation District
At the request of the district, an engineering study is currently in progress on
a combined irrigation and domestic water-supply system to replace an existing
irrigation system serving approximately 300 acres of irrigable land. The present
gravity system, with a pumping plant on Okanagan Lake, is no longer adequate to
supply the area.
Osoyoos Irrigation District
In October, 1965, the Osoyoos Irrigation District received approval to construct a new irrigation system under the ARDA programme. The proposed system
was later revised to include the provision of rural domestic water, and received final
approval in August, 1966.   The new system will irrigate 435 acres of orchards.
The district was originally comprised of the adjoining areas of East Osoyoos
and Osoyoos Irrigation Districts. The two districts amalgamated to reduce the
over-all costs of rehabilitation.
Oyama Irrigation District
Construction of a new irrigation and domestic water system for the Oyama
Irrigation District was completed in August, 1966. The project was initiated in
1964 with the preparation of a preliminary report outlining several alternate
schemes and the drilling of ground-water test wells. Approval for ARDA assistance
to construct a ground-water pumping system was received in March, 1965, and
construction was under way by June, 1965.
The completed system now serves approximately 320 acres and 50 homes on
the west side of Wood and Kalamalka Lakes and about 80 acres on the east side
of the causeway between the two lakes. The latter area, now being incorporated
into the district, was not included in the original project and did not receive ARDA
assistance. Also separately financed were pipe-lines and auxiliary pumping equipment to provide the Vernon Fruit Union packing-house with fire protection.
Total costs of the completed project were about $215,000. The main
pumping-station, totalling 200 horsepower, draws water from a 16-inch-diameter
well, 150 feet deep, located near the north shore of Wood Lake. The capacity of
this well is in excess of 2,500 U.S. gallons per minute, reportedly one of the highest producing wells of its type in British Columbia. The water is pumped to a
40,000-gallon reservoir above the pump-house, and the operation of the pumps is
automatically controlled by water levels. The largest pump, of 1,500 U.S. gallons
per minute capacity, is driven by either electric motor or natural-gas engine. The
auxiliary power was needed to meet the fire underwriters' requirements for the
protection of the packing-house. The gas engine operates automatically in the
event of a power failure.
The distribution system involves approximately 5 miles of asbestos-cement
pipe in sizes 4 to 12 inches in diameter. A booster pump near the reservoir increases pressures supplied to the upper laterals. A small submersible pump in a
second well supplies domestic water during winter months.
Peachland Irrigation District
Incorporated as an improvement district in 1920, the Peachland Irrigation
District took over an irrigation system laid out in 1906 by the Peachland Townsite
Company.   To augment existing water supply from Peachland (Deep) Creek, stor-
 ZZM:Z77:^%\
if.      •%
' . i«_ig  «i-:
Construction of 40,000-gallon reservoir, Osoyoos Irrigation District.
A 150-horsepower 1,500 g.p.m. pump and auxiliary natural-gas engine,
Oyama Irrigation District.
 WATER INVESTIGATIONS BRANCH
BB 63
age has been developed in Peachland Reservoirs Nos. 1 and 2 and Wilson Lake.
This storage, coupled with a diversion from MacDonald Creek into Peachland
Creek, has provided an adequate supply of water up to the present time. Approximately 500 acres of fruit lands are presently under irrigation, the balance of about
780 acres being classed as non-agricultural.
In 1965 the district requested an engineering study to consider the feasibility
of a combined irrigation and domestic water-supply system. Field surveys were
carried out in 1966 for the purpose of mapping the district, and storage reservoirs
and preliminary studies have now commenced.
Water-storage Reservoir Inventory
A programme of mapping major water-storage reservoirs in the Southern Interior of the Province was initiated in 1964. This information, which also includes
potential storage, will assist in the administration of water rights and will enable
water-supply augmentation studies to be carried out in water-deficient areas.
Reservoir maps are being prepared by photogrammetry and field surveys.
Echo-sounding equipment is being used to obtain sub-surface information. Of
approximately 115 existing reservoirs in the Okanagan Basin, about 45 reservoirs
remain to be mapped under this programme. Of these, survey data are available
on about 14. Surveys have also been carried out on 14 existing and potential
reservoirs in the Kamloops, Princeton, and Nicola areas. In 1966 a total of 13
reservoirs was surveyed and mapping completed on 11. This programme is to be
continued in 1967.
Westbank Irrigation District
The district receives water by gravity from Powers Creek and Lambly Creek
watersheds, with an intake on Powers Creek, about 6,000 feet upstrea_m from the
district boundary. Present storage capacity has been developed on Islat (Horseshoe), Dobbin, West, Paynter, Jackpine, and Lambly (Bear) Lakes. Total acreage presently being irrigated is about 844 acres, out of a potential of approximately
1,000 acres within the district. Prior to 1964, renewals of the distribution system
were being financed from the district's Renewal Reserve Fund. However, faced
with immediate and costly replacement of the remaining portions of the distribution
and storage works, the district applied for ARDA assistance.
The construction of a concrete intake dam and settling-pond, and screening-
works, and the placing of 7,000 feet of 34-inch-diameter steel pipe-line, representing the first phase of rehabilitation of the district's works under the ARDA programme, was completed in April, 1966, ready for operation for the 1966 irrigation
season.
The next phase of rehabilitation includes the replacement of the remaining
portions of the distribution system and the storage-works. Office studies on this
phase were carried out during the year as field data became available. It is expected
that a construction programme for this work will be undertaken in the fall of 1967.
Winfield and Okanagan Centre Irrigation District
The irrigation and domestic system now operated by the Winfield and Okanagan Centre Irrigation District was constructed in 1909 by a private company.
Although the district was incorporated in 1930, it was not until 1949 that it took
over the distribution system under a purchase agreement. During this interval the
original entitlement of 1 acre-foot of irrigation water per acre from Vernon Creek
proved insufficient for seasonal requirements.    As a result, in 1931 the district
 BB 64
WATER RESOURCES SERVICE
developed 2,445 acre-feet of storage in Crooked Lake, and in 1944 reconstructed
Swalwell Lake to provide 9,585 acre-feet of storage, to supply approximately 1,900
acres of orchard land and about 300 domestic connections.
In 1965 the Water Rights Branch prepared a preliminary report on the rehabilitation of the distribution and storage works, which required extensive replacements. Following approval of the report, the district applied for and was granted
assistance for the project under the ARDA programme with a construction period
of three years.
The first phase of construction, comprising the rehabilitation of Swalwell and
Crooked Lake Dams, and the construction of an access road into the latter dam,
was carried out in the fall of 1966. The work consisted of raising and widening
the embankments, improving the spillway and outlet channels, and extending the
culverts.   This work was carried out by the district, using rented equipment.
Studies are now being carried out in preparation for a final design of a new
distribution system, including intake, sedimentation tank, and main supply-line.
Both final design and construction supervision are being carried out by this Division.
Flooding, Drainage, and Erosion Projects
Cowichan River Flooding and Erosion
During 1965 a field survey of the Lower Cowichan and Koksilah River valleys
was carried out to provide data for use in the design of flood- and erosion-control
works for this area. A limited amount of data was also obtained at the Cowichan
Lake outlet to explore the possibility of alleviating flood conditions in the lower
valley by upstream storage.
These studies were continued during 1966, and a report outlining possible
remedial measures, including cost estimates, is being prepared and is expected to
be completed in early 1967.
Kent Municipal Drainage
In the summer of 1966, as a result of a request from The Corporation of the
District of Kent for a study of drainage problems in certain areas of the municipality, the Water Investigations Branch undertook an examination of the major
drainage facilities, with particular attention to the bottom-lands at Agassiz, Harrison
Hot Springs, and Harrison Mills that are protected by dykes against flooding from
the Fraser River and the Harrison River.
In all cases the floodgates that provide for gravity drainage through the dykes
during most of the year appear large enough to remove the run-off from the 25-year
design winter storms, though repair work is needed on the works at Hammersley
Prairie. In the main slough areas, little improvement can be carried out except to
maintain weed-free channels. However, many of the secondary channels could
benefit from improved vertical alignment and, in some sections, enlarged carrying
capacity. To prevent storm water from flooding the fields for long periods during
the freshet season when high river-levels prevent gravity drainage through the floodgates, additional pumping capacity would be needed at all stations. At Harrison
Mills the required increase in pump capacity would be economically reduced by
constructing intercepting ditches at the foot of Mount Woodside to carry hillside
storm run-off to the Harrison and Fraser Rivers outside the dyked low lands.
Lower Fraser Valley Sea Dykes and Drainage Pumps
In July, 1966, an inspection of the sea dykes in the Lower Mainland was
carried out and estimates of the repairs and recommended improvements were pre-
 WATER INVESTIGATIONS BRANCH
BB 65
pared. Design standards for the dykes were set and based on these; the costs
were computed. The sea dykes were taken to be those dykes either downstream of
the Fraser Street Bridge and Deas Island Tunnel or dykes within the Municipalities
of Delta and Richmond fronting on tidal waters.
In August an inventory was made of the pumping-stations of the dyking and
drainage districts of the Lower Fraser Valley. The study was carried out to determine the costs of any improvements, replacements, or additions to the existing
drainage-works. The inspections were carried out with the co-operation and assistance of the Provincial Dyking Inspector and the Federal Water Resources Branch.
Pump and motor data were collected for each pumping plant, together with
information regarding age, condition, and adequacy of pump-house structures, flood-
boxes, discharges, and main drainage courses. Local representatives of municipalities and drainage districts were contacted to gain additional information.
Nicola-Coldwater Rivers Flooding and Erosion
Following a complaint from the Village of Merritt and previous complaints
from riparian land-owners, an investigation of flooding and erosion in the Nicola
Valley, from Nicola Lake to Spences Bridge, and along the Coldwater River through
Merritt is being undertaken.
Low-level air photography of the valleys and underwater topography of the
outlet of Nicola Lake were obtained in 1965, and preliminary studies were initiated.
Investigations were continued in 1966, and sufficient field information has now
been obtained to complete the studies on the Coldwater River and to prepare a
large-scale topographic map of the area. To allow completion of engineering studies
on the Nicola River, further field information will be obtained in 1967.
Nicomekl and Serpentine Basins Drainage Study
The project area is situated in the District Municipality of Surrey and presently
within the Surrey, Mud Bay, and Colebrook Dyking Districts, some 15 miles from
the City of Vancouver. The low lands drained by the Nicomekl and Serpentine
Rivers represent an area of some 12,000 acres. At the present time, dykes protect
these lands from flooding by rivers and by the sea tides. Internal drainage is by
gravity through floodgates during periods of low tide and when the flood level of
the river has subsided. As heavy fall and winter storms cause flooding in certain
areas, it has been suggested that improved drainage with supplementary irrigation
would allow more extensive agriculture on these lands.
As an ARDA research project, field surveys consisting of river and dyke profiles and sections were carried out in the summer of 1965. Further hydraulic and
hydrometric data were obtained in the winter months. A ground-water drilling
programme has also been carried out and is reported under the Groundwater
Division activities.
This study culminated in the report " Nicomekl-Serpentine Basins Drainage
Improvements." Two methods were suggested to improve the drainage and prevent
flooding from the winter storms, and one scheme was proposed to supply irrigation
water to agricultural lands.
The first of the drainage and flood-protection proposals which appeared more
favourable consisted of (a) bringing the existing dykes up to an improved design
standard and (b) installing 21 pumping-stations to lift the flood waters from the
local drainage over the dykes during a flood, when the water levels in the river
channels are too high to permit drainage by gravity. The second proposal consisted
of a combined dam and pumping-station on each of the rivers near their outlets, with
 BB 66 WATER RESOURCES SERVICE
a dozen auxiliary pumping-stations up-river. The existing dykes were considered
adequate, requiring only minor improvements. The irrigation scheme would supply
water to the farms in conjunction with either of the two drainage proposals.
While estimated costs were shown, it was recommended that these costs be
reviewed in the event that the irrigation-water requirements were affected by
improved drainage.
Okanagan Flood-control Works
In 1963 an investigation was commenced to determine the existing condition
of the Okanagan flood-control channel and structures which were constructed in
1952-58 jointly by Federal and Provincial Governments. These studies were completed in April, 1965.
Several modifications and improvements in the flood-control works were considered necessary. Extensive bank and channel-bottom protection was required to
stabilize the channel at high or design maximum flows. Modification or lowering
of the water-supply intake culverts was necessary in order to supply irrigation water
to the lands adjacent to the river channel when water flows are below 500 cubic feet
per second. Some dredging of the channel and entrance to Osoyoos Lake was also
recommended. Replacing portions of the boundary fencing and gates and minor
repairs to some of the vertical drop structures were also considered desirable.
As the first cost estimates were prepared in 1964, it was thought desirable to
up-date the costs due to the increase in construction costs. In addition, some of
the recommended improvements have already been carried out under the annual
maintenance programme. It is expected that the revised costing will be completed
early in 1967.
Pemberton Valley Dyking District
A request was received from the district for assistance under the ARDA programme for improvement of drainage and flood protection in Area 2, which lies
between Green River and Miller Creek. Further improvements to this area would
allow improved drainage and agricultural production and reclamation of farm lands,
involving about 2,000 acres. Field surveys were carried out in 1965 and 1966,
and a large-scale topographic map is being prepared. An engineering report with
recommendations and cost estimates will be completed in early 1967.
Salmon River Valley Flood Control
Preparations are being made to carry out preliminary flood-and erosion-control
and water-supply studies covering the Salmon River valley between Salmon Arm
and Westwold. As there were no large-scale maps available, a mapping programme
was undertaken in the summer of 1966, consisting of low-level air photography and
photogrammetry control. Of the 50 miles controlled, approximately 23 miles are
to be mapped at this time for the ground-water studies.
Tsolum River Study
In November, 1966, a request for a study of the feasibility of flood and erosion
control and irrigation water supply was received from land-owners living along the
Tsolum River north of Courtenay.
Progress to date consists of gathering hydrometric data, soils classification, and
up-to-date air photography.   Office computation using this data is progressing.
Briefly, the study involves some 3,000 acres of agricultural land on both banks
of the river for 10 miles upstream from the river mouth at Courtenay.
 WATER INVESTIGATIONS BRANCH BB 67
HYDROLOGY DIVISION
H. I. Hunter, Meteorologist, Chief of Division
Snow-course Network
The British Columbia snow-course network, established in 1935, continued
to expand in 1966, with 17 new courses established on the Province's watersheds.
This makes a total of 169 that will be in active operation in the 1967 snow-sampling
season. Of this total, approximately two-thirds will be measured by personnel of
co-operating agencies, with the remaining third by part-time employees of the
Water Investigations Branch.
The major addition was the installation of seven high-level courses in the
heavy water-producing regions of the Columbia basin, with future measurements
from these courses destined for use in the operation of the Columbia River Treaty
projects. These courses will be sampled by helicopter. Other additions include
two on the McGregor and one on the Parsnip basins for the Peace River project;
one each on the Bridge River, Stave, and Wahleach Lake watersheds; two on the
Okanagan Lake watershed for an International Hydrologic Decade project; one
on the Penticton Creek basin and one near Smithers. All were installed at the
request of co-operating agencies for the purpose of forecasting volumetric snow-
melt water supply. The only deletions were two Penticton Creek watershed snow
courses which will be flooded by the reservoir of the Penticton Creek new dam.
Last winter, 20 snow courses were visited to provide snow surveyors with at-
site snow-sampling instruction and, as part of the routine summer maintenance
work, 29 existing courses were cleared and brushed.
At British Columbia Hydro and Power Authority's request, ground and air
reconnaissances were made on Kootenay River drainage to investigate potential
snow-course sites for proposed installation in the summer of 1967.
In order to evaluate the promising and newly developed pressure-pillow snow
gauge for measurement of snow-water equivalent, a test site was established at the
6,300-foot level on Blackwall Mountain in Manning Park. In addition to the
monthly recording pillow, a monthly recording precipitation storage gauge and
hygrothermograph were also installed. The latter two instruments, together with
the existing snow course, will be used to evaluate the pillow's performance.
Water-supply Forecasting
Seasonal snow-melt run-off volume forecasts are made for 31 gauging-stations
on 19 rivers. This is a continuing programme, with the electronic computer used
to up-date and improve existing forecast procedures and, as the required basic data
becomes available, develop new forecast procedures for additional watersheds.
The installation of new data-processing equipment by the Department of Industrial
Development, Trade, and Commerce has resulted in the revamping of programmes
to suit this equipment.
During the freshet period, daily stream-flow data are received for key gauging-
stations from the Water Resources Branch of the Federal Department of Energy,
Mines, and Resources. Hydrographs and associated meteorological data are plotted
and short-term assessment made of the expected stream-flow.
In British Columbia, snow surveys are undertaken annually near February 1st,
March 1st, April 1st, May 1st, May 15th, and June 1st. They show build-up,
maximum accumulation, and depletion of the Province's mountain snow. All
results are funnelled by telegraph, teletype, and telephone to Victoria, where the
 ■' ■■'■'. ■■ .
^■'■'.■•'■Ix-:'. .
Instrument test site, Manning Park (elevation, 6,350 feet).    Self-recording precipitation
storage gauge and over-snow Skidoo.
 WATER INVESTIGATIONS BRANCH
BB 69
data are assembled and quantitative forecasts of run-off prepared. As a public
service, the observations and forecasts are incorporated in the publication " British
Columbia Snow Bulletin " and distributed to interested people and agencies immediately following each of the above six sampling dates.
Hydrometeorological Data Compilation
The rearrangement of past data on stream stages and discharges by gauging-
stations is now complete and being used by engineers to facilitate their work. As
new measurements become available, the stream-flow record library is up-dated.
Under a cost-sharing agreement with the Federal Water Resources Branch,
an assessment is made each year with respect to existing and proposed hydrometric
stations. For the calendar year 1966, 10 all-year stations were established, 9 reestablished, and 10 discontinued. Partial year or irrigation station measurements
were completed on 109 streams by the Federal Water Resources Branch.
At the conclusion of each snow-sampling season, a quality check is made of
snow-survey measurements, and these are incorporated with past data then processed and listed by I.B.M. equipment. Statistics derived from this data are updated annually. Preliminary snow-survey measurements were published in the
1966 snow bulletins. Early in the year, copies of the publication "A Summary of
Snow Survey Measurements, 1935-65," were mailed to interested agencies and
individuals.
Hydrologic Study Basins
In co-operation with the Groundwater Division, instrumentation was installed
this past summer on the International Hydrologic Decade representative basin near
Carrs Landing on the Okanagan Lake watershed. Dependent on the season, daily,
weekly, or monthly observations of temperature, precipitation, wind, humidity,
evaporation, soil moisture, ground-water, phenological, and snow-course measurements are now being collected.
Data from this 4-square-mile basin will be used to study the hydrologic cycle
and to provide indices for forecasting inflow to Okanagan Lake.
Minor Hydrologic Studies
In co-operation with the Water Resources Service engineers and outside
agencies, minor studies were completed relative to water-supply problems and
hydrometeorological network expansion.
1966 Snow-melt Run-off
Spring and summer basin run-off was below average on the Kettle, Okanagan,
and Similkameen, close to average on the Kootenay, Columbia, and Fraser, and
above average on the Lower Mainland, Coast, and Vancouver Island watersheds.
GROUNDWATER DIVISION
E. Livingston, P.Eng., Chief of Division
Water-well Inventory
The collection of data on existing water wells and ground-water use continues.
Water-well maps in the Okanagan Valley were brought up to date by locating a
number of wells for which records were already on hand.   In addition, a water-well
 Lowering 10-inch screen into a test well in Lower Fraser Valley.
 WATER INVESTIGATIONS BRANCH
BB 71
inventory was carried out in the Rocky Mountain Trench from the United States
Boundary to Golden. Maple Ridge and Mission Municipalities on the north side
of the Fraser River were also covered by a well inventory to bring well maps of
that area up to date.
Observation Wells
Three observation wells equipped with screens and 6-inch casing were constructed in North Saanich near the Village of Sidney. Two of these are equipped
with float-type monthly water-level recorders. The third is being measured manually but can be equipped with a recorder at a later date.
An observation well was constructed in a small aquifier across the Columbia
River from Castlegar east of the Castlegar Airport. Two new observation wells
were installed as part of the basin study project near Okanagan Lake, discussed
below.
A number of observation wells in the Lower Fraser Valley network have been
in operation for four years or more. In several cases the wells show only small
fluctuations in level over a year, with manual observations taken approximately
at monthly intervals. In some cases these small fluctuations do not show the yearly
cycle, which is usually expected. In these cases, present plans call for installation
of water-level recorders for periods of at least three months to determine the short-
term pattern of the fluctuation. Float-type recorders were put on two of these wells
and later removed.
Most of the observation wells have small-diameter plastic casings in which
standard float-type water-level recorders cannot be used. For this type of well, a
special type of recorder was purchased; it is installed on a well south of Aldergrove.
Another recorder for small-diameter wells using compressed air has been designed
by the staff of the Groundwater Division. It is installed on a well near Langley
and is working very well, but will probably be modified in the future. Work on
this project will be continued.
In addition, bubble tube equipment has also been developed for use during
pumping-tests on deep wells where the usual electric measuring-lines have often
been unsatisfactory.
Electrical equipment suitable for measuring temperatures of water in wells up
to 800 feet deep has been obtained. The temperatures in observation wells in the
Lower Fraser Valley are being measured periodically. A much simpler device
using a mercury thermometer for measuring well temperatures has also been designed and built.   It works fairly well but needs further modification.
The observation-well network at the year-end consisted of the following:—
Lower Fraser Valley
North Okanagan	
Kelowna area	
Kamloops area 	
Prince George area ___
Kootenay area	
Southern Vancouver Island
18
19
15
4
3
1
3
Total
63
Two wells were abandoned in the Lower Fraser Valley, and one well was
abandoned in the Prince George area.
 BB 72 WATER RESOURCES SERVICE
Hydrologic Basin Study near Okanagan Lake
Work on this project continues in co-operation with the Hydrology Division.
Two new observation wells were installed, for a total of five in the basin. Meteoro-
logic and soil-moisture instrumentation was also added; this is described more
completely in the report of the Hydrology Division.
Ground-water Test Drilling
Several test water wells and a number of rotary test-holes were drilled under
contracts during the year, as indicated below.
Lower Fraser Valley Deep Drilling
The programme of test-hole drilling to investigate the possibility of using
ground-water for irrigation in a proposed drainage and irrigation project in the
Lower Fraser Valley was continued from the previous year. The serious drilling
problems were overcome by changing the drilling technique. Five holes were
drilled, for a total of 4,210 feet. The results generally were not very encouraging,
except for a sandy aquifer between 230 and 260 feet found in the Serpentine Valley
north of Cloverdale. A test-well was constructed north of Fry's Corner in this
aquifer. Because of severe well-construction problems, testing of the well had not
been completed at the year-end.
North Okanagan Deep Drilling
A programme of four deep rotary test-holes was planned in the Armstrong
area. One hole was drilled to 1,220 feet about 2 miles south of Armstrong. The
contract was then terminated because of difficulties in drilling, at the request of
the contractor.   The results were encouraging.
Rotary Test-hole Drilling in Okanagan Valley
Two rotary test-holes were drilled at Okanagan Falls to locate, if possible, an
aquifer suitable for supplying domestic and irrigation water in that area. Both
holes were terminated when they encountered very loose permeable gravels. Conditions probably are favourable for wells.
Three shallow rotary test-holes were drilled on terraces between 1,600 and
1,750 feet on the east side of Wood Lake to check the feasibility of using groundwater for winter domestic supply in that area. One deeper hole, 167 feet deep,
was drilled in glacial materials at a higher elevation east of the south end of Wood
Lake. The shallow holes indicate that only a limited amount of ground-water is
available on the terraces.   Results from the deeper hole are encouraging.
Three rotary test-holes were drilled on the bench south-east of Kelowna at
about 1,700 feet. One hole was not completed because of drilling difficulties. One
of the other holes was very encouraging; the third had limited success.
Five rotary test-holes were drilled for geologic and ground-water information
in the Camp Lister area south of Creston.    Drilling was slow because of many
very hard boulders.    Two of the holes discovered aquifers, probably of limited
capacity.
Village of Sointula, Malcolm Island
A test-well was drilled at Sointula to follow up a geologic investigation which
indicated the presence of an aquifer below sea-level in this area. The well was
drilled 246 feet deep with a screen set from 161 to 174. It was test-pumped,
indicating a capacity of about 90 imperial gallons per minute.
 WATER INVESTIGATIONS BRANCH BB 73
Ground-water Research Project at Prince George under
ARDA Project No. 10014
Under supervision of the Groundwater Division, work continued on this
project. A small amount of additional geologic mapping was done. At the Department of Biology and Botany, University of British Columbia, a graduate student
has been studying fossil pollen and spores from samples collected on surface and
in drill-holes in an effort to clear up difficult stratigraphic problems which stand in
the way of understanding the geology of Tertiary and Pleistocene deposits, which
are the aquifers of this area. At the year-end, four test-wells, for a total of 1,438
feet, had been drilled using cable-tool equipment. Pump tests were carried out
at the year-end; results of pumping tests were being compiled. Work started on
a new contract for test-wells, and one well had partially been completed by the
year-end.   This project should be completed by mid-year of 1967.
Miscellaneous Investigations
In addition to the above, the following projects were also carried out: —
A brief investigation was conducted at Snowden Forest Camp, Corrections
Branch of the Attorney-General's Department, in connection with a well for water
supply. A well was drilled on our advice, but it was not entirely satisfactory
because of well-construction problems.
Information on ground-water at the Masset Indian Reserve was furnished to
the Department of Indian Affairs at its request.
Early in the year a group of residents at Rayleigh, north of Kamloops, who
were interested in forming an improvement district, asked for advice in locating a
well for supplying a domestic system. A well was drilled at this location by a
contractor, who reported a dry hole. Under guidance from the Groundwater
Division, four rotary test-holes were drilled in the area. These indicated that the
original location was better than any of the others tested, so another contractor
reconstructed the original test well, which then produced 60 U.S. gallons per minute
during a 24-hour pump test.
At the request of the Parks Branch, Department of Recreation and Conservation, a brief investigation was carried out at the site of a proposed well at the
administrative headquarters of Wells Gray Park. Advice on testing and well construction was also supplied to the Parks Branch in connection with a well to supply
water for three picnic-sites on Okanagan Lake south of Summerland.
A brief investigation was carried out at the request of the Department of Public
Works in connection with a problem of water supply for an existing fish hatchery
in Matsqui Municipality near Abbotsford.
A well at Grandview Flats near Armstrong, which was completed in 1965 and
turned over to Grandview Flats Improvement District for supplementary water
supply, was test-pumped, using the improvement district's pumping equipment.
The results agreed generally with results from an inadequate pump test carried out
at the time of drilling.
Dam-sites on Lambly Lake were investigated briefly in connection with a proposal to raise the lake-level.
Great progress has been made in adapting the rotary drilling technique to the
needs of the Groundwater Division. By use of an improved drilling fluid for
shallow or deep holes, the quality of samples has been much improved and the
need for drive samples has virtually been eliminated.
 BB 74 WATER RESOURCES SERVICE
BASIN PLANNING AND POWER DIVISION
J. D. Watts, P.Eng., Chief of Division
This Division of the Water Investigations Branch has two main functions: (1)
development of plans for water management on a regional or watershed basis, with
an immediate aim to indicate the feasibility of improving the dependability of
surface-water supplies in areas where readily available water supplies have been
exhausted, and (2) continuation of inventory of undeveloped water-power potential
of the Province.
The following work has been done during the current year.
Water-supply Studies v
Similkameen Basin
The results of detailed study and interpretation of all available hydrometeorological data for the 3,000 square miles of river basin were compiled in March of
this year. Maps included show isohyets for mean annual precipitation and mean
annual run-off for secondary watersheds. Hydrographs for all available stream-
gauging stations were prepared, and estimates of the frequency of occurrence of
annual flows of any possible magnitude were made.
Nicola Basin
A study of the hydrology of the 2,500-square-mile area around Merritt was
commenced during the year, but later put into abeyance due to the shortage of staff
and work of greater urgency.
Creston Area
Begun in response to a brief submitted by the Creston Valley Rural Development Committee, this study considered the present and future water needs of a
90-square-mile urban and agricultural area around the Town of Creston. All
available information on climate, soils, and irrigation requirements was collected,
analysed, and up-dated where possible. An appraisal was made of all water
sources which could be of value, special note being made of the areas which could
best be served by each source. The value of Duck Creek as a not yet fully exploited source is stressed.
Miscellaneous
As part of a study of wider scope, a preliminary investigation was made of
the pattern of mixing of the Columbia and Kootenay Rivers below their point of
confluence at Castlegar. A brief float study was carried out, which provided basic
data necessary to the success of any detailed future work.
In February, pumping-tests were carried out to determine the capacity of the
water-supply medium serving the Village of Oliver. Information on drawdown
behaviour was analyzed and recommendations made for improvement of supply.
In March, a preliminary appraisal was made of the value of Bulman Creek
as a site for the development of irrigation storage to serve the Glenmore Irrigation
District, near Kelowna. Conclusions indicate that storage could be economically
feasible and that more detailed study is justified.
Hydro-power Investigations
Stikine River
Ground-control survey and air photography of the Upper Stikine Valley above
McBride River, the Lower Stikine Valley below Scud River, and the lower reaches
 WATER INVESTIGATIONS BRANCH BB 75
of the Chutine and Scud Rivers were carried out by personnel of the Surveys and
Mapping Branch, Lands Service, to further extend existing large-scale mapping
to cover potential dam-sites and reservoir areas. Production of the maps is proceeding.
Iskut River
Further ground-control survey of the Lower Iskut Valley was carried out by
personnel of Surveys and Mapping Branch, Lands Service. Production of the maps
is proceeding.
A permanent hydrometric station was installed by the Federal Water Resources
Branch as close as practicable downstream of the major potential power-site, near
Forrest Kerr Creek, to improve the reliability of hydrologic studies for this project.
Liard River
Using a float-equipped aircraft and a helicopter, a field inspection of possible
dam-sites was made during the summer by engineers of the Service, accompanied
by a geologist representing International Power and Engineering Consultants
Limited. Fourteen possible dam-sites on the main stem of the Liard River had
been previously selected from earlier reconnaissance reports, augmented by studies
of more recent air photography and large-scale mapping. The purpose of the inspection was to select the most promising sites for the integrated hydro-electric
development of the Liard River within British Columbia and to recommend future
priorities in investigation.
The possible dam-sites fall generally into two groups: those located downstream from the head of the Grand Canyon on the Liard, and those located upstream from the canyon. The construction of a major dam at any of the downstream group of sites would flood out all other dam-sites in this group located farther
upstream. Investigation of the downstream group was concentrated principally on
the three lower sites, being Sites A, H, and I. Site A, the farthest downstream site
in the group, is located some 30 miles upstream from the mouth of the Fort Nelson
River, in a section where the river breaches a prominent escarpment formed of sandstone and conglomerate beds of the Fort Nelson formation. A major dam at this
location would provide the maximum possible concentration of hydraulic head,
combined with the greatest volume of active storage for effective regulation of the
river-flow. While surface examination of this site did not reveal any feature which
would render its development impracticable, it was apparent that a substantial depth
of fill could be present in the river-bed and that the strength of the weaker shales
underlying the site could be of major importance. These factors can only be determined by a sub-surface drilling programme. Tender forms have been issued for
this work, and it is anticipated that drilling at the site is expected to commence in
January, 1967.
The examination of Sites H and I did not reveal any compelling reason to
prefer either site over Site A. Consequently, further investigation of these sites
should not proceed until the feasibility of constructing a major dam at Site A has
been ascertained.
Site G, located about 12 miles upstream from the mouth of the Kechika River,
appeared to be the best of the sites examined upstream from the Grand Canyon
It would seem suitable for a structure of about 400 feet in height, provided that a
possible seepage path along the Leguil Creek valley does not prove to be a major
problem. A dam at this location would appear likely to form a part of any integrated hydro-electric development and would eliminate all other possible dam-sites
farther upstream in British Columbia.    Initial exploration at this site would be
 BB 76 WATER RESOURCES SERVICE
concentrated on ascertaining the depth of unconsolidated material in the river
channel and the elevation of bedrock in the Leguil Creek valley.
On the return flight from the Liard River to Fort Nelson, an aerial reconnaissance of the Kechika and Gataga River valleys was made to obtain a preliminary
assessment of potential storage possibilities.
Ground-control survey and air photography of the lower Liard River valley,
the Fort Nelson River valley, and the upper Kechika River valley were carried out
by personnel of the Surveys and Mapping Branch, Lands Service, to extend the
existing large-scale mapping to cover potential dam-sites and reservoir areas.
Office studies of Liard River basin hydrology and power potential are continuing.
Cottonwood River near Cassiar
Subsequent evaluation of the hydro-power potential of the Cottonwood River
near Cassiar, in the light of three years of record, substantiates the tentative estimate
of last year.
About two-thirds of this potential exists at Dam-site 1, having a firm power of
3,200 to 3,600 kilowatts, on the Cottonwood River, some 18 miles south-west of
Cassiar, where a 300- to 310-foot head could be developed. The remaining one-
third would be through regulation at Site 3 or 3a, some 8 miles downstream from
Site 1, where there is the potential for 150-foot head with a firm power of 1,800
to 2,000 kilowatts.
ARDA DIVISION
W. K. A. Dobson, P.Eng., Chief of Division
J. D. C. Fuller, P.Eng., Construction Engineer
This Division was formed in 1963 for the purpose of investigating and preparing water-project submissions under the Federal-Provincial Agricultural and Rural
Development Act (ARDA) assistance programme, and for the supervision of the
construction of certain approved water projects. The over-all administration of
the ARDA programme is under the jurisdiction of the British Columbia Department
of Agriculture. An interdepartmental co-operative arrangement has charged the
British Columbia Water Resources Service with responsibility for ARDA water-
projects implementation.
Under the ARDA assistance programme, the Federal Government and the
Provincial Government finance two-thirds of the approved or actual cost of water
projects, whichever is less.
The number of requests for assistance under the ARDA programme has increased steadily since the programme was initiated, and many of these projects have
been approved both Federally and Provincially, and many of these approved projects
have been successfully completed and others are under various stages of construction. Because of unforeseen rises in construction costs, particularly where done by
contract, it has been necessary to request supplementary assistance to complete
some of these projects.
Since the start of the ARDA programme in British Columbia in 1963, about
$3,600,000 in round figures has been expended on the various projects and a total
of over $20,000,000 has been authorized for expenditure to date. In 1963 no
requests for reimbursement were received; in 1964 the total expenditures on ARDA
projects was $260,000; in 1965 this rose to $1,000,000; and in 1966 will be over
$2,000,000. This final figure is approaching the maximum figure set by the Federal-
Provincial ARDA agreement for soil- and water-conservation projects of $2,595,168
in any one year.
 WATER INVESTIGATIONS BRANCH BB 77
Of the 62 water projects which are considered as actual or potential projects
under the ARDA programme, 49 have requested assistance. Of those which have
not submitted a request, seven are at present under study in order to arrive at a
proposal for submission.   Six are in abeyance for various reasons.
Of the 49 requests for assistance, 37 have been approved by the Provincial
and Federal ARDA authorities. The 12 which have not been approved are either
under study as to feasibility or to arrive at a preliminary cost that can be used as
a basis for a submission to ARDA authorities.
Of the 37 projects which have received Provincial and Federal approval, 31
are either under construction or are completed. The other six are under final
design studies prior to construction.
Of the 31 projects under construction, 18 are completed as far as construction
is concerned. The 13 incompleted projects are multi-year projects which may not
be completed until 1970.
Of the 18 completed projects, some have not yet submitted their final claims
for reimbursement as they have such items as contractors' holdbacks or surveying
still to be completed.
To outline each of these 62 projects even in the broadest terms would be a
very voluminous undertaking. Six of these projects were outlined in the 1964
Annual Report and 24 were outlined in the 1965 Annual Report of the British
Columbia Water Resources Service. Only those which have had significant changes
will be referred to again this year. Engineering services for these projects have been
provided by the Water Investigations Branch and also by the Water Rights Branch
and the consulting engineers.
(1) Keremeos Irrigation District Rehabilitation.—It is proposed to replace
the present open gravity system drawing from the Ashnola River and
Keremeos Creek by pumping from a series of wells into an enclosed system
providing irrigation and farm domestic water supply.
(2) Black Mountain Irrigation District Rehabilitation—ARDA Project No.
29018.—This project will replace the present open gravity system by an
enclosed one that will provide sprinkler pressure to the lands which it
serves and also rural domestic water supply.
(3) Winfield and Okanagan Centre Irrigation District Rehabilitation—ARDA
Project No. 29017.—This project will replace the present expended enclosed system with a new system designed for modern sprinkler irrigation
methods and for farm domestic supply and will also include repairs to the
district's main storage dams.
(4) Glenmore Irrigation District Rehabilitation—ARDA Project No. 29020.
—This project will replace the present open gravity system by an enclosed system which will take advantage of available head, augmented
by pumps, to supply the district with adequate pressure for modern
sprinkler methods.
(5) B.C. Fruitlands Irrigation District Rehabilitation.—This project, with an
estimated cost of $216,000, will provide a portion of the district's irrigated lands with water under pressure suitable for sprinkler irrigation.
(6) Raspberry Irrigation District Rehabilitation—ARDA Project No. 29021.
■—-This project will supply the district with a rural domestic supply and
irrigation to the district's farm lands.
(7) South-east Kelowna Irrigation District, Project No. 2—ARDA Project
No. 29003.—This project involves the rehabilitation of part of the distribution-works of the district, replacing expended works with more permanent materials suitable for pressure irrigation.
 BB 78 WATER RESOURCES SERVICE
(8) Surrey Drainage Project at Halls Prairie Road—ARDA Project No.
29019.—This project will provide drainage and flood protection to some
500 acres in the Surrey Dyking District, within the District Municipality
of Surrey.
Below is included some detail on ARDA water projects that were either completed during the current year or are continuing projects:—
(9) Canyon Waterworks District Rehabilitation — ARDA Projects Nos.
10022 and 29014.—This project was completed during the year and has
proved very satisfactory to the farmers who formerly were very restricted
in their water supply each year. Unforeseen rock excavation caused this
project to exceed its estimated cost by about $1,200.
(10) Vernon Irrigation District Research Study—ARDA Project No. 10015.—
This study was completed early in the year.
(11) Boundary Line Irrigation District Rehabilitation—ARDA Projects Nos.
10035 and 29024.—The original project to supply irrigation water was
started and completed during the year. The work was done by the district's own forces and completed within the estimated cost. This district's
request for rural domestic water to be included in its system has been
approved.
(12) South-east Kelowna Irrigation District, Project No. 1—ARDA Project No.
10021.—This project, started in 1965, was completed in 1966 by the
district, using its own forces, and was completed within the estimated
cost.   This is part of the district's over-all plan of pressurizing its system.
(13) Meadow Valley Irrigation District Storage Rehabilitation—ARDA Projects Nos. 10025 and 29023.—This project, involving a dam reconstruction and diversion-works, was completed too late to be used this year. It
exceeded its estimated cost by about $5,220, which has been subsequently
approved.
(14) Kaleden Irrigation District Rehabilitation—ARDA Projects Nos. 10013
and 29015.—This project was completed in time for the 1966 water season, but exceeded its original estimated cost by some $30,000 owing to
increased contract prices.
(15) Nicomekl-Serpentine Rivers Research Project — ARDA Project No.
10032.—This research project was completed in 1966.
(16) Westbank Irrigation District, Project No. 1—ARDA Project No. 10033.
—This project, involving the construction of a concrete diversion weir
and the laying of some 7,000 feet of main steel pipe, was carried out by
the district, using its own men, and was completed within the estimated
cost.
(17) Oyama Irrigation District Rehabilitation—ARDA Projects Nos. 10028
and 29001.—This project was completed during the year and supplies
rural domestic as well as irrigation water. It was amended to include an
extended area and thus required an additional amount of money to complete. The final cost of this system exceeded the amended amount by
about $6,500.
(18) Okanagan-Shuswap Canal Research Project—ARDA Project No. 10031.
This study was completed in 1966.
(19) Grandview Waterworks District Rehabilitation — ARDA Projects Nos.
29013 and 29013s.—This project was carried out in 1966 and, to paraphrase the words of the district's secretary, " the improvement in their
water supply is far beyond anything that they had expected." This project
was also amended to include additional farm dwellings.
 WATER INVESTIGATIONS BRANCH
BB 79
(20) Naramata Irrigation District Partial Rehabilitation—ARDA Projects Nos.
10034 and 29016.—Under this project the final portion of the district's
distribution-works has been renewed, and studies are being carried out
on the renewal of its Naramata Lake Dam.
(21) Prince George Ground-water Research Programme—ARDA Project No.
10014.—Studies on this programme were continued during the year.
(22) Southern Okanagan Lands Irrigation District—ARDA Project No.
10010.—This was the first of the multiple-year projects to get under way.
The first stage, Pumping System No. 5, was completed in time for the
1965 irrigation season and has proved most satisfactory.
The second stage, Pumping System No. 9, got away to a belated
start for the 1966 water season due to unexpected factors, such as poor
pump-house foundation conditions necessitating major last-minute
changes, and then a broken motor shaft on the 200-horsepower pump
that delayed full delivery.   This unit is still requiring final adjustments.
The third stage, Pumping Systems Nos. 7 and 8 and farm domestic
supply to Areas 8 and 9, is well on its way to completion.
(23) Summerland Municipal Irrigation Rehabilitation—ARDA Project No.
10029.—This is a continuing programme which has already replaced three
storage dams and several miles of distribution-works. It is being carried
out by municipal forces.
(24) Penticton City Irrigation Rehabilitation—ARDA Project No. 10024.—
This continuing programme has renewed two distribution systems and the
Ellis Creek intake and is continuing work on the Penticton Creek storage,
intake, and diversion tunnel. This project has been done entirely under
contract and has greatly exceeded the estimated costs. Engineering services have been provided by the Prairie Farm Rehabilitation Administration, Canada Department of Agriculture.
(25) Delta Municipality Drainage Project—ARDA Project No. 29002.—This
project is being carried out by municipal forces as the contract bids were
considered to be too high.   The project is about 50 per cent complete.
(26) Winfield and Okanagan Centre Irrigation District Rehabilitation—ARDA
Project No. 29017.—This project got off to a late start in 1966 but managed to get the major part of the work on its storage dams completed
before winter conditions arrived.
(27) Black Sage Irrigation District Rehabilitation—ARDA Projects Nos.
29009 and 29009s.—The distribution system of this district was replaced
prior to the 1966 irrigation season by the district's own forces. The
pumps and pump-house still remain to be completed.
(28) Scotty Creek Irrigation District Rehabilitation — ARDA Project No.
29011.—This district, using its own forces, completed the renewal of its
distribution system prior to the 1966 irrigation season and has still to
complete work on its intake structure.
(29) Naramata Irrigation District Storage-dams Rehabilitation—ARDA Project No. 29022.—This project was an emergency job, and the initial part,
the renewal of the outlet structure on Big Meadow Dam, has been completed. The repairs to Elinor Dam are still to be completed. This work
was carried out by the district's personnel.
(30) Vernon Irrigation District System Rehabilitation—ARDA Project No.
29004.—This is the largest ARDA project being carried out in British
Columbia.   The district has commenced its reconstruction programme by
 BB 80 WATER RESOURCES SERVICE
renewing the distribution-works, which will be supplied from Goose Lake;
about 75 per cent of this work is completed. Work is also being carried
out on the reconstruction of Goose Lake Dam and the new outlet-works
from this lake.
(31) Osoyoos Irrigation District Rehabilitation—ARDA Project No. 29012.—
This project has suffered some delay as it was decided to combine the
Osoyoos and East Osoyoos Districts into one system. Work is nearly
completed on the distribution system, and preparations for the pump-
house have been carried out; the pump-house contract has been awarded.
PROJECTS DIVISION
B. E. Marr, P.Eng., Project Engineer
The Projects Division has as its main function the investigation, preparation,
and review of reports for submission under the Canada-British Columbia Joint Development Act and the Canada Water Conservation Assistance Act, and arranging
for the construction of approved projects. These refer to water-development and
water-damage-prevention projects of a major character.
In addition, design and construction supervision of other minor water-damage-
prevention projects has been carried out.
North and West Vancouver Flood-control Project
The first agreement involving British Columbia under the Canada Water Conservation Assistance Act was made on February 1, 1966, and provides for the
construction of channel improvements on streams in North and West Vancouver for
flood- and erosion-control purposes. The total cost of the works is estimated at
$2,301,480, with costs up to this amount being shared by Canada (37Vi per cent),
the Province of British Columbia (37V2 per cent), and the local authorities (25 per
cent). The Province entered into an agreement on March 2, 1966, with the Greater
Vancouver Sewerage and Drainage District, agent for the District of West Vancouver
and The Corporation of the District of North Vancouver, to carry out the projects.
During 1966 two construction contracts were let:—
(1) Capilano River bank protection, involving the construction of some 1,547
feet of protective work on the east bank of the Capilano River, including
the raising of the existing bank and the placing of approximately 16,000
tons of stone riprap, at a contract price of $126,680. This work, completed in October, 1966, provides flood protection to developments in the
area and increased utilization of land.
(2) Mosquito Creek improvements involve construction of a reinforced-
concrete box culvert, an earth dam and debris basin, and a reinforced-
concrete outlet structure to contain Mosquito Creek and prevent serious
flooding and erosion along both banks of the creek over a length of some
2,650 feet. The contract price is $469,000, and the work is scheduled
for completion in 1966.
Provision has been made in the agreements for the control of a further four
creeks on the North Shore, but as yet no final plans have been submitted for approval.
Hastings Creek Flood-control Project
An agreement under the Canada Water Conservation Assistance Act providing
for the construction of tributary diversion on Hastings Creek in North Vancouver
was entered into in late 1966,   The estimated cost of this project is $600,000.
 WATER INVESTIGATIONS BRANCH BB 81
Alberni Flood-control Project
The final design of the Alberni flood-control project under the Canada Water
Conservation Assistance Act is now in hand. The project involves the raising of
some 7,000 feet of River Road and the rechannelization and dyking of Kitsuksis
Creek to prevent the frequent flooding in the western section of Alberni City.
Final drawings and cost estimates are being prepared on behalf of the Water
Resources Service by the Department of Highways and should be ready by the end
of the year.
Lower Squamish Valley Flood- and Erosion-control Project
A report prepared by the Water Investigations Branch was forwarded to the
Federal Government early in 1965, followed by a formal submission in late 1965
for a flood- and erosion-control project in the Lower Squamish Valley under the
Canada Water Conservation Assistance Act. The cost of the project was estimated
at $2,000,000.
During 1966 further field work was carried out and a number of meetings held
with Federal Government and local authority representatives. In October a joint
committee of Federal and Provincial engineers was formed to study the various
aspects of this project.
Other Projects under the Canada Water Conservation
Assistance Act
During 1966 a number of inquiries and preliminary submissions were made
under the Act. Of particular mention in this connection is the Coquitlam River,
which has been the subject of a report by the Branch in the past and regarding which
further discussion took place with local government officials during the year.
Minor Projects
1. Quesnel River.—At the request of the Town of Quesnel, a study of river-
bank erosion along the Quesnel River within the municipality was undertaken early
in the year. A minimum project involving the placing of rock riprap along some
1,000 feet of river bank was accepted by the town, to be carried out during the current financial year, the cost, estimated at $25,000, to be shared by the Province
(75 per cent) and the local authority (25 per cent).
2. Granby River.—The Provincial-local landowner cost-sharing scheme initiated in 1965 for the Granby River to assist in combating land erosion was continued
in 1966 with the construction of approximately 1,000 feet of dykes.
3. Similkameen River Improvements.—A number of requests for assistance in
combating river-bank erosion along the Similkameen River were investigated, and
in one case assistance was given.
4. Nechako River.—Complaints of land erosion by the Nechako River at
Vanderhoof were investigated, but the undeveloped nature of the flood-plain land
did not warrant remedial action.
Lower Fraser Valley
Technical assistance was given to the Federal-Provincial committee in the
preparation of a report entitled "An Assessment of Dyke Reconstruction, Drainage
Improvements and River Bank Stabilization in the Lower Fraser Valley."
It was estimated that expenditures in the order of $33,000,000 would be required to give a satisfactory level of flood control in the Lower Mainland and to
provide for main drainage and pumping necessary to allow development and utiliza-
 BB 82 WATER RESOURCES SERVICE
tion of the protected land. The scheme encompasses not only the Fraser River
dyking system and sea dykes, but also tributary projects on the Coquitlam and
Vedder Rivers and the Nicomekl-Serpentine Basin drainage improvements.
Studies for Department of Highways
1. Bella Coola Area.—The highway between Bella Coola and Hagensborg is
threatened by flooding and erosion from the Bella Coola River and from side streams
joining the Bella Coola on the south bank. This problem was investigated in the
company of Department of Highways officials, and the brief report prepared as a
result included a number of suggestions to alleviate the problem.
2. Vancouver Island.—Peak discharge figures were established for a number
of streams on Vancouver Island at the request of the Department of Highways. In
arriving at these figures, a regional flood study covering the east and central watersheds of the Island was used. Essentially, a regional flood study relates the mean
annual floods in a homogeneous area to basin characteristics, in this case drainage
area, annual run-off, and lake area. The mean annual flood is converted to floods
of lesser frequency by means of a regional frequency curve established from an
analysis of flood data for the region.
3. Trans-Canada Highway, Kamloops East (Valleyview).—A proposal to
encroach on the South Thompson River to accommodate the relocation of the
Canadian Pacific Railway line, necessary to provide a four-lane highway, was
reviewed for the Department of Highways.
Stellako River
In connection with an investigation by the British Columbia Research Council
into the effects of log-driving on the Stellako River, several field trips were made
to the area to observe and collect data on the hydraulic aspects of the operation,
particularly as they pertain to changes in the river regime.
Winnipeg Flooding
In April of 1966 a field trip was made to Winnipeg to observe the flood-fighting
plan during the emergency situation existing at that time, with the Red River rising
to flood stage. Contact was established through the Manitoba Emergency Measures
Organization and an opportunity afforded to discuss the many aspects of the problems arising from a major flood with the various organizations and officials involved.
RECORDS COMPILATION AND REPORTS SECTION
A. Z. Stencel
The principal functions performed by this Section during the past year included
the assembly of engineering reports, operation of the Reports Library, collection and
compilation of technical and cost records, and general office duties for the Branch.
The year 1966 saw over 70 new engineering reports assembled and registered
in the Reports Library, bringing the total of available reports to almost 1,400. The
Reports Library serves as an extension to the Water Resources Service filing system.
A number of reports retained in the library have not been prepared for publication.
The increase in the number of reports received and registered during 10-year
periods is illustrated in the following table:—
 WATER INVESTIGATIONS BRANCH
BB 83
Period (Years)
1915-24 _.
1925-34 _
1935-44 ..
1945-54 _.
1955-64 _.
1965-66 _.
Totals
Number of Reports
Available
   175
40
37
   114
   855
.   153
Percentage of
Total Available
12.8
2.9
2.7
8.3
62.2
11.1
1,374
100.0
In addition to the new reports, 260 reproductions of older reports have been
prepared and distributed during the year, also requests for almost 100 copies of
various other publications filled.
Of the total of 1,374 reports in the library, 819 reports have been prepared by
Water Resources Service staff. The following table shows the number of such reports and the general fields which they cover:—
Technical Reports in Library Prepared by Water Resources Service Staff as of
December 31,1966
Period (Years)
Water
Power
Water
Supply
Floods,
Drainage,
Dyking
Groundwater
Hydrology
Miscellaneous
Total
1911-20.	
1921-25	
1926-30	
1931-35	
1936-40
13
107
25
7
8
21
14
26
6
5
3
26
5
1
10
27
57
69
108
16
~~3
8
40
38
51
5
1
1
1
....
1
1
8
1
5
:.:
2
10
9
12
1
2
4
4
1
3
7
10
14
20
2
19
141
35
9
g
1941-45	
1946-50  ...
1951-55	
1956-60 	
1961-65 	
1966. 	
35
59
151
137
201
24
Totals	
232
322
145
19
34
67
819
DRAUGHTING OFFICE
B. Varcoe, Chief Draughtsman
As in 1965, draughting for the Water Investigations Branch was carried out
by a total of 11 draughtsmen, although personnel have changed. One new man
was taken on strength and one man left during the year. The work continued to
be carried on in the Main Draughting Office, with the ARDA Draughting Section
working separately in another room. While separated physically, there was good
co-operation between offices, and work from all divisions was carried on in either
office as required.
During the year, work was done on 54 projects. These may be broken down
into 39 water-investigations projects and 16 construction projects. The investigations projects may be further broken down into 16 projects completed, 10 incomplete, 9 technical, of which no finished drawings were made, and 2 routine and
continuing projects for the Hydrology Division. Ninety-four drawings were made
for the completed projects, and many drawings, some complete, some incomplete,
have been made for the incomplete projects.
The construction projects, of which 14 were done in the ARDA Section, required 213 sheets and 75 working drawings.  The largest of these projects were the
 BB 84
WATER RESOURCES SERVICE
Vernon Irrigation District rehabilitation and the Southern Okanagan Lands Irrigation District, who which 57 and 43 drawings respectively were produced.
This past year, more than in previous years, technical knowledge has been used
by the draughtsmen in many of the projects on which work was done. In the ARDA
Section, it was estimated that approximately 20 per cent of the time was used in
design work. In the main office, nine exclusively technical projects were worked
on and at least on 11 other projects some technical calculations were required.
 POLLUTION CONTROL
BOARD
 WATER RESOURCES SERVICE
POLLUTION CONTROL BOARD
The Pollution Control Board, which deals with matters pertaining to water pollution,
was initially formed in 1956 and placed, at that time, under the administration of the
Minister of Municipal Affairs. Technical assistance to conduct the Board's business was
provided by the Department of Health through the staff of the Division of Public Health
Engineering. The functions of the Pollution Control Board were transferred on April 1,
1965, to the Water Resources Service, where administration of the Board is carried on
under the Minister of Lands, Forests, and Water Resources, with the Deputy Minister of
Water Resources acting as Chairman of the Board.
The functions of the Pollution Control Board are to deal with all matters as prescribed by the Act, technical and lay, pertaining to the discharge of domestic or industrial
wastes into any of the water resources of the Province, in areas designated by Order in
Council as coming under the Board's jurisdiction. The powers and duties of the Board,
carried out under the Executive Engineer, are:—
(a) To determine what qualities and properties of water shall constitute a polluted
condition.
(b) To prescribe standards regarding the quality and character of the effluent which
may be discharged.
(c) To conduct tests and surveys to determine the extent of pollution.
(d) To examine into all existing or proposed means for the disposal of sewage or
other waste materials.
(e) To notify all persons who discharge effluent into the said waters when the
effluent fails to meet the prescribed standards.
(/) To order any person to increase the degree of treatment of the effluent.
(g) To appoint technical committees.
To carry into effect the intent of the Pollution Control Act, the Board issues permits
to applicants who comply with the regulations and who satisfy the Board that the wastes
to be discharged will not be detrimental to health, sanitation, or the public interest.
 POLLUTION CONTROL BOARD BB 87
POLLUTION CONTROL BOARD
C. J. Keenan, P.Eng., Executive Engineer
Since placing the Pollution Control Board under the chairmanship of the
Deputy Minister of Water Resources and transferring the administration of the
operative functions of the Board from the Health Branch to the Water Resources
Service in 1965, the Water Resources Service has been able in 1966 to establish
a nucleus for a Pollution Control Branch. Under the Executive Engineer there are
now established eight positions, four of them engineering posts, the remainder comprising technician, draughting, and stenographic positions. To meet the increasing
demands for service, present personnel were moved to new accommodation, where
office space will permit staff expansion in the foreseeable future.
The Pollution Control Branch is primarily preoccupied with performing the
administrative functions associated with investigating and processing applications
for permits. The facts, general, administrative, and technological, of each investigation are laid before the Board when it meets each month to adjudicate on the applications made. The Board may grant, may amend and grant, or may refuse to grant
a permit. Applicants must satisfy the Board that the wastes to be discharged will
not be detrimental to health, sanitation, or the public interest. Any objections to
the issuance of a permit are investigated and, in some cases, public hearings are held
before a final decision is taken on the application. During 1966, 39 applications
were made, with 27 permits being granted. The remaining 12 applications were
either rejected as not being in the public interest and likely to cause some pollution
or are being held in abeyance awaiting resolution of extenuating circumstances.
During 1966 the Health Branch, in accordance with the Pollution Control Act,
continued to provide the Pollution Control Branch with assistance through the use
of the public health inspectors, who were responsible for carrying out many routine
field inspections and for the taking of samples for both chemical and bacteriological
analysis. All samples taken for pollution-control purposes are analysed in the Public
Health Laboratories by Health Branch staff.
From the Board's formation in 1956 until 1961, the extent of its jurisdiction
was the Lower Fraser Valley downstream from Hope, including all of the Greater
Vancouver and Boundary Bay areas. In 1961 the territorial area under the authority of the Board was extended to include all of the Columbia River drainage basin
which lies within the Province of British Columbia. Again, effective January 1,
1963, the jurisdiction of the Board as authorized by Order in Council was enlarged
to include the entire Fraser River basin and most of the populated area of the east
coast of Vancouver Island. On June 20, 1966, the area comprising Strathcona
Park on Vancouver Island was placed under the area of jurisdiction of the Pollution
Control Act.
Strathcona Park was placed under the jurisdiction of the Board to ensure that
a close surveillance would be maintained on the mining operations in the vicinity
of Buttle Lake. The permit issued for the mining operation calls for a high-quality
effluent and rigorous maintenance. A comprehensive continuous sampling programme has been prepared to ensure compliance. With the continued favourable
economic conditions in the Province, it is expected that the current high demand
for permits to discharge wastes will be maintained. During 1966 many applications
of a highly complex nature were processed. These included two new kraft pulp-mills
at Prince George, the existing pulp-mill at Powell River, and the widely publicized
new mining operation in Strathcona Park.
 BB 88 WATER RESOURCES SERVICE
The major achievement in 1966 was establishment of effluent standards for
new kraft pulp-mills to be located on inland fresh waters. The setting of standards
required careful investigation of existing national and international practices and
present-day technological knowledge pertaining to waste treatment of pulp-mill
effluents. The setting of standards called for close collaboration with the Federal
Department of Fisheries and the International Salmon Commission, as well as with
various Provincial Government agencies. As a result of investigations carried out,
the Board has been able to establish permissible levels for suspended solids, total
solids, biochemical oxygen demand, dissolved oxygen, mercaptans, sulphides, chlorine, temperature, and colour, as well as numerous other parameters to ensure that
the water resources of the Province are preserved for the beneficial use of all. In
conjunction with the standards laid down, each new pulp-mill under the Board's
jurisdiction is required to undertake an approved reliable monitoring programme
under the surveillance of the Pollution Control Branch engineers. The results of
each monitoring programme are plotted to evaluate on a continuous basis the
effectiveness of the waste-treatment facilities. Each permit carries many special
conditions prohibiting practices likely to affect water quality. The standards set are
amongst the highest requirements to be found anywhere and have been instrumental
to date in prohibiting the location of two pulp-mills on secondary rivers in the
Province where adequate treatment could not be provided to meet the prescribed
conditions. This early recognition of the need to set effluent standards speaks well
for the future preservation of the water resources of the Province.
 OFFICE
OF THE INSPECTOR OF
DYKES
  OFFICE OF INSPECTOR OF DYKES BB 91
OFFICE OF THE INSPECTOR OF DYKES
W. R. Meighen, P.Eng., Inspector of Dykes
ADMINISTRATION
The Inspector of Dykes has responsibilities with respect to all dykes in British
Columbia. Under the provision of the Dykes Maintenance Act, he exercises some
authority over various municipalities and dyking districts to ensure that the dykes
within their jurisdiction are maintained adequately.
Over 200,000 acres of land in British Columbia are protected by dykes. Within
the Lower Fraser Valley, there are at present 35 separately dyked areas; the
Kootenay Valley contains four such areas; and there is one near Pemberton in the
valley of the Lillooet River.
Ten of the Fraser Valley districts have in years past had their powers of local
self-government withdrawn and the areas placed under the direct administration of
the Office of the Inspector of Dykes. In these 10 districts, the Inspector holds all
of the powers previously vested in the Commissioners or the Trustees, including the
establishment of the tax rates and the collection of the levies required to provide
funds for the operation of the districts. Proposals are being considered whereby the
municipalities would assume the administration of the dyked areas within their
municipal boundaries, or alternatively the protected area would be returned to a
local self-governing administration having no connection with any municipality.
OPERATION
Weather in 1966 was near normal throughout the Province and no major flood
threat developed in any area. The spring run-off from the Fraser River basin and
from other drainage areas was orderly and of below average proportions.
Annual maintenance of dykes, pumps, waterways, and other drainage structures
was carried out by all districts. In addition, two relatively short sections of dyking
in the Municipality of Kent, one being part of the Harrison Mills dyke and the other
in the vicinity of Hamersley pump, were improved and strengthened. This work
was carried out as part of the over-all reconstruction of the municipality's dyking
system under a joint proposal whereby the Government of Canada and the Province
of British Columbia will participate financially with the local authority toward the
cost of reconstruction of all dykes in the Lower Fraser Valley. Also under this same
proposal, the Village of Harrison Hot Springs commenced an improvement programme for the Harrison Lake dyke.
River-bank protection work was completed by some 15 districts where erosion
of the banks constituted a threat to the dykes. The total expenditure on this work
by these 15 dyked areas was approximately $250,000. By arrangement, the Federal
and Provincial Governments each contribute 37Vi per cent of the cost of the work,
leaving 25 per cent to be financed by the local districts.
  SOUTHERN OKANAGAN
LANDS PROJECT
  SOUTHERN OKANAGAN LANDS PROIECT BB 95
SOUTHERN OKANAGAN LANDS PROJECT
L. A. Pinske, Project Supervisor
ADMINISTRATION
The Southern Okanagan Lands Project, comprising some 15,500 acres, occupies most of the southern portion of the Okanagan Valley to the International
Boundary. The project, with its extensive irrigation system, was constructed under
the Soldiers' Land Act, and land has been sold largely by public sale since the mid-
1920's both for farming and for orchard development. Small areas remain unalienated, and these are being disposed of, largely by public sale, as the demand arises.
In 1965 approximately 67 acres were sold in 11 parcels, of which eight were suitable
for agriculture and the remainder were town-sized lots within or near the Village of
Oliver. Plans were initiated for the disposal of yet more of the unsubdivided areas
since public interest continues in the possibilities of the area for grape production.
The project and its irrigation system have been administered by the Province
since its inception. The irrigation-works will be transferred to local administration
under the Water Act as soon as the system has been rehabilitated. Replacement of
much of the old gravity system is being carried out with financial assistance from
the Federal and Provincial Governments, with funds being made available through
the Agricultural and Rural Development Act.
OPERATION
Irrigation service commenced when water was turned into the main canal at
the headworks on the Okanagan River on April 12th and continued through to
September 20th, except for a brief period between September 15th and 17th when
the system was closed down to remove algae and other aquatic growth.
General repairs and regular maintenance were carried out over the system,
including timber replacement on flumes, stave replacement in the small siphon, and
lining of the main siphon with creosoted plywood.
Three flumes at the southern extremity of the system were removed. They are
no longer required because that area will now be served by the newly installed pressure system which draws water from Osoyoos Lake.
Under the rehabilitation scheme, Pump System No. 9, serving the area from
the Richter Pass Highway south to the International Boundary, was completed,
and construction commenced on Pump Systems Nos. 8 and 7, which will serve the
area from the Richter Pass Highway north to the head of Osoyoos Lake and thence
north to Testalinden Creek respectively.
Under Order in Council, the Osoyoos and Black Sage Irrigation Districts were
provided with ditch-riding services, for which charges were made at the usual rate.
Annual Revenue
Irrigation collections     $79,979.00
Land sales       47,445.00
Sundries (topsoil, gravel, sand, maps, payments from irrigation districts)        59,339.00
Total   $186,763.00
  PERSONNEL OFFICE
and
ACCOUNTING DIVISION
  PERSONNEL office
BB 99
PERSONNEL OFFICE
J. H. Palmer, Personnel Officer
The permanent establishment of the Department was increased by 22 positions
this year. Two of these were to provide official positions for the Executive Engineer,
Pollution Control Board and his secretary, who were temporarily covering off other
vacancies in the establishment. One new position of Draughtsman 2 on the staff of
the Board was filled, but two other positions of Technician and one as Engineer 4
for this Board remain vacant at the time of writing. The remaining 16 positions
were all for the Water Investigations Branch. These included eight engineers, five
technicians, and three draughtsmen. It has been possible to fill only two of this
group to date.
The table below summarizes personnel activities for 1966 and the three previous years. It will be seen that the Department experienced the same turnover as
in 1965, but that this volume was three times what it had been in 1963 and 1964.
Comparable figures for earlier years are as follows:-—■
1966
1965
1964
1963
24
18
10
4
4
17
3
25
6
4
22
20
4
2
5
17
3
25
6
1
18
16
7
3
3
5
1
18
i
16
9
11
16
2
Terminations for continuous staff  —    —    	
6
Short-term casual appointments and terminations1..   	
23
Extensions of service granted     _   	
....
1 Excluding Southern Okanagan Lands Project casuals.
While the current economic boom hampered recruitment, particularly of engineers and technicians, the Department was fortunate in obtaining the services of
seven engineers, three of whom came from the United Kingdom following advertising
there and throughout Canada. Two other engineers were engaged to report early
in 1967. This particular competition alone required this office to write over 100
letters for its completion.
Principal promotions during the year included the following in the Water Investigations Branch: Mr. J. D. Watts was promoted to Engineer 5 as Chief, Basin
Planning and Power Division; Mr. D. J. Pennington was promoted to Engineer 5
as Chief, ARDA Division; and Mr. B. E. Marr to Engineer 5, Projects Division.
In the Water Rights Branch, Mr. H. M. Hunt, a former employee of the Fraser River
Board, returned to the Department as Engineer 6 in charge of the Power and Major
Licences Division; Mr. D. E. Smuin was promoted to Engineer 4 as District Engineer, Kamloops; and Mr. W. R. Tuthill was promoted Administrative Officer 2 as
Chief, Water Licensing Division.
Mr. J. H. Hallett, General Foreman, Southern Okanagan Lands Project was
retained beyond the normal retirement age to assist with the rehabilitation of the
irrigation-works there, and Mr. E. A. Walls, Administrative Officer 1, Lands Branch,
was engaged following his retirement from the Lands Service. Mr. Walls is assisting
the Deputy Minister in the administration of Provincially owned lands in the
Okanagan flood-control project. Mr. C. Errington, District Engineer, Victoria,
had his appointment extended to November 30th when he retired.    Mr. W. H.
 BB 100 WATER RESOURCES SERVICE
Christmas, of the Water Investigations Branch, and Mr. A. A. Sutherland, of the
Southern Okanagan Lands Project staff, retired after 9 and 20 years' service
respectively.
Mr. J. T. Gulliver was awarded a Diploma in Public Administration by the
University of Victoria following his completing the course requirements under the
Executive Development Training Plan. Mr. R. W. Aldred completed the one-year
correspondence course in Basic Public Administration, and Mr. E. J. Nye enrolled
for this course.
 ACCOUNTING DIVISION
BB  101
ACCOUNTING DIVISION
M. B. Maclean, Departmental Comptroller
Water Rights Branch revenue for 1966 was 1.5 per cent higher than in 1965.
Revenue by Purpose
Domestic, incidental use, and fees  $83,030
Waterworks   20,427
Irrigation   21,936
Power   2,084,818
Funds held on application  75,721
Total  $2,285,932
Comparison of Water Rentals and Recording Fees for 10-year
Period 1957-66, Inclusive
1957  $1,152,370                1962  $2,115,738
1958     1,256,004                1963   1,935,778
1959     1,363,939                1964  2,175,223
1960     1,510,278                1965  2,251,025
1961      1,853,653                1966  2,285,932
Ten-year average, $1,789,994.
Printed by A. Sutton, Printer to the Queen's Most Excellent Majesty
in right of the Province of British Columbia.
1967
1,330-567-2934
   

Cite

Citation Scheme:

        

Citations by CSL (citeproc-js)

Usage Statistics

Share

Embed

Customize your widget with the following options, then copy and paste the code below into the HTML of your page to embed this item in your website.
                        
                            <div id="ubcOpenCollectionsWidgetDisplay">
                            <script id="ubcOpenCollectionsWidget"
                            src="{[{embed.src}]}"
                            data-item="{[{embed.item}]}"
                            data-collection="{[{embed.collection}]}"
                            data-metadata="{[{embed.showMetadata}]}"
                            data-width="{[{embed.width}]}"
                            async >
                            </script>
                            </div>
                        
                    
IIIF logo Our image viewer uses the IIIF 2.0 standard. To load this item in other compatible viewers, use this url:
http://iiif.library.ubc.ca/presentation/cdm.bcsessional.1-0364212/manifest

Comment

Related Items