BC Historical Documents

[Reports on Coast Range Steel] Freyn Engineering Company

Description

Report by Freyn Engineering Limited, outlining recommendations for establishing a steel plant to process Texada Island ore deposits. Covering letter from F.H. Willcox of Freyn Engineering is dated 1930-01-29. A report on coking tests dated 1930-04-10 is appended to section I, with an enclosing letter from Freyn dated 1930-04-21 . Section II is followed by an undated market report comparing pig iron and rolled sheet tonnage. A revised summary of construction costs, dated 1932-03-25, follows the main report.

Item Media

Item Citations and Data

Rights

Images provided for research and reference use only. Permission to publish, copy or otherwise distribute these images please contact Rare Books and Special Collections: http://rbsc.library.ubc.ca