- Library Home /
- Search Collections /
- Open Collections /
- Browse Collections /
- UBC Theses and Dissertations /
- Methanol induced biological nutrient removal in a full-scale...
Open Collections
UBC Theses and Dissertations
UBC Theses and Dissertations
Methanol induced biological nutrient removal in a full-scale sequencing batch reactor Louzeiro, Nuno
Abstract
The primary goal of this research was to determine the potential for denitrification and phosphorus removal of a full-scale SBR, with and without the use of methanol as an external carbon source. This study was conducted at the Kent Wastewater Treatment Plant, in Agassiz, British Columbia, Canada, which has two SBRs working in parallel; one SBR was used as a control, and the other was used for the experiment. Methanol was fed into the experimental SBR during the anoxic cycle to achieve approximate concentrations of 4.1, 8.1, and 12.2 mg CH₃OH/L. Each dosage was applied for a one-month period. The full-scale control SBR, without methanol addition, achieved negligible denitrification rates. However, two denitrification rates were observed in the full-scale experimental SBR, with methanol addition; an initial fast rate and a slower second rate. Methanol was utilized as the carbon source for denitrification during the first rate period. The denitrification rate (K[sub DN], mg NO[sub x]/g MLVSS/day) during this period increased with increasing methanol concentration (M, mg CH₃OH/L) according to the following relationship: K[sub DN] =-0.203•M² + 3.93•M, until a maximum denitrification rate of approximately 19 mg NOx/g MLVSS/day was attained. Following the depletion of the methanol, denitrification reactions continued by using the available natural carbon in the influent, resulting in a slower second denitrification rate. Biological phosphate uptake and release was only observed to a significant extent in the experimental SBR with methanol addition. The phosphate release, which commenced once a very low nitrate concentration was achieved, had a rate of approximately 2.7 mg P/g MLVSS/day and was likely caused by a supply of natural short chain carbon in the influent wastewater. Methanol was not utilized to a significant extent as the carbon source for the enhanced biological phosphorus removal (EBPR) process. However, methanol addition was critical to the EBPR process, since it depleted the available nitrates, and, thus, allowed EBPR to take place. It was demonstrated during the full-scale study that the settleability was linearly related to the denitrification rate. The average total change in the ORP, during a four-hour SBR cycle, was also linearly related to the denitrification rate.
Item Metadata
Title |
Methanol induced biological nutrient removal in a full-scale sequencing batch reactor
|
Creator | |
Publisher |
University of British Columbia
|
Date Issued |
2000
|
Description |
The primary goal of this research was to determine the potential for denitrification and
phosphorus removal of a full-scale SBR, with and without the use of methanol as an external carbon
source. This study was conducted at the Kent Wastewater Treatment Plant, in Agassiz, British
Columbia, Canada, which has two SBRs working in parallel; one SBR was used as a control, and the
other was used for the experiment. Methanol was fed into the experimental SBR during the anoxic
cycle to achieve approximate concentrations of 4.1, 8.1, and 12.2 mg CH₃OH/L. Each dosage was
applied for a one-month period.
The full-scale control SBR, without methanol addition, achieved negligible denitrification
rates. However, two denitrification rates were observed in the full-scale experimental SBR, with
methanol addition; an initial fast rate and a slower second rate. Methanol was utilized as the carbon
source for denitrification during the first rate period. The denitrification rate (K[sub DN], mg NO[sub x]/g
MLVSS/day) during this period increased with increasing methanol concentration (M, mg CH₃OH/L)
according to the following relationship:
K[sub DN] =-0.203•M² + 3.93•M,
until a maximum denitrification rate of approximately 19 mg NOx/g MLVSS/day was attained.
Following the depletion of the methanol, denitrification reactions continued by using the available
natural carbon in the influent, resulting in a slower second denitrification rate.
Biological phosphate uptake and release was only observed to a significant extent in the
experimental SBR with methanol addition. The phosphate release, which commenced once a very low
nitrate concentration was achieved, had a rate of approximately 2.7 mg P/g MLVSS/day and was likely
caused by a supply of natural short chain carbon in the influent wastewater. Methanol was not utilized
to a significant extent as the carbon source for the enhanced biological phosphorus removal (EBPR)
process. However, methanol addition was critical to the EBPR process, since it depleted the available
nitrates, and, thus, allowed EBPR to take place.
It was demonstrated during the full-scale study that the settleability was linearly related to the
denitrification rate. The average total change in the ORP, during a four-hour SBR cycle, was also
linearly related to the denitrification rate.
|
Extent |
6991591 bytes
|
Genre | |
Type | |
File Format |
application/pdf
|
Language |
eng
|
Date Available |
2009-07-06
|
Provider |
Vancouver : University of British Columbia Library
|
Rights |
For non-commercial purposes only, such as research, private study and education. Additional conditions apply, see Terms of Use https://open.library.ubc.ca/terms_of_use.
|
DOI |
10.14288/1.0064021
|
URI | |
Degree | |
Program | |
Affiliation | |
Degree Grantor |
University of British Columbia
|
Graduation Date |
2000-05
|
Campus | |
Scholarly Level |
Graduate
|
Aggregated Source Repository |
DSpace
|
Item Media
Item Citations and Data
Rights
For non-commercial purposes only, such as research, private study and education. Additional conditions apply, see Terms of Use https://open.library.ubc.ca/terms_of_use.