Optimizing the vertical alignment under earthwork block removal constraints in road construction Rahman, Md. Faisal 2012

You don't seem to have a PDF reader installed, try download the pdf

Item Metadata

Download

Media
[if-you-see-this-DO-NOT-CLICK]
ubc_2012_fall_rahman_md_faisal.pdf [ 2.01MB ]
[if-you-see-this-DO-NOT-CLICK]
Metadata
JSON: 1.0072880.json
JSON-LD: 1.0072880+ld.json
RDF/XML (Pretty): 1.0072880.xml
RDF/JSON: 1.0072880+rdf.json
Turtle: 1.0072880+rdf-turtle.txt
N-Triples: 1.0072880+rdf-ntriples.txt
Original Record: 1.0072880 +original-record.json
Full Text
1.0072880.txt
Citation
1.0072880.ris

Full Text

Optimizing the Vertical Alignment under Earthwork Block Removal Constraints in Road Construction by Md. Faisal Rahman  B.Sc., Bangladesh University of Engineering and Technology, 2009  A THESIS SUBMITTED IN PARTIAL FULFILLMENT OF THE REQUIREMENTS FOR THE DEGREE OF MASTER OF SCIENCE in The College of Graduate Studies (Interdisciplinary Studies)  THE UNIVERSITY OF BRITISH COLUMBIA (Okanagan) July 2012 c Md. Faisal Rahman 2012  Abstract The road design problem is usually split into the horizontal alignment, the vertical alignment, and the earthwork scheduling problems. Optimizing the vertical alignment assumes a predetermined horizontal alignment and changes the height of the road at different points to minimize overall construction costs, while maintaining the design requirements. The problem gets complicated because of the natural blocks like rivers, mountains, etc., in the road construction area. Existing vertical alignment models deal with the blocks before the beginning of road construction, which sometimes results in a non-optimal solution. A substantial portion of the total construction cost comes from the earthwork operations. As a result, some existing models only find the optimal earthwork schedule for a predetermined vertical alignment. This research extends a recent mixed integer linear programming (MILP) model that considers blocks when optimizing earthwork operations. We propose a novel model of vertical alignment that considers blocks. In the model, we propose a novel way of incorporating side-slopes of the road to improve the accuracy of the model. Our numerical results show a considerable improvement in the accuracy of the model without introducing significant computational burden. Finally, we propose another novel model using concepts from the network flow algorithms that gives more that 75% speedup for 87% of the problems for our test set of 280 problems.  ii  Table of Contents Abstract  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  ii  Table of Contents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  iii  List of Tables . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  v  List of Figures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  viii  List of Algorithms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  ix  Glossary of Notation  . . . . . . . . . . . . . . . . . . . . . . . . . . . .  x  Acknowledgements . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  xi  Dedication . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  xii  1  Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.1 Road design . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.2 Intelligent road design . . . . . . . . . . . . . . . . . . . . . . .  1 1 5  2  Models for Vertical Alignment and Earthwork Optimization . . . . 2.1 Spline LP model for vertical alignment optimization . . . . . . . 2.2 MILP model for earthwork optimization with blocks . . . . . . .  13 13 24  3  A Basic MILP Model for Vertical Alignment Side-slopes . . . . . . . . . . . . . . . . . . . 3.1 Definitions and model parameters . . . . 3.2 Model description . . . . . . . . . . . . 3.3 Model summary . . . . . . . . . . . . . 3.4 Model evaluation . . . . . . . . . . . . . 3.5 Algorithms . . . . . . . . . . . . . . . .  32 33 36 51 54 55  Considering Blocks and . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  iii  Table of Contents 4  A Quasi-network-flow Model for Vertical Alignment Considering Blocks and Side-slopes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 60 4.1 Definitions and model parameters . . . . . . . . . . . . . . . . . 61 4.2 Model description . . . . . . . . . . . . . . . . . . . . . . . . . 64 4.3 Model summary . . . . . . . . . . . . . . . . . . . . . . . . . . 72 4.4 Model evaluation . . . . . . . . . . . . . . . . . . . . . . . . . . 78  5  Numerical Results . . . . . . . . . . . 5.1 Experimental equipments . . . . 5.2 Basic problem set and parameters 5.3 Test configuration 1 . . . . . . . 5.4 Test configuration 2 . . . . . . . 5.5 Test configuration 3 . . . . . . . 5.6 Summary of the results . . . . . .  . . . . . . .  80 81 81 82 86 89 92  6  Conclusion and Future Work . . . . . . . . . . . . . . . . . . . . . . 6.1 Conclusion . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6.2 Future work . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  93 93 93  Bibliography . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  96  . . . . . . .  . . . . . . .  . . . . . . .  . . . . . . .  . . . . . . .  . . . . . . .  . . . . . . .  . . . . . . .  . . . . . . .  . . . . . . .  . . . . . . .  . . . . . . .  . . . . . . .  . . . . . . .  . . . . . . .  . . . . . . .  Appendix A  Asymptotic Bounds . . . . . . . . . . . . . . . . . . . . . 103  Appendix B  Tables  . . . . . . . . . . . . . . . . . . . . . . . . . . . . 105  iv  List of Tables 1.1 1.2  3.1  4.1  5.1  5.2  5.3 5.4  Total transportation expenses (in millions of dollars) by all government levels of Canada, 2005/06-2009/10 . . . . . . . . . . . . . . Casualty collisions, fatalities, and injuries in roads of Canada, 20052009 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  2 2  Number of constraints created by different equations of the basic MILP model . . . . . . . . . . . . . . . . . . . . . . . . . . . .  56  Number of constraints created by different equations of the quasinetwork-flow model . . . . . . . . . . . . . . . . . . . . . . . .  79  The basic problem set showing the roads, their fixed length for all test problems, and their fixed section length for most of the test problems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Problem (R-k, where k is the number of cut and fill entries in the lookup table, AM or NGM for road R) set summary for Test configuration 1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Problem (R-ng , where ng is the number of sections per segment for road R) set summary for Test configuration 2 . . . . . . . . . Problem (R-k, nz , nr , where k = ki+ = ki− , nz is the number of blocks, and nr is the number of access roads for road R) set summary for Test configuration 3 . . . . . . . . . . . . . . . . . .  81  83 87  90  B.1 Required time in seconds (tR,k s), normalized time (tR,k ), optimal 400 ), and percent cost (CR,k ), optimal cost with corrected volume (CR,k absolute relative error (| R,k |) for the problems (R-k) of Test configuration 1 (Roads-A,B) . . . . . . . . . . . . . . . . . . . . . . 105 B.2 Required time in seconds (tR,k s), normalized time (tR,k ), optimal 400 ), and percent cost (CR,k ), optimal cost with corrected volume (CR,k absolute relative error (| R,k |) for the problems (R-k) of Test configuration 1 (Roads-C,D,E) . . . . . . . . . . . . . . . . . . . . . 106  v  List of Tables B.3 Required time in seconds (tR,k ), optimal cost (CR,k ), optimal cost 400 ), and percent absolute relative error with corrected volume (CR,k (| R,k |) for the problems (R-k) of Test configuration 1 (Roads-F,G) B.4 Optimal cost (CR,ng ), normalized cost (C R,ng ), required time (tR,ng ), and normalized time (tR,ng ) for the problems (R-ng ) of Test configuration 2 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . b B.5 Cost (CR,k,n ) and timing (tbR,k,nz ,nr ) of the basic MILP model, z ,nr n cost (CR,k,nz ,nr ) and timing (tnR,k,nz ,nr ) of the quasi-network-flow model, percent difference in cost (δR,k,nz ,nr ), and percent improvement (ηR,k,nz ,nr ) for the problems (R-k, nz , nr ) of Test configuration 3 (Part-1) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . b B.6 Cost (CR,k,n ) and timing (tbR,k,nz ,nr ) of the basic MILP model, z ,nr n cost (CR,k,nz ,nr ) and timing (tnR,k,nz ,nr ) of the quasi-network-flow model, percent difference in cost (δR,k,nz ,nr ), and percent improvement (ηR,k,nz ,nr ) for the problems (R-k, nz , nr ) of Test configuration 3 (Part-2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . b B.7 Cost (CR,k,n ) and timing (tbR,k,nz ,nr ) of the basic MILP model, z ,nr n cost (CR,k,nz ,nr ) and timing (tnR,k,nz ,nr ) of the quasi-network-flow model, percent difference in cost (δR,k,nz ,nr ), and percent improvement (ηR,k,nz ,nr ) for the problems (R-k, nz , nr ) of Test configuration 3 (Part-3) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . b B.8 Cost (CR,k,n ) and timing (tbR,k,nz ,nr ) of the basic MILP model, z ,nr n cost (CR,k,nz ,nr ) and timing (tnR,k,nz ,nr ) of the quasi-network-flow model, percent difference in cost (δR,k,nz ,nr ), and percent improvement (ηR,k,nz ,nr ) for the problems (R-k, nz , nr ) of Test configuration 3 (Part-4) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . b B.9 Cost (CR,k,n ) and timing (tbR,k,nz ,nr ) of the basic MILP model, z ,nr n cost (CR,k,nz ,nr ) and timing (tnR,k,nz ,nr ) of the quasi-network-flow model, percent difference in cost (δR,k,nz ,nr ), and percent improvement (ηR,k,nz ,nr ) for the problems (R-k, nz , nr ) of Test configuration 3 (Part-5) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . b B.10 Cost (CR,k,n ) and timing (tbR,k,nz ,nr ) of the basic MILP model, z ,nr n cost (CR,k,n ) and timing (tnR,k,nz ,nr ) of the quasi-network-flow z ,nr model, percent difference in cost (δR,k,nz ,nr ), and percent improvement (ηR,k,nz ,nr ) for the problems (R-k, nz , nr ) of Test configuration 3 (Part-6) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  107  108  109  110  111  112  113  114  vi  List of Tables b B.11 Cost (CR,k,n ) and timing (tbR,k,nz ,nr ) of the basic MILP model, z ,nr n cost (CR,k,n ) and timing (tnR,k,nz ,nr ) of the quasi-network-flow z ,nr model, percent difference in cost (δR,k,nz ,nr ), and percent improvement (ηR,k,nz ,nr ) for the problems (R-k, nz , nr ) of Test configuration 3 (Part-7) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 115 b B.12 Cost (CR,k,n ) and timing (tbR,k,nz ,nr ) of the basic MILP model, z ,nr n cost (CR,k,n ) and timing (tnR,k,nz ,nr ) of the quasi-network-flow z ,nr model, percent difference in cost (δR,k,nz ,nr ), and percent improvement (ηR,k,nz ,nr ) for the problems (R-k, nz , nr ) of Test configuration 3 (Part-8) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 116  vii  List of Figures 1.1 1.2  Ground profile and corresponding road profile (in 2D) . . . . . . . Crest and sag vertical curves . . . . . . . . . . . . . . . . . . . .  3 5  2.1 2.2  Optimized vertical alignment for a hypothetical road example . . . Optimized earthwork schedule for a hypothetical road example (with blocks). . . . . . . . . . . . . . . . . . . . . . . . . . . . .  23  3.1 3.2 3.3 3.4 3.5  The cross-section of a road with and without side-slopes (for a cut). The cross-section of a road with and without side-slopes (for a fill). Approximation of side-slopes (for a cut). . . . . . . . . . . . . . . Approximation of side-slopes (for a fill). . . . . . . . . . . . . . . Convexity of Vi+ when 0 < A1i < A2i < A3i . . . . . . . . . . . . .  40 40 41 41 46  4.1  A typical section i at time-step t (where ϑ(j) = ϕ(k) = i). . . . .  61  5.1  Percent absolute relative error for NGM and AM approaches of Moreb’s model and the basic MILP model with different numbers of cut and fill entries in the lookup table . . . . . . . . . . . . . . Normalized time for NGM and AM approaches of Moreb’s model and the basic MILP model with different numbers of cut and fill entries in the lookup table . . . . . . . . . . . . . . . . . . . . . The change of normalized cost with respect to the number of sections per segment for each of the roads . . . . . . . . . . . . . . The change of normalized time with respect to the number of sections per segment for each of the roads . . . . . . . . . . . . . . A histogram showing the number of problems solved within different improvement range . . . . . . . . . . . . . . . . . . . . . . .  5.2  5.3 5.4 5.5  31  85  85 88 88 91  viii  List of Algorithms 3.1 3.2 3.3 3.4  DS . . . . . DSS . . . . M dmax α . M T dmax α  . . . .  . . . .  . . . .  . . . .  . . . .  . . . .  . . . .  . . . .  . . . .  . . . .  . . . .  . . . .  . . . .  . . . .  . . . .  . . . .  . . . .  . . . .  . . . .  . . . .  . . . .  . . . .  . . . .  . . . .  . . . .  . . . .  . . . .  . . . .  . . . .  56 57 58 59  ix  Glossary of Notation ∞ ˆ  Infinity. Summation. Integral.  ∅ |A|  The empty set. The number of elements of the set A.  a∈A  a is an element of the set A.  a∈ /A  a is not an element of the set A.  a∈A∪B a ∈ A\B  a is an element of A or B. a is an element of A but not B.  A⊆B  a ∈ A implies a ∈ B.  A×B  Cartesian product {(x, y) : x ∈ A, y ∈ B}.  f  Derivative of a function f .  min f  Minimum of a function f .  dom f  Domain of a function f  ω:A→B  ω is a mapping function on the set dom ω ⊆ A into the set B.  Θ(.)  Asymptotic tight bound.  O(.)  Asymptotic upper bound.  Ω(.)  Asymptotic lower bound.  x  Acknowledgements I would like to express my gratitude to all the individuals who were involved directly or indirectly with this work. Specially, I would like to thank my supervisor Dr. Yves Lucet for his guidance during the research. His knowledge and patience were essential for every aspects of this thesis. I would also like to thank Dr. Warren Hare, who is a member of my graduate committee, for listening to my problems with patience, providing me with valuable guidelines, and helping me grow my interests in Mathematics. I am very grateful to Dr. Heinz Bauschke, who is also a member of my graduate committee, for his cheerful encouragements and his constructive criticisms that helped me improve my presentation and writing skills. I would like to express my appreciation to our industrial partner (who wishes to remain anonymous) for providing us with the valuable technical details and practical data for the models. I would like to express my sincere gratitude to Dr. Donovan Hare for giving me ideas about different optimization techniques and helping me develop a new model to speedup the computational time. It is my pleasure to thank Jessica Weeres for her contributions to this project and her help to overcome some of the early difficulties of this research, Kasra Bigdeli for helping me implement some previous work in this area, and Sunny Mehrotra for helping me with the ideas about the speedup of the models. I am indebted to my parents for their prayers and moral support. A special thanks goes to all my colleagues and friends for their inspiration. This research is partially funded by an Engage Grants Program from the Natural Sciences and Engineering Research Council (NSERC) of Canada and an Accelerate internship program from the Mathematics of Information Technology and Complex Systems (MITACS).  xi  Dedication  To my brother Fahim and sister Tamanna.  xii  Chapter 1  Introduction If you would understand anything, observe its beginning and its development. Aristotle (384 BC - 322 BC) The first roadways were the tracks made by travelers and their pack animals in about 10000 BC. But it was not before 5000 BC when men started constructing roads because of their socioeconomic needs due to the growth of civilization [Lay93]. Pierre Trésaguet (1716-1796) is recognized to be the first who thought of designing the road scientifically, although very sophisticated road designs were found in the Roman Empire. Since Trésaguet, the area of scientific road design has been enriched by many researchers. In this chapter, we will recall some of these research results and discuss the importance and the basic concepts of road design.  1.1  Road design  Good communication is the essence of economic development for any country. As a result, each year the government allocates a significant part of its annual budget to maintain a high quality road infrastructure. For example, in 2009/10 all levels of Canadian government spent about 28.9 billion dollars for maintaining the existing road infrastructure and constructing new roads [Min10b]. Table 1.1 shows the total expenses of different transportation sectors by all government levels of Canada from 2005/06 to 2009/10 [Min10a]. A good portion of the transportation budget is allocated to road construction and maintenance. It is therefore in the interest of the government to minimize road construction and maintenance cost as much as possible. At the same time, safety is also a very important factor. Every year about 142,376 collisions occur with about 2,739 fatalities (2004 – 2008 average [Min10a]). Table 1.2 shows the statistics of road collisions, injuries, and casualties from 2005 to 2009. Consequently, a scientifically well-designed road can save not only millions of dollars but also a lot of lives. At the same time, it can also consider the environmental impacts [Jha03, Aka03] and the socioeconomic 1  1.1. Road design Table 1.1: Total transportation expenses (in millions of dollars) by all government levels of Canada, 2005/06-2009/10 Year  2005/06(R)  2006/07(R)  2007/08(R)  2008/09(R)  2009/10(R)  Air  849  890  897  927  1,183  Rail  264  241  326  387  435  17,042  18,444  22,386  26,935  28,934  Road  Notes: 1. R = Revised.  Table 1.2: Casualty collisions, fatalities, and injuries in roads of Canada, 20052009 Year Casualty collisions Fatalities Injuries  2005  2006  2007  2008(R)  2009(E)  148,154  145,130  141,094  129,816  126,360  2,898  2,884  2,761  2,419  2,200  204,764  199,994  192,762  176,433  171,851  Notes: 1. R = Revised. E = Planned and/or estimated. 2. “Casualty collisions” exclude collisions involving property damage only. 3. “Fatalities” include those who died in traffic collision. 4. “Injuries” include all those who suffered any visible injury or complained of pain.  effects [DJ09] of the road construction process. For these reasons, scientific road design has become an important research topic. Definition 1.1. Ground profile and road profile. The ground (respectively road) profile is the vertical profile of the ground before (respectively after) the road is constructed. See Figure 1.1. The objective of the road construction procedure is to convert the ground profile into the road profile ideally using a 3D model. But due to computational limitations, most researchers divide the road design procedure into horizontal and vertical alignment design [JSJ06, GLA05, GCF88, Fwa89, Sch00].  1.1.1  Horizontal alignment design  Given any two points on earth, the purpose of the horizontal alignment design is to find the best route among all possible routes to build the road. The projection of the three-dimensional ground profile on a horizontal plane is analyzed in the horizontal alignment design procedure. The best route should have the lowest cost while maintaining all the design requirements. Some constraints of the horizontal 2  1.1. Road design  375  Height  370  365  360 Ground Profile Road Profile  355 0  100  200  300  400  500 Station  600  700  800  900  1000  Figure 1.1: Ground profile and corresponding road profile (in 2D) alignment design come from the laws of mechanics and are sometimes determined empirically. For the basic understanding of the theory of horizontal alignment design we refer to [AAS04].  1.1.2  Vertical alignment design  Vertical alignment is generally calculated for a predetermined horizontal alignment. The input of the vertical alignment is the projection of the three dimensional ground profile sliced by the horizontal alignment on a vertical plane. The output is the final road profile. Cost components of the vertical alignment design A major cost component of the vertical alignment design is the earthwork cost. It consists of the earth cutting cost (also known as the excavation cost), the earth filling cost (also known as the embankment cost), and the earth movement cost (also known as the hauling cost). Pavement is defined to be the hard surface of a road. Pavement costs depend mainly on the thickness and quality of the pavement materials used, both of which depend on the roadbed soil [Fwa89]. Land acquisition costs may vary along the length of the road depending on the geographic location, current state of the location, and type of construction (cut or fill) [Fwa89]. Vehicle operating costs can be divided into primary and secondary vehicle operating costs. The primary vehicle operating cost is the cost of operating the vehicle during the road construction process, while the secondary vehicle operating  3  1.1. Road design cost is the cost of operating vehicle after the road is constructed (mainly user and maintenance costs). Both of these costs depend mainly on the slope of the road. Fwa [Fwa89] also studied the effects of earthwork cost on the overall construction cost for vertical alignment design. As expected, the overall construction cost linearly increases with the increase of the earth cutting cost, the earth filling cost, and the earth movement cost. Design requirements for the vertical alignment Fwa [Fwa89] discussed three major design requirements that must be maintained for vertical alignment, namely the maximum allowable gradient, curvature requirements, and the fixed point constraints. The maximum allowable gradient mainly depends on the type of terrain of a road, type of vehicles to be operated on the road, and the maximum vehicle speed [Fwa89]. The curvature requirements depend on the minimal stopping sight distance, type of vertical curve (crest or sag), and the length of the vertical curve [AAS04]. Definition 1.2. Sight distance. The length of the road visible to the driver when he is driving is called the sight distance. The minimal sight distance required to stop a vehicle to prevent an accident is called the minimal stopping sight distance. The minimal stopping sight distance depends on the maximum speed of a road and the transportation rules of the region. Definition 1.3. Crest and Sag vertical curves. A crest vertical curve is a concave parabolic curve, whereas a sag vertical curve is a convex parabolic curve. Figure 1.2 shows the two types of vertical curves. If A is the percentage slope change, L is the length of the vertical curve, S is the sight distance, h1 is the height of the driver’s eye above roadway surface, and h2 is the height of an object above the roadway surface then the curvature requirements for the crest vertical curves are given by the following equations [AAS04, GLA05, Fwa89], √ √ 2 100 2h1 + 2h2 A≤ , if L ≤ S, (1.1a) 2S − L √ √ 2 100 2h1 + 2h2 L A≤ , if L > S, (1.1b) S2 and the curvature requirements for the sag vertical curves are 120 + 3.5S , 2S − L L (120 + 3.5S) A≤ , S2 A≤  if L ≤ S,  (1.1c)  if L > S.  (1.1d) 4  1.2. Intelligent road design  L -G1 +G1  +G2  -G2 L Crest Vertical Curve  Sag Vertical Curve  L= Length of the vertical curve. G1= Slope at the beginning of the curve. G2= Slope at the end of the curve.  Figure 1.2: Crest and sag vertical curves It should be noted that the values of h1 , h2 are predetermined, and all the lengths and distances are given in meters. Equations (1.1a) to (1.1d) may slightly vary depending on the transportation rules of a specific region. Fixed point constraints enforce that at some points along the road the height of the road must be fixed. Typically, the elevation at the start and end points of a new highway is fixed, and when a new highway intersects with an existing highway the elevation of the intersect points are also fixed.  1.2  Intelligent road design  Intelligent road design refers to the process of planning and designing roads with the aid of sophisticated computer algorithms. Many researchers are working in this area, and many techniques have been proposed over the years. In this section, we will briefly go through some of these techniques with their advantages and disadvantages.  1.2.1  Models for optimizing 3D alignment  Three dimensional (3D) alignment optimization is the process of optimizing horizontal and vertical alignment simultaneously. Because of the complexity of modeling 3D alignment and computational limitations, not many models of the 3D alignment optimization are found in the literature. Hogan [Hog73] presented a dynamic programming model named OPTLOC for optimizing 3D alignment, and later Nicholson, Elms, and Williman [NEW76] proposed a two stage approach where the first stage was similar to Hogan’s model, and in the second stage refine5  1.2. Intelligent road design ments were computed using discrete variational calculus. The problem with the dynamic programming approach is that it is very difficult to handle backtracking alignments and deal with both horizontal and vertical curvatures at the same time. Chew, Goh, and Fwa [CGF89] proposed a numerical search method that simultaneously optimized horizontal and vertical alignment with a 3D cubic spline, and gave a smooth alignment. They used concepts from optimal control theory. This formulation does not always guarantee global optimality, because it requires a differentiable objective function that cannot incorporate discontinuous cost parameters like land acquisition cost. Akay [Aka03] developed a model for 3D alignment of forest roads and used a simulated annealing algorithm to solve it. He considered environmental requirements and safety of the drivers in his model. Cheng and Lee [CL06] proposed a heuristic approach to solve the 3D alignment of the highways. Aruga [Aru05] presented a tabu search method for optimizing 3D alignments of forest roads, and later Aruga et al. [ATSM06] used Dijkstra shortest path method, cubic splines, and tabu search to create an initial alignment, which could be used with Aruga’s original model. Jha [Jha03] employed a criteria-based decision support system for selecting highway alignments using genetic algorithms and geographic information systems (GIS) that considered environmental impacts. Jong and Schonfeld [JS03] used an evolutionary model for optimizing 3D alignment. Kim, Jha, and Son [KJS05] proposed a stepwise genetic algorithm to improve the computational efficiency and the quality of solutions. Kim et al. [KJSK07] further extended the research to incorporate bridges and tunnels in the 3D alignment. More recently, a genetic algorithm was used to solve a multi-objective optimization problem while considering the travel time, vehicle operation, accident, earthwork, land acquisition, and pavement construction costs [MJ09]. Models of the 3D alignment require a large computer memory to run, but most of the models cannot guarantee global optimality. Consequently, most researchers compute a horizontal alignment at first, then for a fixed horizontal alignment they optimize the vertical alignment.  1.2.2  Models for optimizing horizontal alignment  Modeling horizontal alignment is relatively more complex than modeling the vertical alignment, because it involves political, socioeconomic, and environmental issues. Calculus of variations, network optimization, and dynamic programming are the most popular techniques for optimizing horizontal alignments. Calculus of variations tries to find a curve that connects two points while minimizing the integral of a cost function [Wan95]. So, the type of problems that 6  1.2. Intelligent road design calculus of variations usually deals with is very similar to the horizontal alignment problem. Howard, Bramnick, and Shaw developed the Optimum Curvature Principle (OCP) [HBS68] for horizontal alignment using the ideas of calculus of variations. Shaw and Howard [SH81] proposed two integration methods, namely arc of circle algorithm and intrinsic equation procedure for applying OCP. Shaw and Howard [SH82] also applied OCP to find the horizontal alignment of an expressway. The OCP requires determining the local cost functions and needs some approximations and assumptions, but the optimal road derived by the OCP is continuous and globally optimum. Thomson and Skykes [TS88] also used this technique in transportation. Network optimization is also a very popular technique for horizontal alignment optimization. In this approach, the horizontal alignment problem is modeled as a network problem, i.e., shortest path problem, max-flow min-cut problem, min cost flow problem, etc. Then well-developed network optimization algorithms like Dijkstra’s algorithm [Dij59], Bellman-Ford algorithm [CLR01], Ford-Fulkerson Algorithm [LRFF62], etc., are used to compute the solution. Turner and Miles [TM71] developed the Generalized Computer Aid Route Selection (GCARS) system. The GCARS system has a grid network that uses a cost model matrix created by a linear combination of pavement costs and earthwork costs. The GCARS system was further improved by allowing diagonal movements of the network matrix [Tur78]. Later models that used network optimization techniques were developed by Athanassoulis and Calogero [AC73], Parker [Par77], and Trietsch [Tri87b, Tri87a]. Although the network models are simple, easy to implement, and have well-developed algorithms to solve them, the resulting solution is nonsmooth, and calculations require a large amount of computer memory to run. Dynamic programming [Bel57] is a popular optimization technique developed by Richard Bellman. Although dynamic programming is mostly used for optimizing vertical alignments, some studies like [Tri87b], [OEC73], [JSJ06] discussed the usage of dynamic programming for horizontal alignment. Similar to network models, the dynamic programming approach is simple, easy to implement, and has well-developed algorithms to solve it, but the resulting alignment is nonsmooth.  1.2.3  Models for optimizing the vertical alignment  The vertical alignment problem is a well-defined problem, which does not depend on uncontrollable factors like political issues, socioeconomic concerns, etc. As a result, this problem is studied more comprehensively than the horizontal alignment problem, and there are more existing models. To model this problem, the length of the potential road is divided into smaller units called sections. The earthwork allocation problem is the problem of finding 7  1.2. Intelligent road design an optimal schedule for moving earth between sections. Since earthwork cost is a significant variable cost in the vertical alignment problem, often vertical alignment calculations are performed in two stages. In stage one, the model seeks a feasible vertical alignment, and in stage two, earthwork operations are optimized. Thus many researchers focused just on the earthwork allocation problem. The first attempts to combine both of these stages in a single model can be found in [Bak72] and later in [Ont84]. Popular techniques to model the vertical alignment problem include numerical search, dynamic programming, linear programming, mixed integer linear programming, and quadratic programming. Numerical search Earlier models for optimizing vertical alignments used numerical search. This approach exploits a continuous search space, and most of the cost components and constraints can be modeled directly. But the resulting model becomes very complex to solve due to the non-linearity and non-convexity of the model. Hayman [Hay70] used continuous decision variables for the height at each section and employed a numerical search algorithm to find the optimal heights that satisfied all the constraints. Then straight line segments were used to connect these points to get a piecewise linear vertical alignment. Hayman’s algorithm starts with an initial guess of the solution, then seeks a feasible search direction, and continues searching in that direction for a better solution until no such solution can be found. After that it seeks another feasible search direction and repeats the procedure. Obviously, the global optimum is not guaranteed by this algorithm, and the algorithm only gives satisfactory results if the initial guess is close to the optimal solution. The Transportation and Road Research Laboratory (TRRL) in the UK developed a program named MINERVA [OEC73, Pea73] that utilizes numerical search to find an optimal vertical alignment. Unlike Hayman’s algorithm, it gives a smoother solution, since the output alignment consists of straight line segments with a parabolic curve in between. But it also depends on the initial guess, and the algorithm can be stuck at a local optima. Pearman [Pea73] suggested a procedure to find an estimate of the quality of the current solution, compared with the global optimum. Both Hayman’s algorithm and MINERVA depend on a good initial estimate of the solution. Robinson [Rob73] presented a program called VENUS that gave a feasible vertical alignment which could be used as a good initial estimate for any algorithm. VENUS starts by smoothing the ground profile that is then converted into a preliminary road profile by fitting straight lines with the use of a least square process. The alignment is further adjusted to satisfy all the design requirements, and thus a feasible vertical alignment can be found. 8  1.2. Intelligent road design Goh et al. [GCF88] presented a discrete and a continuous model for optimizing vertical alignment. In the continuous model, they first formulated the vertical alignment problem as a calculus of variations problem, which is then converted into an optimal control problem [GT88]. Their vertical alignment was approximated by a cubic spline, and the model became a general constrained non-linear optimization problem that could be solved by any known numerical search algorithm. The problem gets very complicated to solve, when earth movement costs are considered in the model. This property makes the model inapplicable for some roads. Dynamic programming Dynamic programming [Bel57] is a discrete optimization technique for a multistage decision making process developed by Richard Bellman and further improved by Bellman and Dreyfus [BD62]. The basis of the dynamic programming algorithm is the principle of optimality [Bel57]. Definition 1.4. Admissible and optimal policies. An admissible policy is a vector of decision that satisfies all the constraints. An admissible policy that minimizes the cost function is referred to as an optimal policy. Theorem 1.5. (Principle of optimality) An optimal policy has the property that whatever the initial state and initial decision are, the remaining decisions must constitute an optimal policy with regard to the state resulting from the first decision [Bel57]. Dynamic programming was first applied to the vertical alignment problem by Puy Huarte [Hua73]. He developed a two phase model, where in the first phase dynamic programming was used to generate an optimal vertical profile, but since the resulting profile is piecewise linear, the alignment is approximated by a set of cubic polynomial functions in phase two. To improve the existing roads, Murchland [Mur73] developed a program called VALOR that minimized the earthwork cost. This program uses a dynamic programming algorithm to find the optimal vertical alignment, which is represented by a quadratic spline. Goh et al. [GCF88], Fwa [Fwa89], and Goktepe et al. [GLA05] used a similar approach to optimize vertical alignment using dynamic programming. They discretized the search space by horizontal and vertical grid lines, where each of the horizontal grid lines stood for a state, and each of the vertical grid lines represented a stage in the multi-stage decision process. Intuitively, the output of this formulation gives the height along each vertical grid line, which represents a stage. 9  1.2. Intelligent road design A recent approach of optimizing vertical alignment using dynamic programming can be found in [GAA09]. In the study, the authors integrated the Weighted Ground Line Method (WGLM) of earthwork optimization with the dynamic programming model of vertical alignment. The advantage of dynamic programming is that it is very simple to implement, and there are existing well-developed algorithms to solve it. It can work with nonsmooth, nonconvex, or discontinuous objective functions. The disadvantage is that this approach gives a piecewise linear alignment rather than a smooth one and uses a discrete search space. For some formulations, dynamic programming does not give a realistic solution. In a study ([RL11]), we show that this approach is not appropriate to fulfill many requirements of the vertical alignment problem. LP, MILP and QP models Linear programming (LP) is a popular optimization technique. A linear program has a linear objective function and linear constraints in terms of the decision variables. If there exists integer decision variables in a linear program then it is called a mixed integer linear program (MILP). Quadratic programming (QP) is a special type of mathematical optimization problem that has a quadratic objective function subject to linear constraints. The idea of using linear programming for earthwork optimization was first discussed in [SN71]. Later, Mayer and Stark [MS81] developed the model that minimizes the earth moving cost while balancing the earth quantities in any section. A similar model was developed by Nandgaonkar [Nan81]. Oglesby and Hicks [OH82] used a combination of a graphical method called the mass haul diagram and linear programming for earthwork optimization. Easa [Eas88b] extended the model of Mayer and Stark [MS81] and proposed a numerical search algorithm that searches for a feasible vertical alignment while optimizing earthwork operations by linear programming as a sub-routine. Easa [Eas87, Eas88a] suggested that the unit costs for the earthwork operation are not always constant, and for linear unit costs he proposed a quadratic programming model [Eas88a] of the earthwork operation. Moreb [Mor96] modeled the vertical alignment and earthwork operation in a single linear program. Both Easa’s model [Eas88b] and Moreb’s model [Mor96] give piecewise linear alignments that require post-processing steps to smooth out the sharp connectivity resulting in a nonoptimal solution for some roads. Many researchers used polynomials to approximate the road profile to get a smooth solution. ReVelle, Whitlatch, and Wright [RWW97] developed a model that approximated the road profile with a fifth order polynomial while using a linear program to find the optimal coefficients of the polynomial. Aljohani and Moreb 10  1.2. Intelligent road design [AM03] gave a more flexible representation using polynomials of any degree. The problem with using polynomials is that it limits the number of ups and downs in the road profile depending on the degree of the polynomial, i.e., this approach will perform badly for long roads. Moreb and Aljohani [MA04] found a quadratic spline (a piecewise quadratic) representation of the road profile that minimizes earthwork cost using linear programming to avoid the shortcomings of the polynomial approach. Moreb [Mor09] improved the previous model by adding some additional constraints that ensure smoothness at the connectivity of two spline pieces and generalized the technique with a piecewise polynomial of any degree. Koch and Lucet [KL10] further improved the accuracy of the spline model by changing two constraints and reported that up to quadratic spline could be used while maintaining the linear structure of the model. This model can represent the vertical alignment problem very well, but it does not account for the physical blocks like rivers, mountains, etc., that prevent earth movement, and at the same time, the model does not consider side-slopes of the road resulting in an inaccurate model for practical use. Hare, Koch, and Lucet [HKL11] proposed a mixed integer linear programming model for earthwork optimization that considers blocks. They also proposed algorithms to speed up the computation. The issue of finding the optimal number of sections and the optimal length of each section was addressed in Ji et al. [JSB+ 10] where a mixed integer linear programming technique was proposed to solve this problem. At the same time, they proposed a minimal cost flow formulation of the earthwork problem that can be solved by standard network flow algorithms. Other models Among the other models for the vertical alignment, Goktepe et al. [GLA09] proposed a genetic algorithm based on a constrained curve-fitting method to optimize vertical alignment. In the study, they also considered soil parameters. This study also integrates the Weighted Ground Line Method (WGLM) of earthwork optimization with the genetic algorithm. Garber and Hoel [GH09] used the mass haul diagram, which is a greedy algorithm, to calculate the earthwork operations without considering blocks. It is not known whether the mass haul diagram approach is optimal or not. It can also be solved as a transshipment problem, which is a special case of the network flow problem. In our research, we extend the models of Moreb [Mor09], Koch and Lucet [KL10], and Hare, Koch, and Lucet [HKL11] to formulate the vertical alignment problem with blocks. We develop a technique to incorporate the side-slopes in the model and still formulate the model as a mixed integer linear program. We also 11  1.2. Intelligent road design propose a new model using concepts from the network flow techniques. This new model shows a significant improvement on computational speed over our previous model.  12  Chapter 2  Models for Vertical Alignment and Earthwork Optimization What is important is the gradual development of a theory, based on a careful analysis of the facts. John von Neumann (1903 - 1957) In this chapter, we present two existing models, namely the spline LP model for vertical alignment [Mor09] and the MILP model for earthwork optimization with blocks [HKL11]. These two models are the basis for our research. For this thesis, we use the notations from [HKL11] with slight modifications.  2.1  Spline LP model for vertical alignment optimization  The idea of approximating the road profile by a spline was first proposed by Moreb and Aljohani [MA04]. The process was further improved by Moreb [Mor09], followed by Koch and Lucet [KL10]. The resulting linear programming (LP) model is explained in this section.  2.1.1  Definitions and model parameters  Definition 2.1. Spline segment. A spline is a piecewise polynomial function, where each polynomial piece is called a spline segment. The model approximates the road with a spline. The spline has m spline segments, which are indexed by the set G = {1, 2, ..., m}. In [KL10], the authors show that up to a quadratic spline can be used to maintain the linearity of the model. For all g ∈ G, the equation for a quadratic spline segment is Pg (x) = ag,1 + ag,2 x + ag,3 x2 .  (2.1)  13  2.1. Spline LP model for vertical alignment optimization Definition 2.2. Section. The length of a spline segment is further divided into smaller units called sections. The g th spline segment (g ∈ G) has ng sections. So, n = g∈G ng is the total number of sections. We index these by the set S = {1, 2, ..., n}. The volume of earth moved from section i to section j is denoted by xij . Definition 2.3. For all g ∈ G, the set Sg = {1, 2, ..., ng } contains the indexes of sections for a segment g, and κ : (G, Sg ) → S  (2.2)  maps the section index of a spline segment to the actual section index. The starting point of the ith section of the g th spline segment is denoted by sg,i , and the end point is denoted by sg,i+1 . Remark 2.4. For all g ∈ G\{m}, sg,ng +1 = sg+1,1 by definition. Definition 2.5. Cut and fill. A section is called a cut (respectively fill), if the volume difference between the ground profile and the road profile at the section is positive (respectively negative). The volume of any section i is represented by Vi = Vi+ − Vi− , where Vi+ ≥ 0 is the cut volume, and Vi− ≥ 0 is the fill volume. Remark 2.6. For any section i, one of Vi+ and Vi− must be zero. A cut has Vi− = 0, Vi+ = 0 making Vi = Vi+ > 0 and a fill has Vi+ = 0, Vi− = 0 making Vi = −Vi− < 0. If a section is neither a cut nor a fill then both Vi+ and Vi− are zero. Definition 2.7. Borrow and waste pits. Borrow pits are external sections from which earth can be borrowed, and waste pits are external sections to which earth can be dumped for additional cost. Remark 2.8. A borrow pit is always a cut, and a waste pit is always a fill. There are nb borrow pits, which are indexed by the set B = {n+1, n+2, ..., n+ nb } and nw waste pits, which are indexed by the set W = {n + nb + 1, n + nb + 2, ..., n + nb + nw }. The index set N = S ∪ B ∪ W = {1, 2, ..., n + nb + nw } is defined to be the set of all the sections, borrow pits, and waste pits indexes. Also ϑ:B→S  (2.3)  maps the borrow pit index to the section index to which it is attached, and ϕ:W→S  (2.4) 14  2.1. Spline LP model for vertical alignment optimization maps the waste pit index to the section index to which it is attached. The distance from a borrow or waste pit to the associated section is called the dead haul distance and is denoted by d˜i where i ∈ B ∪ W. The capacity of the ith borrow pit (respectively waste pit) is denoted by Cib (respectively Ciw ). i Definition 2.9. For each i ∈ N , the index set N→ that xij is a permitted move,  j ∈ S ∪ W, j = i  i j: j∈S N→ =  ∅  consists of all indexes j such  if i ∈ S  if i ∈ B ,  if i ∈ W  (2.5)  i consists of all indexes j such that x is a permitted move, and the index set N← ji   j ∈ S ∪ B, j = i if i ∈ S   i j: j∈S if i ∈ W N← = . (2.6)   ∅ if i ∈ B i if, and only if, i ∈ N j . Proposition 2.10. For any i, j ∈ N , j ∈ N→ ← i and N j , i can either be a section or a borrow pit, and Proof. By definition of N→ ← j can either be a section or a waste pit. Since movement from borrow pit to waste pit is not allowed we need to consider the following cases. i . Since i, j ∈ S and Case I (i is a section and j is a section): Assume, j ∈ N→ i = j,  j ∈ (S − {i}), ⇒ i ∈ (S − {j}), ⇒ i ∈ (S ∪ B) − {j}, j ⇒ i ∈ N← . j . Since i, j ∈ S, Now assume, i ∈ N←  i ∈ (S − {j}), ⇒ j ∈ (S − {i}), ⇒ j ∈ (S ∪ W) − {i}, i ⇒ j ∈ N→ . i . So, i ∈ S and Case II (i is a section and j is a waste pit): Assume, j ∈ N→ j by the definition of N j . Now assume, i ∈ N j . Since j ∈ W implies i ∈ N← ← ←  15  2.1. Spline LP model for vertical alignment optimization i ∈ S and j ∈ W, i ∈ (S − {j}), ⇒ j ∈ (S − {i}), ⇒ j ∈ (S ∪ W) − {i}, i ⇒ j ∈ N→ . i . Since i ∈ B Case III (i is a borrow pit and j is a section): Assume, j ∈ N→ and j ∈ S,  j ∈ (S − {i}), ⇒ i ∈ (S − {j}), ⇒ i ∈ (S ∪ B) − {j}, j ⇒ i ∈ N← . j . So, i ∈ B and j ∈ S implies j ∈ N i by the definition of Now assume, i ∈ N← → i N→ .  Definition 2.11. The set N 2 consists of all pairs of indexes (i, j) such that xij is a permitted move, i.e., N2 = =  i j , (i, j) : j ∈ N→ , i ∈ N← i (i, j) : j ∈ N→ , [By Proposition 2.10].  (2.7)  Proposition 2.12. N 2 ⊆ N × N . Proof. Definition 2.9 and 2.11 complete the proof. Cost components Definition 2.13. Excavation, hauling, and embankment cost. The cost for cutting earth from a section is called the excavation cost, the cost for moving earth from one section to another section is called the hauling cost, and the cost for filling a section with earth is called the embankment cost. For any i ∈ N , the per unit volume excavation cost is represented by pi , the per unit volume embankment cost is represented by qi , and cij represents the per unit volume hauling cost from section i to section j. If the constant cost c represents  16  2.1. Spline LP model for vertical alignment optimization the cost for moving one unit of volume of earth by one unit distance, and dij is the distance between section i and section j then cij = cdij , where   distance between i and j dij = dϑ(i)j + d˜i   diϕ(j) + d˜j  if i, j ∈ S if i ∈ B and j ∈ S if i ∈ S and j ∈ W.  (2.8)  It should be noted that the model will work with a more sophisticated cost function. For the details of the cost function, we refer to [Koc10]. Decision variables The decision variables represent the output of the optimization procedure. The decision variables for the problem are – Vi+ (for all i ∈ S): the volume of the earth excavated from any section, – Vi− (for all i ∈ S): the volume of earth embanked to any section, – xij (for all (i, j) ∈ N 2 ): the volume of earth moved from one section to another, – ag,k (for all g ∈ G, k ∈ {1, 2, 3}): the coefficient of the quadratic polynomials, – ui (for all i ∈ S): the difference in height between the ground profile and the road profile for any section. Design parameters The design parameters represent the input of the optimization procedure, which will be provided by the end-user. The design parameters for the problem are – m: the number of spline segments, – ng (for all g ∈ G): the number of sections per spline segment, – sg,i (for all g ∈ G, i ∈ Sg ): the start and end points of the sections, – hg,i (for all g ∈ G, i ∈ Sg ): the average height of the ground for each section, – ui and ui (for all i ∈ S): the upper and the lower bound of the variable ui , – Ai (for all i ∈ S): the area of each section, 17  2.1. Spline LP model for vertical alignment optimization – L (respectively U ): the lower (respectively upper) bound of the slope, – HA (respectively HB ): the starting (respectively ending) elevation, – HA (respectively HB ): the starting (respectively ending) slope, – pi , qj , and cij (for all i ∈ S ∪ B, j ∈ S ∪ W): excavation, embankment, and hauling costs, and – the locations of the borrow and waste pits.  2.1.2  Objective and constraints  Using the definitions and model parameters explained in Section 2.1.1, we formulate the model of [Mor09] with modifications from [KL10]. Objective function  pi Vi+ + qi Vi− +  min i∈S  pi xij + i i∈B j∈N→  qi xji + i i∈W j∈N←  cij xij . (i,j)∈N 2  (2.9a) Balance constraints  xij = Vi+ ,  for all i ∈ S, (2.9b)  xji = Vi− ,  for all i ∈ S. (2.9c)  i j∈N→  i j∈N←  Pit constraints  xij ≤ Cib ,  for all i ∈ B, (2.9d)  xji ≤ Ciw ,  for all i ∈ W. (2.9e)  i j∈N→  i j∈N←  18  2.1. Spline LP model for vertical alignment optimization Volume constraints  Vi+ − Vi− = Ai ui ,  for all i ∈ S. (2.9f)  Gap constraints  hg,i − ag,3  sg,i+1 + sg,i (sg,i+1 )2 + sg,i+1 sg,i + (sg,i )2 − ag,2 − ag,1 = uκ(g,i) , 3 2 for all g ∈ G, i ∈ Sg . (2.9g)  Slope constraints  L ≤ ag,2 + 2ag,3 sg,i ≤ U ,  for all g ∈ G, i ∈ {1, ng }. (2.9h)  Smoothness constraints  ag,1 + ag,2 sg,1 + ag,3 s2g,1 = a(g−1),1 + a(g−1),2 sg,1 + a(g−1),3 s2g,1 , for all g ∈ G\{1}, (2.9i)  ag,2 + 2ag,3 sg,1 = a(g−1),2 + 2a(g−1),3 sg,1 ,  for all g ∈ G\{1}. (2.9j)  Fixed point constraints a1,1 + a1,2 s1,1 + a1,3 s21,1 = HA ,  (2.9k)  am,1 + am,2 sm,nm + am,3 s2m,nm = HB ,  (2.9l)  a1,2 + 2a1,3 s1,1 = HA ,  (2.9m)  am,2 + 2am,3 sm,nm = HB .  (2.9n)  19  2.1. Spline LP model for vertical alignment optimization Bounds  xij ≥ 0,  for all (i, j) ∈ N 2 ,  (2.9o)  Vi+ Vi−  ≥ 0,  for all i ∈ S,  (2.9p)  ≥ 0,  for all i ∈ S,  (2.9q)  ui ≤ ui ≤ ui ,  for all i ∈ S,  (2.9r)  ag,k ∈ R,  for all g ∈ G, k ∈ {1, 2, 3}. (2.9s)  2.1.3  Model discussion  The objective function, represented by Equation (2.9a), minimizes the total of excavation, embankment, and hauling costs. The balance constraints, represented by Equations (2.9b) and (2.9c), ensure that the total volume moved from a section is equal to the volume excavated from that section, and the total volume moved to a section equals to the volume embanked to that section. The pit constraints, represented by Equations (2.9d) and (2.9e), enforce the excavated volume or embanked volume of a borrow or waste pit to be within its capacity. The volume constraints, represented by Equation (2.9f), force the total volume excavated from or embanked to a section to be equal to the volume difference between ground profile and road profile of that section. Equation (2.9f) also implies that ui > 0 for a cut, ui < 0 for a fill, and ui = 0 for a section that is neither cut nor fill. Proposition 2.14. Remark 2.6 holds at the optimal solution. Proof. For eventual contradiction, assume that there exists a section i such that Vi+ = δ + and Vi− = δ − in the optimal solution, where δ + > 0 and δ − > 0. If δ + ≥ δ − (respectively δ + < δ − ) , then Vi+ = δ + − δ − and Vi− = 0 (respectively Vi+ = 0 and Vi− = δ − − δ + ) give the same ui for Equation (2.9f) with a lower objective value. For any section i, ui is defined to be the difference between the average height of the ground and the height of the potential road at that section. This definition was written as the gap constraints in [Mor09]. For all g ∈ G, i ∈ Sg , the gap constraints are hg,i − Pg  sg,i+1 + sg,i 2  = uκ(g,i) .  (2.10) 20  2.1. Spline LP model for vertical alignment optimization Equation (2.10) checks the gap at the middle point of a section, which is a source of inaccuracy. The gap constraints were improved in [KL10] by considering area gap instead of the height gap. For all g ∈ G, i ∈ Sg , the improved gap constraints are ˆ sg,i+1 ˆ sg,i+1 ˆ sg,i+1 hg,i dx − Pg (x)dx = uκ(g,i) dx, (2.11) sg,i  sg,i  sg,i  resulting in hg,i (sg,i+1 − sg,i ) − ag,3  (sg,i+1 )3 − (sg,i )3 (sg,i+1 )2 − (sg,i )2 − ag,2 3 2 − ag,1 (sg,i+1 − sg,i ) = uκ(g,i) (sg,i+1 − sg,i ). (2.12)  Equation (2.9g) is a simplification of Equation (2.12). The slope constraints imply that the slope of the spline segments must be bounded. The slope of the polynomial Pg (x) is calculated as Pg (x) = ag,2 + 2ag,3 x.  (2.13)  It should be noted that the lower (L) and the upper (U ) bounds of the slope are calculated from the curvature requirements and maximum gradient constraints of the vertical alignment design specifications. Since the spline segments are quadratic, the slope of each segment is linear. The maximum and the minimum of a linear function occurs at the boundary points. So, checking the slope constraint at the beginning point and the end point of each segment is sufficient. Smoothness constraints enforce the spline segments to be continuous (by Equation (2.9i)) and differentiable (by Equation (2.9j)) at their joining points. Equations (2.9i) and (2.9j) are also known as the C 0 and C 1 continuity constraints respectively. The fixed point constraints fix the starting and ending elevations (by Equations (2.9k) and (2.9l)) as well as the starting and ending slope (by Equations (2.9m) and (2.9n)). Equations (2.9o) to (2.9s) state the bounds of the decision variables. Proposition 2.15. (Model size) The LP has O(n2 ) continuous variables and O(n) constraints. Proof. The total number of continuous variables is 2n + nb + nw + n2 + nb n + nw n + 3m + n ≤ 8n + 3n2 since n ≥ nb , n ≥ nw , and n ≥ m. Each of the Equations from (2.9b) to (2.9g) creates O(n) constraints. Slope, Continuity, and Endpoint constraints are O(m) in number. The total number of constraints is O(n), since n ≥ m. 21  2.1. Spline LP model for vertical alignment optimization Example 2.16. We optimize the vertical alignment for a 100m long hypothetical road with no borrow or waste pits. The length of each section is 25m, and the road width is 3.5m. The cost components and design parameters are – excavation cost: $3.13 per unit volume, – embankment cost: $7.05 per unit volume, – hauling cost: $0.008 per unit volume per unit distance, – bounds for slope change: L = −0.5, U = 0.5, – start and end elevations: HA = 22m, HB = 18m, – station points: s1,1 = 0m, s1,2 = 50m, s2,1 = 50m, s2,2 = 100m, and – height of the ground for each section: h1,1 = 20m, h1,2 = 25m, h2,1 = 16m, h2,2 = 9m. The resulting LP is as follows. min 3.13V1+ + 3.13V2+ + 3.13V3+ + 3.13V4+ + 7.05V1− + 7.05V2− +7.05V3− + 7.05V4− + 0.02x12 + 0.04x13 + 0.06x14 + 0.02x21 +0.02x23 + 0.04x24 + 0.04x31 + 0.02x32 + 0.02x34 + 0.06x41 +0.04x42 + 0.02x43 , s.t.  x12 + x13 + x14 = V1+ , x21 + x23 + x24 = V2+ , x31 + x32 + x34 = V3+ , x41 + x42 + x43 = V4+ , x21 + x31 + x41 = V1− , x12 + x32 + x42 = V2− , x13 + x23 + x43 = V3− , x14 + x24 + x34 = V4− , V1+ − V1− = 87.5u1 , V2+ − V2− = 87.5u2 , V3+ − V3− = 87.5u3 , V4+ − V4− = 87.5u4 , 20 − a11 − 12.5a12 − 208.333a13 = u1 , 25 − a11 − 37.5a12 − 1458.333a13 = u2 , 16 − a21 − 62.5a22 − 3958.333a23 = u3 , 9 − a21 − 87.5a22 − 7708.333a23 = u4 , −0.5 ≤ a12 ≤ 0.5, −0.5 ≤ a12 + 100a13 ≤ 0.5, −0.5 ≤ a22 + 100a23 ≤ 0.5, −0.5 ≤ a22 + 200a23 ≤ 0.5, a21 + 100a22 + 10000a23 = 18, a11 = 22, a11 + 50a12 + 2500a13 = a21 + 50a22 + 2500a23 , a12 + 100a13 = a22 + 100a23 , −10 ≤ u1 , u2 , u3 , u4 ≤ 10 V1+ , V2+ , V3+ , V4+ , V1− , V2− , V3− , V4− ≥ 0 .  The LP has 27 variables and 36 constraints. The output is shown in Figure 2.1. 22  2.1. Spline LP model for vertical alignment optimization  35 Ground Profile Road Profile (Segment 1) Road Profile (Segment 2)  30  Elevation  25 20 15 10 5 0 0  25  50  75  100  Station  (a) Ground profile and road profile.  Before:  Section 1 278.906m3  After:  Section 1  Section 2  Section 3  131.25m3 Section 2  Section 3  Section 4 278.906m3 Section 4  (b) Earth movement between the sections.  Figure 2.1: Optimized vertical alignment for a hypothetical road example  23  2.2. MILP model for earthwork optimization with blocks  2.2  MILP model for earthwork optimization with blocks  The mixed integer linear programming (MILP) model for earthwork optimization with blocks was proposed by Hare, Koch, and Lucet [HKL11]. In this model, the earthwork operations are optimized for a predetermined vertical alignment. The output is the optimal schedule for moving earth among the sections.  2.2.1  Definitions and model parameters  In this section, we discuss the definitions and model parameters of this model. Remark 2.17. Borrow and waste pits are necessary to ensure feasible solutions exist [Koc10, HKL11] (except for the unlikely case where the sum of the volume difference between ground profile and road profile of the cut sections is equal to that of the fill sections). For vertical alignment calculation, borrow pits and waste pits are introduced to give more flexibility to the solution, whereas for earthwork optimization without them it is very unlikely a feasible solution exists. Definition 2.18. Block. A block is an obstacle that needs to be dealt with before any earth can be moved over the location [Koc10, HKL11]. There are nz blocks, which are indexed by the set I = {1, 2, ..., nz } and ς:I→S  (2.14)  maps the block index to the section index. The process is discretized into time-steps to deal with blocks. The set T contains the indexes of the time-steps, and the binary variable ykt represents whether a block k ∈ I is removed at time-step t (ykt = 1) or not (ykt = 0). It is ensured that at each time-step at least one block will be removed, i.e., the number of timesteps will be at most nz + 1. It should be noted that the introduction of the binary variables ykt , makes the model a mixed integer linear program. Definition 2.19. Access roads. An access road is defined as a road that gives access for earthwork to occur to any section to which it is attached. The index set R = {1, 2, ..., nr } contains the indexes of the access roads and :R→S  (2.15)  maps the access road index to the section index. Assumption 2.20. There is a borrow pit and a waste pit attached with each access road with infinite capacity. 24  2.2. MILP model for earthwork optimization with blocks Remark 2.21. Assumption 2.20 is reasonable in a sense that an access road can be used to borrow earth from or dump earth to anywhere in the world. For all k ∈ I, the set Nbk consists of all the pairs (i, j) such that the block k is in between the sections i and j, Nbk = {(i, j) : i ≤ ς(k) ≤ j, i ∈ N , j ∈ N , i = j},  (2.16)  the set Nbk1 ,k2 consists of all indexes i such that the section i is in between the blocks k1 and k2 , Nbk1 ,k2 = {i ∈ N : ς(k1 ) ≤ i ≤ ς(k2 )},  (2.17)  the set Nb←,k consists of all indexes i such that the section i comes before block k, Nb←,k = {i ∈ N : i ≤ ς(k)},  (2.18)  and the set Nbk,→ consists of all indexes i such that the section i comes after block k, Nbk,→ = {i ∈ N : i ≥ ς(k)}. (2.19) The set I consists of pairs (k1 , k2 ) such that there is no access road in between the blocks k1 and k2 , I = {(k1 , k2 ) : k1 , k2 ∈ I, r ∈ R, ς(k1 ) ≤ ς(k2 ), ( (r) < ς(k1 ) or ς(k2 ) > (r))}, (2.20) the set I → consists of blocks that have no access road after them, I → = {k ∈ I : (r) < ς(k), r ∈ R},  (2.21)  and the set I ← consists of blocks that have no access road before them, I ← = {k ∈ I : ς(k) > (r), r ∈ R}.  (2.22)  Finally, we define M to be the maximum of total cut volume and total fill volume, Vi− }.  Vi+ ,  M = max{ i∈S  (2.23)  i∈S  We also use some definitions and model parameters from Section 2.1.1. The earth movement variables xij are changed in this model with an additional index for time-step.  25  2.2. MILP model for earthwork optimization with blocks – The total number of section is n, which are indexed by the set S = {1, 2, ..., n}. The volume of earth moved from section i to section j at time-step t is denoted by xijt . The cut and fill volume of a section i are denoted by Vi+ and Vi− respectively. – There are nb borrow pits, which are indexed by the set B = {n + 1, n + 2, ..., n + nb }, nw waste pits, which are indexed by the set W = {n + nb + 1, n + nb + 2, ..., n + nb + nw }, ϑ:B→S  (2.24)  maps the borrow pit index to the section index to which it is attached, ϕ:W→S  (2.25)  maps the waste pit index to the section index to which it is attached. The dead haul distance of the ith borrow or waste pit is denoted by d˜i , the capacity of the ith borrow pit (respectively waste pit) is denoted by Cib (respectively Ciw ), and the set of all the sections, borrow pits, and waste pits indexes is denoted by N = S ∪ B ∪ W = {1, 2, ..., n + nb + nw }. Cost components Cost components for this model are identical to the previous model. Decision variables The decision variables are – xijt (for all (i, j) ∈ N 2 , t ∈ T ): the volume of earth moved from one section to another at a particular time step, – ykt (for all t ∈ T , k ∈ I): the block removal indicators. Design parameters The design parameters for the MILP are – n: the number of sections, – nz : the number of blocks, – Vi+ (for all i ∈ S ∪ B): the volume of earth excavated from any section, 26  2.2. MILP model for earthwork optimization with blocks – Vi− (for all i ∈ S ∪ W): the volume of earth embanked to any section, s+ i  –  (respectively section,  s− i ):  the stockpiling tolerance of a cut (respectively fill)  – pi , qj , and cij (for all i ∈ S ∪ B, j ∈ S ∪ W): excavation, embankment, and hauling costs, and – the locations of the borrow pits, waste pits, blocks, and access roads.  2.2.2  Objective and constraints  Objective function  pi Vi+ + qi Vi− +  min  pi xijt i∈B  i∈S  +  i j∈N→  t∈T  qi xjit + i t∈T i∈W j∈N←  cij xijt .  (2.26a)  (i,j)∈N 2 t∈T  Balance constraints  xijt = Vi+ ,  for all i ∈ S, (2.26b)  xjit = Vi− ,  for all i ∈ S. (2.26c)  i t∈T j∈N→  t∈T  i j∈N←  Pit constraints  xijt ≤ Cib ,  for all i ∈ B, (2.26d)  xjit ≤ Ciw ,  for all i ∈ W. (2.26e)  i t∈T j∈N→  i t∈T j∈N←  Volume constraints  Vi+ − Vi− = Vi ,  for all i ∈ S. (2.26f) 27  2.2. MILP model for earthwork optimization with blocks Stockpiling constraints u  u  xijt − i t=1 j∈N→  xjit ≤ Vi +  s+ i ,  i t=1 j∈N←  for all i ∈ S, u ∈ T \{nz + 1}, Vi ≥ 0, (2.26g) u  u  xijt − i t=1 j∈N→  xjit ≥ Vi −  s− i ,  i t=1 j∈N←  for all i ∈ S, u ∈ T \{nz + 1}, Vi < 0. (2.26h) Block constraints  xijt ≤ M ykt ,  for all t ∈ T , k ∈ I, (i, j) ∈ N k ,  xijt ≤ M yk1 t + M yk2 t ,  for all t ∈ T , (k1 , k2 ) ∈ I, (i, j) ∈ N k1 ,k2 , (2.26j)  u  (2.26i)  u  xς(k)jt − t=0 j∈N ς(k) →  xjς(k)t ≥ yku Vς(k) , t=0 j∈N ς(k) ←  for all k ∈ I, u ∈ T , Vς(k) ≥ 0, (2.26k) u  u  xς(k)jt − t=0  ς(k) j∈N→  xjς(k)t ≤ yku Vς(k) , t=0  ς(k) j∈N←  for all k ∈ I, u ∈ T , Vς(k) < 0, (2.26l)  ykt ≥ t,  for all t ∈ T \{nz + 1},  (2.26m)  k∈I  yk,(t+1) ≥ yk,t ,  for all k ∈ I, t ∈ T \{nz + 1}. (2.26n) 28  2.2. MILP model for earthwork optimization with blocks Bounds  xijt ≥ 0,  for all (i, j) ∈ N 2 , t ∈ T , (2.26o)  ykt ∈ {0, 1}.  for all k ∈ I, t ∈ T ,  2.2.3  (2.26p)  Model discussion  In the objective function, represented by Equation (2.26a), the sum of the excavation, embankment, and hauling cost is minimized. The balance constraints, represented by Equations (2.26b) and (2.26c), and the pit constraints, represented by Equations (2.26d) and (2.26e), have the additional sum over the time-steps. Unlike the vertical alignment model, the right-hand side of the equation representing the volume constraints (2.26f) for the earthwork model is a constant, i.e., the total volume of a section is predetermined. Introducing time-steps to the earthwork model generates an interesting phenomenon. In the intermediate time-steps temporary stockpiling of earth in different sections occurs. If the stockpiling is not controlled, then temporary blocks may be created. Stockpiling constraints, represented by Equations (2.26h) and (2.26h), are introduced to deal with this phenomenon. These constraints allow a cut section s− to store an excess of s+ i volume and a fill section to excavate an excess of i volume. If there is a block between two sections then no earth movement is allowed between those sections until the block is removed, which is ensured by Equation (2.26i). No earth movement is allowed among sections that are in between two blocks without an access road until one of the blocks is removed, which is enforced by Equation (2.26j). Constraints (2.26k) and (2.26l) ensure that when the required amount of earth is cut or filled for any section with a block, then the block is considered removed for that section. These constraints are also called the block removal indicators. Constraints (2.26m) certify that at least one block will be removed at each time-step. After a block is removed at any time-step, it must stay removed at all the later time-steps. These redundant constraints are enforced by Equation (2.26n). Equations (2.26o) to (2.26p) state the bounds for the decision variables. Proposition 2.22. (Sufficient conditions for feasibility without blocks) Assume Vs = + − + − i∈S (Vi − Vi ), Vb = i∈B Vi , and Vw = i∈W Vi . If there are no blocks, Vw − Vs ≥ 0, and Vb + Vs ≥ 0, then the MILP always has a solution.  29  2.2. MILP model for earthwork optimization with blocks Proof. Since the conditions imply that the waste pits and the borrow pits provide sufficient slack, the MILP is always feasible with no blocks. Proposition 2.23. (Sufficient conditions for feasibility with blocks) Assume Vs = + − i∈S (Vi − Vi ). If there exists an access road with a borrow pit having volume Vb and waste pit having volume Vw such that Vw − Vs ≥ 0 and Vb + Vs ≥ 0 holds, then the MILP always has a solution. Proof. A feasible solution is to remove the blocks sequentially by borrow and waste pits attached with the access roads. Then by Proposition 2.22, the MILP is always feasible. Corollary 2.24. If there is at least one access road, then Assumption 2.20 ensures that the MILP always has a solution. Proposition 2.25. (Model size) The MILP has O(n2 nz ) continuous variables, O(n2z ) binary variables, and O(n2 nz ) constraints. Proof. The total number of continuous variables is (n2 + nb n + nw n)(nz + 1) ≤ 3n2 × 2nz , since n > nb and n > nw . The total number of binary variables is nz (nz + 1) ≤ 2n2z . Equations (2.26b), (2.26c), (2.26d), (2.26e), and (2.26f) create 3n + nb + nw = O(n) constraints. Equations (2.26g) and (2.26h) create nz n = O(nz n) stockpiling constraints. Equations (2.26i) and (2.26j) create O(n2 nz ), Equations (2.26k) and (2.26l) create O(n2z ), Equation (2.26m) creates O(nz ), and Equation (2.26m) creates O(n2z ) block constraints. The total number of constraints is O(n2 nz ). Example 2.26. We add a block in Section 3 and an access road in Section 1 to the vertical alignment calculated in Example 2.16. Then we solve the earthwork optimization. The output is shown in Figure 2.2.  30  2.2. MILP model for earthwork optimization with blocks  Before:  Section 1  Section 2  Section 3  Section 4  278.906m3 After (t = 1):  Section 1  Section 2  Section 3  Section 4  410.156m3 After (t = 2):  Section 1  Section 2  Section 3  Section 4  Figure 2.2: Optimized earthwork schedule for a hypothetical road example (with blocks).  31  Chapter 3  A Basic MILP Model for Vertical Alignment Considering Blocks and Side-slopes1 If I were again beginning my studies, I would follow the advice of Plato and start with mathematics. Galileo Galilei (1564 - 1642) The spline LP model presented in Section 2.1.2 is an improvement over other models of vertical alignment, because it approximates the road profile with a piecewise polynomial and thus results in a smoother solution. But the model does not consider blocks or side-slopes of the road. The MILP model described in Section 2.2.2 considers blocks, but it only optimizes earthwork for a predetermined vertical alignment. The structure of this model leads to automatic stockpiling or roadside stockpiling. Although roadside stockpiling has theoretical significance, in practice the engineers want to avoid it as much as possible. The model also assumes that the cost for stockpiling is the same as the cost for embankment, which is not true since stockpiling cost is less. Incorporating this in the model, makes it more complex, and since that scenario occurs rarely in practice, the model introduced in this chapter will assume that no roadside stockpiling occurs. We leave the inclusion of roadside stockpiling for future research. The most common form of stockpiling is called pit stockpiling, which uses borrow and waste pits for stockpiling. This feature can be easily incorporated by changing only the input of the model. In this chapter, we will combine the spline LP model for vertical alignment optimization and the MILP model for earthwork optimization with blocks to describe a spline MILP model for vertical alignment that considers blocks. For this model, we assume that only pit stockpiling occurs, and we add additional constraints to 1 A preliminary patent application was filed in Canada for part of the contents of the current chapter.  32  3.1. Definitions and model parameters prevent roadside stockpiling. We further extend the model to incorporate sideslopes.  3.1  Definitions and model parameters  For this model, we use the definitions and model parameters from Sections 2.1.1 and 2.2.1 that are described briefly in this section with some additional definitions. – The quadratic spline that represents the road profile has m segments, which are indexed by the set G = {1, 2, ..., m}. For all g ∈ G the equation for each segment is Pg (x) = ag,1 + ag,2 x + ag,3 x2 . (3.1) – The g th spline segment has ng sections, which are indexed by the set Sg = {1, 2, ..., ng }, n = g∈G ng is the total number of sections, which are indexed by the set S = {1, 2, ..., n}, κ : (G, Sg ) → S  (3.2)  maps the section index of a spline segment to the actual section index. The volume of earth moved from section i to section j at time-step t is denoted by xijt , the starting point of the ith section of the g th spline segment is denoted by sg,i , and the end point is denoted by sg,i+1 . The cut and fill volume of a section i are denoted by Vi+ and Vi− respectively. – There are nb borrow pits, which are indexed by the set B = {n + 1, n + 2, ..., n + nb }, nw waste pits, which are indexed by the set W = {n + nb + 1, n + nb + 2, ..., n + nb + nw }, ϑ:B→S  (3.3)  maps the borrow pit index to the section index to which it is attached, ϕ:W→S  (3.4)  maps the waste pit index to the section index to which it is attached. The dead haul distance of the ith borrow or waste pit is denoted by d˜i , the capacity of the ith borrow pit (respectively waste pit) is denoted by Cib (respectively Ciw ), and the set of all the sections, borrow pits, and waste pits indexes is denoted by N = S ∪ B ∪ W = {1, 2, ..., n + nb + nw }. 33  3.1. Definitions and model parameters i consists of all indexes j such that x – For each i ∈ N , the index set N→ ijt is i a permitted move, the index set N← consists of all indexes j such that xjit is a permitted move, and the set N 2 consists of all pair of indexes (i, j) such that xijt is a permitted move for all t ∈ T . The set H consists of the fixed points Hg,i for the ith section of segment g.  – There are nz blocks, which are indexed by the set I = {1, 2, ..., nz }, nr access roads, which are indexed by the set R = {1, 2, ..., nr }, ς:I→S  (3.5)  maps the block index to the section index, :R→S  (3.6)  maps the access road index to the section index. The set T contains the indexes of the time-steps, and the binary variable ykt is the block removal indicator for block k at time-step t. At each time step at least one block will be removed, i.e., the number of time steps will be at most nz +1. Assumption 2.20 states that there is a borrow pit and a waste pit attached with each access road with infinite capacity. – For all k ∈ I, the set Nbk consists of all the pairs (i, j) such that the block k is in between the sections i and j, the set Nbk1 ,k2 consists of all the indexes i such that the section i is in between the blocks k1 and k2 , the set Nb←,k consists of all the indexes i such that the section i is before block k, the set Nbk,→ consists of all the indexes i such that the section i is after block k, the set I consists of all the pairs (k1 , k2 ) such that there is no access road in between the blocks k1 and k2 , the set I → consists of blocks that have no access road after them, and the set I ← consists of blocks that have no access road before them.  3.1.1  Cost components  For this model, we will use the cost components from Section 2.1.1 that are described briefly in this section. – For a section i, the per unit volume excavation cost is pi , and the per unit volume embankment cost is qi . – The per unit volume hauling cost from section i to section j is cij = cdij , where c represents the cost of moving one unit volume of earth by one unit 34  3.1. Definitions and model parameters distance, and   distance between i and j dij = dϑ(i)j + d˜i   diϕ(j) + d˜j  3.1.2  if i, j ∈ S if i ∈ B and j ∈ S if i ∈ S and j ∈ W.  (3.7)  Decision variables  The decision variables are – Vi+ (for all i ∈ S): the volume of earth excavated from any section, – Vi− (for all i ∈ S): the volume of earth embanked to any section, – xijt (for all (i, j) ∈ N 2 , t ∈ T ): the volume of earth moved from one section to another at a particular time step, – ag,k (for all g ∈ G, k ∈ {1, 2, 3}): the coefficient of the quadratic polynomials, – ui (for all i ∈ S): the height difference of the ground profile from the road profile for any section, – ykt (for all t ∈ T , k ∈ I): the block removal indicators, – bi (for all i ∈ S): binary variables to ensure that no roadside stockpiling occurs.  3.1.3  Design parameters  The design parameters for the MILP are – m: the number of spline segments, – ng (for all g ∈ G): the number of sections per spline segment, – sg,i (for all g ∈ G, i ∈ Sg ): the start and end points of the sections, – hg,i (for all g ∈ G, i ∈ Sg ): the average height of the ground for each section, – ui and ui (for all i ∈ S): the upper and lower bound of the variable ui , – Ai (for all i ∈ S): the area of each section, – L (respectively U ): the lower (respectively upper) bound of the slope, 35  3.2. Model description – HA (respectively HB ): the starting (respectively ending) elevation, – HA (respectively HB ): the starting (respectively ending) slope, – Hg,i ∈ H: the fixed points, – nz : the number of blocks, – Aki a ,Bikb (for all i ∈ S, ka ∈ {1, 2, ..., ki+ }, kb ∈ {1, 2, ..., ki− }): area list for side-slope approximation, – pi , qj , and cij (for all i ∈ S ∪ B, j ∈ S ∪ W): excavation, embankment, and hauling costs, and – the locations of the borrow pits, the waste pits, the blocks, and the access roads.  3.2  Model description  3.2.1  The objective function  The objective of this problem is to find the vertical alignment while minimizing the total excavation cost, embankment cost, and hauling cost. So, the objective function can be written as the following, pi Vi+ + qi Vi− +  min  pi xijt i t∈T i∈B j∈N→  i∈S  +  qi xjit + i t∈T i∈W j∈N←  3.2.2  cij xijt .  (3.8)  (i,j)∈N 2 t∈T  Balance constraints  The cut balance constraints ensure that for all sections the total volume moved from a section in all time-steps must be equal to the volume excavated from that section, for all i ∈ S, xijt = Vi+ .  (3.9a)  i t∈T j∈N→  36  3.2. Model description The fill balance constraints ensures that for all sections the total volume moved to a section in all time-steps must be equal to the volume embanked to that section, for all i ∈ S, xjit = Vi− . t∈T  3.2.3  (3.9b)  i j∈N←  Pit constraints  The borrow pit constraints ensure that the total excavated volume from a borrow pit does not exceed its limit. So, for all i ∈ B, xijt ≤ Cib .  (3.10)  i t∈T j∈N→  Similarly, the waste pit constraints ensure that the total dumped volume to a waste pit does not exceed its capacity. So, for all i ∈ W, xjit ≤ Ciw . t∈T  3.2.4  (3.11)  i j∈N←  Block constraints  If there is a block between two sections then no earth movement is allowed among those two sections until the block is removed. So, for all t ∈ T \{1}, k ∈ I, and (i, j) ∈ Nbk we have, xijt ≤ M yk,t−1 .  (3.12a)  Also, no earth movement is allowed among sections that are in between two blocks without an access road until one of the blocks is removed. So, for all t ∈ T \{1}, (k1 , k2 ) ∈ I 2 , and i, j ∈ Nbk1 ,k2 we have, xijt ≤ M yk1 ,t−1 + M yk2 ,t−1 .  (3.12b)  If there is no access road before any block then no earth movement is allowed among sections before that block until the block is removed. So, for all t ∈ T \{1}, k ∈ I ← , and i, j ∈ Nb←,k we have, xijt ≤ M yk,t−1 .  (3.12c)  37  3.2. Model description If there is no access road after any block then no earth movement is allowed among sections after that block until the block is removed. So, for all t ∈ T \{1}, k ∈ I → , and i, j ∈ Nbk,→ we have, xijt ≤ M yk,t−1 . (3.12d) The difficulty of combining models of Sections 2.1.2 and 2.2.2 appears in constraints (2.26k) and (2.26l). Both yku and Vς(k) (for all k ∈ I, u ∈ T ) are decision variables in the vertical alignment problem with blocks, so constraints (2.26k) and (2.26l) become quadratic with respect to the decision variables, i.e., the model is no longer a linear program. We use Lemma 3.1 as described in [Bis09] to solve this issue. Lemma 3.1. For any optimization problem, if y ∈ {0, 1}, 0 ≤ x ≤ m, and w ∈ R are the decision variables then the following constraints ensure that w = xy, w ≤ my,  (3.12e)  w ≤ x,  (3.12f)  w ≥ x − m(1 − y),  (3.12g)  w ≥ 0.  (3.12h)  Proof. For y = 0, Equations (3.12e) and (3.12h) imply w = 0, and Equations (3.12f) and (3.12g) imply 0 ≤ x ≤ m. For y = 1, Equations (3.12f) and (3.12g) imply w = x, and Equations (3.12e) and (3.12h) imply 0 ≤ x ≤ m. So, for both cases Equations (3.12e), (3.12f), (3.12g) and (3.12h) imply w = xy and 0 ≤ x ≤ m. Lemma 3.1 allows us to rewrite the quadratic terms as linear terms by introducing additional continuous variables. For all k ∈ I and t ∈ T , we introduce + − + + continuous decision variables Wkt and Wkt such that Wkt = ykt Vς(k) for the cut − − sections with blocks and Wkt = ykt Vς(k) for the fill sections with blocks. For all + + k ∈ I, t ∈ T , the following constraints ensures that Wkt = ykt Vς(k) , + + Wkt ≤ Mς(k) ykt ,  (3.12i)  + + Wkt ≤ Vς(k) ,  (3.12j)  + + + Wkt ≥ Vς(k) − Mς(k) (1 − ykt ), + Wkt ≥ 0,  (3.12k) (3.12l)  38  3.2. Model description − − and the following constraints ensures that Wkt = ykt Vς(k) , − − Wkt ≤ Mς(k) ykt ,  (3.12m)  − − Wkt ≤ Vς(k) , − Wkt − Wkt  ≥  − Vς(k)  −  (3.12n) − Mς(k) (1  − ykt ),  ≥ 0.  (3.12o) (3.12p)  The block removal indicator constraints ensure that when the required amount of earth is cut or filled for any section with blocks then the block is removed for that section. For all k ∈ I, u ∈ T , these constraints are written as follows, u t=0  + xς(k)jt ≥ Wku ,  (3.12q)  − . xjς(k)t ≥ Wku  (3.12r)  ς(k) j∈N→  u t=0 j∈N ς(k) ←  At least one block must be removed at each time-step. So, for all t ∈ T \{nz + 1}, ykt ≥ t.  (3.12s)  k∈I  The monotonicity constraints are optional constraints that ensure that if a block is removed at any time-step then it will stay removed for all the later time-steps. So, for all k ∈ I, t ∈ T \{nz + 1}, yk,(t+1) ≥ yk,t .  3.2.5  (3.12t)  Volume constraints  The volume constraints ensure that the total volume excavated from a section or embanked to a section must be equal to the volume difference between the ground profile and the road profile for that section. For all i ∈ S, if the area for is Ai then the volume constraints can be written as Vi+ − Vi− = Ai ui .  (3.13a)  Equation (3.13a) also implies that ui > 0 for a cut, ui < 0 for a fill, and ui = 0 for a section that is neither cut nor fill. 39  3.2. Model description  Ground Profile  Road Profile Without side-slopes  With side-slopes  Figure 3.1: The cross-section of a road with and without side-slopes (for a cut).  Road Profile  Ground Profile Without side-slopes  With side-slopes  Figure 3.2: The cross-section of a road with and without side-slopes (for a fill). Side-slopes Constructed roads must have side-slopes for stability reasons. Not considering side-slopes in the model introduces significant errors in the volume. Definition 3.2. Side-slopes. Side-slopes are defined as the gradual decrease (respectively increase) of height from the road profile to the ground profile for a fill (respectively cut) section. Figures 3.1 and 3.2 show the cross-section of a road with and without sideslopes for a cut and a fill respectively. Without side-slopes the cross-section of a road is a rectangle, and with side-slopes it is typically a trapezoid. So, for a fixed section length and width the volume of a section is a linear function of the height of the road when side-slopes are not considered. However, when side-slopes are considered, the volume becomes a quadratic function of the height for typical roads, and thus the linear structure of the model is violated. Some real world examples exist where the constructed road must have very complicated side-slopes. So, we seek a general way to approximate side-slopes that not only performs very well for the typical roads but also performs reasonably for worst case scenarios. Since the cost parameters for this model are estimations with a 5% expected error, the model will be practical if the approximation of side-slopes is within the error margin. 40  3.2. Model description  ̅ ̅ ̅  v  After approximation  Before approximation  Figure 3.3: Approximation of side-slopes (for a cut).  Before approximation  After approximation  Figure 3.4: Approximation of side-slopes (for a fill). Approximation of side-slopes For typical roads with side-slopes, we propose to approximate the trapezoid shaped cross-sections with k rectangles. We call the height of such a rectangle the slab-height. Figures 3.3 and 3.4 show the approximation of side-slopes for a cut and a fill respectively. The cross-section of a cut section i is approximated by ki+ rectangles having k+  k+  slab-height u1i , u2i , ..., ui i and width wi1 , wi2 , ..., wi i where k+  0 < wi1 < wi2 < ... < wi i .  (3.13b)  So, for the cut section i with section length of L, the volume of these rectangular k+ k+  bars are A1i u1i , A2i u2i , ..., Ai i ui i with k+  0 < A1i < A2i < ... < Ai i  (3.13c)  where Aki = wik × L for all k ∈ {1, 2, ..., ki+ }. Similarly, if the side slope of a fill section i with section length of L is apk+  proximated by ki− rectangular bars having slab-height u1i , u2i , ..., ui i and area k−  Bi1 , Bi2 , ..., Bi i with  k−  0 < Bi1 < Bi2 < ... < Bi i  (3.13d) 41  3.2. Model description k− k−  then the volume of these bars are Bi1 u1i , Bi2 u2i , ..., Bi i ui i . It should be noted that uki are negative numbers for all k ∈ {1, 2, ..., ki− }, and Equations (3.13c) and (3.13d) are the assumptions of the model. For all i ∈ S, ka ∈ {1, 2, ..., ki+ }, and kb ∈ {1, 2, ..., ki− }, the cut and fill area lists, Aki a and Bikb , are given to the model as a table, which is called a lookup table. So, a lookup table has ki+ entries for cut area information and ki− entries for fill area information. First, we will develop the side-slope equations for the cut sections and then extend the same idea for the fill sections. For a cut section i, Vi− = 0, so the volume constraint (3.13a) becomes Vi+ = Ai ui .  (3.13e)  If the cut section is approximated by ki+ entries from the lookup table then the volume constraint considering side-slopes can be written as k+ k+  Vi+ = A1i u1i + A2i u2i + ... + Ai i ui i k+  (3.13f)  k+  k+  where 0 ≤ u1i ≤ u1i , 0 ≤ u2i ≤ u2i , ..., 0 ≤ ui i ≤ ui i , and ui = u1i +u2i +...+ui i . Proposition 3.3. For any optimal solution to the MILP, if i is a cut section and u1i + u2i + ... + uki ≤ ui ≤ u1i + u2i + ... + uk+1 then u1i = u1i , u2i = u2i ,..., uki = uki , i k+  = 0, uk+3 = 0,..., ui i = 0. uk+1 = ui − (u1i + u2i + ... + uki ), uk+2 i i i k+ k+  Proof. Since Vi+ = A1i u1i + A2i u2i + ... + Ai i ui i is being minimized in the k+  objective function and 0 < A1i < A2i < ... < Ai i , u1i must be equal to u1i if u2i has a value, otherwise there is another solution with a lower objective value. With similar logic, u2i , u3i , ..., uki must go to their upper bounds, uk+1 must equal to the i remaining height, and rest must be 0. Remark 3.4. The above implementation of side slopes introduces ki+ + ki− more continuous variables for each section i. Lemma 3.5. Given 0 < A1 < A2 , consider  42  3.2. Model description  (LP1) s.t.  min V,  u1 ,u2  V = A1 u1 + A2 u2 , u = u1 + u2 , 0 ≤ u1 ≤ u1 , 0 ≤ u2 ≤ u2 ,  (LP2) s.t.  min V, u  V ≥ A1 u, V ≥ A1 u1 + A2 (u − u1 ),  Then (LP2) will give the same result as (LP1). Proof. (LP2) can be written as, min V, s.t.  V ≥ max{A1 u, A1 u1 + A2 (u − u1 )}, 0 < A1 < A2 .  Since it is a minimization problem, the optimized output would be Vopt = max{A1 u, A1 u1 + A2 (u − u1 )}. Case I (u ∈ [0, u1 ]): For (LP1), since u ∈ [0, u1 ] by Proposition 3.3 we have u1 = u and u2 = 0. So, Vopt = A1 u. For (LP2), since A1 < A2 and u ∈ [0, u1 ] we have, Vopt = max{A1 u, A1 u1 + A2 (u − u1 )}, = A1 u. Case II (u ∈ [u1 , u1 + u2 ]): For (LP1), since u ∈ [u1 , u1 + u2 ] by Proposition 3.3 we have u1 = u1 and u2 = u − u1 . So, Vopt = A1 u1 + A2 (u − u1 ). For (LP2), since A1 < A2 and u ∈ [u1 , u1 + u2 ] we have Vopt = max{A1 u, A1 u1 + A2 (u − u1 )}, = A1 u1 + A2 (u − u1 ).  43  3.2. Model description Theorem 3.6. Given 0 < A1 < A2 < .... < An , the following LP min V s.t.  V ≥ A1 h V ≥ A1 u1 + A2 (h − u1 ) V ≥ A1 u1 + A2 u2 + A3 (h − u1 − u2 ) V ≥ A1 u1 + A2 u2 + A3 u3 + A4 (h − u1 − u2 − u3 ) . . . V ≥ A1 u1 + A2 u2 + ... + An−1 un−1 + An (h − u1 − u2 − .... − un−1 )  is equivalent to min  u1 ,u2 ,...,un  s.t.  V,  V = A1 u1 + A2 u2 + ... + An un , u = u1 + u2 + ... + un , 0 ≤ u1 ≤ u1 , 0 ≤ u2 ≤ u2 , . . . 0 ≤ un ≤ un .  Proof. If n = 2, then Lemma 3.5 completes the proof. Similar logic can be applied by using Proposition 3.3. Remark 3.7. Implementation of side slopes by Theorem 3.6 reduces the number of continuous variables for side-slopes from ki+ + ki− to zero for each section i. Lemma 3.8. If no roadside stockpiling occurs then the volume constraints (3.13a) are equivalent to  Vi+ ≥ Ai ui for all i ∈ S,  (3.13g)  Vi−  (3.13h)  ≥ −Ai ui for all i ∈ S.  44  3.2. Model description Proof. If i is a cut, Vi− = 0 when no roadside stockpiling occurs, which also satisfies Equation (3.13h) since its right hand side is a negative number, and Vi+ = Ai ui since the objective function minimizes Vi+ and Vi+ ≥ Ai ui by Equation (3.13g). So, Vi+ − Vi− = Ai ui − 0 = Ai ui . If i is a fill, Vi+ = 0 when no roadside stockpiling occurs, which also satisfies Equation (3.13g) since its right hand side is a negative number, and Vi− = −Ai ui since the objective function minimizes Vi− and Vi− ≥ −Ai ui by Equation (3.13h). So, Vi+ − Vi− = 0 − (−Ai ui ) = Ai ui . If i is neither cut nor fill, Vi+ = 0 and Vi− = 0 when no roadside stockpiling occurs, which also satisfy Equations (3.13g) and (3.13h) since their right hand sides are zero. So, Vi+ − Vi− = 0 = Ai ui since ui = 0. By Lemma 3.8 and Corollary 3.6, we replace the volume constraints (3.13a) by the following constraints to incorporate side slope, given 0 < A1i < A2i < ... < k−  k+  Ai i and 0 < Bi1 < Bi2 < ... < Bi i , for all i ∈ S, Vi+ ≥ A1i ui Vi+ Vi+  ≥ ≥  A1i u1i A1i u1i  (3.13i) + +  A2i (ui − u1i ) A2i u2i + A3i (ui  (3.13j) −  u1i  −  u2i )  (3.13k)  . . k+  k+ −1  Vi+ ≥ A1i u1i + A2i u2i + ... + Ai i (ui − u1i − ... − ui i  )  (3.13l)  Vi− ≥ −Bi1 ui Vi− Vi−  ≥ ≥  −Bi1 u1i −Bi1 u1i  (3.13m) − −  Bi2 (ui − u1i ) Bi2 u2i − Bi3 (ui  (3.13n) −  u1i  −  u2i )  (3.13o)  . . k−  k− −1  Vi− ≥ −Bi1 u1i − Bi2 u2i − ... − Bi i (ui − u1i − ... − ui i  ).  (3.13p)  The compact form of these equations are, for ka ∈ {1, 2, ..., ki+ } ka −1  ka −1  Aki uki + Aki a  Vi+ ≥ k=1  uki  ui −  ,  (3.13q)  k=1  45  3.2. Model description  𝑉𝑖+ 𝐴1𝑖 𝑢1𝑖 + 𝐴2𝑖 𝑢𝑖2 + 𝐴3𝑖 (𝑢𝑖 − 𝑢1𝑖 − 𝑢𝑖2 ) 𝐴1𝑖 𝑢1𝑖 + 𝐴2𝑖 (𝑢𝑖 − 𝑢1𝑖 ) 𝐴1𝑖 𝑢𝑖 𝑢1𝑖  𝑢𝑖  𝑢𝑖2  𝑢𝑖3  Figure 3.5: Convexity of Vi+ when 0 < A1i < A2i < A3i . and for kb ∈ {1, 2, ..., ki− } kb −1  Vi−  kb −1  Bik uki  ≥−  −  Bikb  k=1  uki  ui −  .  (3.13r)  k=1  Remark 3.9. Both Vi+ and Vi− are represented as a piecewise linear function of ui . Modeling a piecewise linear function requires binary variables to indicate the piece to be used for calculation, unless the function is convex. The assumptions k+  k−  0 < A1i < A2i < ... < Ai i and 0 < Bi1 < Bi2 < ... < Bi i make Vi+ and Vi− piecewise linear convex functions (see Figure 3.5 where A1i , A2i , and A3i are the slopes of the linear pieces). For non-convex data, approximation is required to convexify. Our numerical experiments show that less than 1% entries of the lookup table are non-convex for most of the problems of our test set.  3.2.6  Roadside stockpiling constraints  Roadside stockpiling constraints ensure that no roadside stockpiling occurs. In that case, for any section i ∈ S at least one of Vi+ and Vi− must be zero, which holds for the spline LP model of vertical alignment as shown in the previous chapter. But it may not hold for this model, since both Vi+ and Vi− of section i depend 46  3.2. Model description on the earth movement variables and sometimes the earth movement is restricted by the presence of blocks. We call such sections block dependent sections. We introduce additional binary variables bi for all i ∈ S to ensure at least one of Vi+ and Vi− must be zero. If a section i is a cut then bi = 1 otherwise bi = 0. So, the roadside stockpiling constraints can be written as Vi+ ≤ M bi ,  (3.14a)  Vi+ Vi−  (3.14b)  ≥  δi+ bi ,  ≤ M (1 − bi ),  (3.14c)  where M is a big number, and δi+ is the smallest possible cut volume for a section i. An alternate representation of Equations (3.14), which ensure bi = 1 for a cut, bi = 0 for a fill, and a section must be either a cut or fill with at least a small δ volume, can be the following Vi+ ≤ M bi ,  (3.15a)  Vi+ Vi− Vi−  ≥ δbi ,  (3.15b)  ≤ M (1 − bi ),  (3.15c)  ≥ δ(1 − bi ).  (3.15d)  We show that even with the additional n binary variables the performance of the model will not decrease significantly. Lemma 3.10. If i is not a block dependent section, 0 ≤ bi ≤ 1 is continuous (instead of binary), and the roadside stockpiling constraints are represented by Equation (3.15) , then bi will either be 0 or 1 in the optimal solution. Proof. If i is not a block dependent section, then either Vi+ or Vi− or both will be zero in the optimal solution otherwise we can prove there is another solution with a lower objective value. If Vi+ is zero, then bi must be zero by Equation (3.15b) since δ > 0. If Vi− is zero, then bi must be 1 by Equation (3.15d) since δ > 0. So, bi will never take a fractional value. Corollary 3.11. If i is not a block dependent section, bi ∈ {0, 1}, and the roadside stockpiling constraints are represented by Equation (3.15), then the MILP algorithm will never branch on any bi . Proof. The branch and bound algorithm for solving MILP make branching decision based on LP relaxation of the MILP and the algorithm will branch on only those binary variables which has fractional value on the LP relaxation. By Lemma 3.10, the branch and bound algorithm will never branch on bi . The MILP algorithm will run as if the binary variable bi never existed. 47  3.2. Model description Theorem 3.12. If the roadside stockpiling constraints are represented by Equation (3.15), then the MILP algorithm may only branch on bi if i is a block dependent section. Proof. By Corollary 3.11 this theorem holds. Lemma 3.13. If i is not a block dependent section, 0 ≤ bi ≤ 1 is continuous (instead of binary), and the roadside stockpiling constraints are represented by Equation (3.14) , then bi will be 0 when Vi+ = 0 and can take any value within the range 0 < bi ≤ 1 when Vi+ = 0 in the optimal solution. Proof. If i is not a block dependent section, then either Vi+ or Vi− will be zero in the optimal solution otherwise we can prove there is another solution with a lower objective value. If Vi+ is zero, then bi must be zero by Equation (3.14b) since δ > 0. If Vi+ = 0, then bi cannot be zero by Equation (3.14b) since δ > 0. So, bi may take a fractional value if i is a cut. Corollary 3.14. If i is not a block dependent section, bi ∈ {0, 1}, and the roadside stockpiling constraints are represented by Equation (3.14), then the MILP algorithm may branch on bi when i is a cut. Proof. By Lemma 3.13, the branch and bound algorithm may branch on bi when i is a cut. Theorem 3.15. If the roadside stockpiling constraints are represented by Equation (3.14), then the MILP algorithm may only branch on bi if i is a block dependent section or a cut. Proof. By Corollary 3.14 this theorem holds. Remark 3.16. If the roadside stockpiling constraints are represented by Equation (3.15), from Theorem 3.12, we see that if a section i is not a block dependent section the model will be solved as if bi never existed, and if the roadside stockpiling constraints are represented by Equation (3.14), from Theorem 3.15, we see that if a section i is not a block dependent section and a fill the model will be solved as if bi never existed. Theorem 3.17. If S0 is the set of sections that are neither cuts nor fills, then the solution time of a model with Equation (3.15) will be less than or equal to that of a model with Equation (3.15) with error value i∈S0 δ × min{pi , qi }.  48  3.2. Model description Proof. The more binary variables the branch and bound algorithm branches on, the longer it takes to solve. By Theorems 3.12 and 3.15, the roadside stockpiling constraints represented by Equation (3.15) can always be solved as fast as or faster than the same model with roadside stockpiling constraints represented by Equation (3.14). If Equations (3.14) are used as the roadside stockpiling constraints then both Vi+ and Vi− cannot be zero at the same time. In the situation where both Vi+ and Vi− should be zero, the optimizer will choose Vi+ = δ if pi > qi and Vi− = δ if pi < qi and thus will introduce δ × min{pi , qi } error in the objective function. Remark 3.18. If S0 = ∅, then Equations (3.14) and (3.15) are logically equivalent. Remark. The option of choosing between Equations (3.14) and (3.15) will be exposed to the end-users who can decide whether they want a faster solution or a more accurate solution.  3.2.7  Gap constraints  The gap constraints ensure that the area gap between the ground profile and the road profile for any section i, must be equal to the area created by section length and the height difference between the ground profile and the road profile. For all g ∈ G, i ∈ Sg the gap constraints can be written as hg,i − ag,3  3.2.8  (sg,i+1 )2 + sg,i+1 sg,i + (sg,i )2 sg,i+1 + sg,i − ag,2 − ag,1 = uκ(g,i) . 3 2 (3.16)  Slope constraints  The slope constraints (3.17) implies that the slope of the spline segments must not go beyond a maximum value U or a minimum value L, and since the spline segments are quadratic checking the slope bounds at the beginning and end point of the spline segments is sufficient. For all g ∈ G, i ∈ {1, ng } the slope constraints can be written as L ≤ ag,2 + 2ag,3 sg,i ≤ U . (3.17)  3.2.9  Smoothness constraints  The C 0 continuity constraints force the spline segments to be continuous at their joining points. So, for all g ∈ G\{1} ag,1 + ag,2 sg,1 + ag,3 s2g,1 = a(g−1),1 + a(g−1),2 sg,1 + a(g−1),3 s2g,1 ,  (3.18a)  49  3.2. Model description and the C 1 continuity constraints force the spline segments to be differentiable or smooth at their joining points i.e., for all g ∈ G\{1} ag,2 + 2ag,3 sg,1 = a(g−1),2 + 2a(g−1),3 sg,1 .  3.2.10  (3.18b)  Fixed point constraints  The fixed point constraints fix the starting and ending elevations, a1,1 + a1,2 s1,1 + a1,3 s21,1 = HA , am,1 + am,2 sm,nm +  am,3 s2m,nm  (3.19a) = HB ,  (3.19b)  the elevations of the fixed points, for all Hg,i ∈ H ag,1 + ag,2 sg,i + ag,3 s2g,i = Hg,i ,  (3.19c)  as well as the starting and ending slopes, a1,2 + 2a1,3 s1,1 = HA ,  (3.19d)  am,2 + 2am,3 sm,nm = HB .  (3.19e)  It should be noted that Equations (3.19d) and (3.19e) are optional constraints for most of the problems.  3.2.11  Bounds  The bounds of the decision variables are as follows, for all (i, j) ∈ N 2 , t ∈ T , xijt ≥ 0,  (3.20a)  ykt ∈ {0, 1},  (3.20b)  ui ≤ ui ≤ ui ,  (3.20c)  Vi+ Vi−  (3.20d)  for all k ∈ I, t ∈ T , for all i ∈ S,  0≤ 0≤  ≤ ≤  Mi+ , Mi− ,  (3.20e)  for all g ∈ G, k ∈ {1, 2, 3}, ag,k ∈ R.  (3.20f)  50  3.3. Model summary  3.3  Model summary  The summary of the MILP model for the vertical alignment design considering blocks and side-slopes is stated below.  3.3.1  The objective function  pi Vi+ + qi Vi− +  min  pi xijt i t∈T i∈B j∈N→  i∈S  +  qi xjit +  3.3.2  cij xijt .  (3.8)  (i,j)∈N 2 t∈T  i t∈T i∈W j∈N←  Balance constraints  For all i ∈ S, xijt = Vi+ ,  (3.9a)  xjit = Vi− .  (3.9b)  xijt ≤ Cib ,  (3.10)  xjit ≤ Ciw .  (3.11)  i t∈T j∈N→  and for all i ∈ S,  i t∈T j∈N←  3.3.3  Pit constraints  For all i ∈ B, i t∈T j∈N→  and for all i ∈ W,  i t∈T j∈N←  3.3.4  Block constraints  For all t ∈ T \{1}, k ∈ I, and (i, j) ∈ Nbk , xijt ≤ M yk,t−1 ,  (3.12a)  51  3.3. Model summary for all t ∈ T \{1}, (k1 , k2 ) ∈ I 2 , and i, j ∈ Nbk1 ,k2 , xijt ≤ M yk1 ,t−1 + M yk2 ,t−1 ,  (3.12b)  for all t ∈ T \{1}, k ∈ I ← , and i, j ∈ Nb←,k , xijt ≤ M yk,t−1 ,  (3.12c)  for all t ∈ T \{1}, k ∈ I → , and i, j ∈ Nbk,→ , xijt ≤ M yk,t−1 ,  (3.12d)  for all k ∈ I, u ∈ T , + + Wku ≤ Mς(k) yku ,  (3.12i)  + + Wku ≤ Vς(k) ,  (3.12j)  + + + (1 − yku ), − Mς(k) ≥ Vς(k) Wku  (3.12k)  − − Wku ≤ Mς(k) yku ,  (3.12m)  − − ≤ Vς(k) , Wku  (3.12n)  − − − Wku ≥ Vς(k) − Mς(k) (1 − yku ),  (3.12o)  u + , xς(k)jt ≥ Wku  (3.12q)  − , xjς(k)t ≥ Wku  (3.12r)  t=0 j∈N ς(k) → u t=0 j∈N ς(k) ←  for all t ∈ T \{nz + 1}, ykt ≥ t,  (3.12s)  k∈I  and for all k ∈ I, t ∈ T \{nz + 1}, yk,(t+1) ≥ yk,t .  3.3.5  (3.12t)  Volume constraints k−  k+  Given 0 < A1i < A2i < ... < Ai i and 0 < Bi1 < Bi2 < ... < Bi i , for ka ∈ {1, 2, ..., ki+ } ka −1  ka −1  Aki uki + Aki a  Vi+ ≥ k=1  uki  ui −  ,  (3.13q)  k=1  52  3.3. Model summary and for kb ∈ {1, 2, ..., ki− } kb −1  kb −1  Bik uki − Bikb  Vi− ≥ −  .  (3.13r)  k=1  k=1  3.3.6  uki  ui −  Roadside stockpiling constraints  If the end-user prefers accuracy over speed, then for all i ∈ S, Vi+ ≤ M bi ,  (3.14a)  Vi+ Vi−  (3.14b)  ≥  δi+ bi ,  ≤ M (1 − bi ),  (3.14c)  otherwise, for all i ∈ S,  3.3.7  Vi+ ≤ M bi ,  (3.15a)  Vi+ Vi− Vi−  ≥ δbi ,  (3.15b)  ≤ M (1 − bi ),  (3.15c)  ≥ δ(1 − bi ).  (3.15d)  Gap constraints  For all g ∈ G, i ∈ Sg , hg,i − ag,3  3.3.8  sg,i+1 + sg,i (sg,i+1 )2 + sg,i+1 sg,i + (sg,i )2 − ag,2 − ag,1 = uκ(g,i) . 3 2 (3.16)  Slope constraints  For all g ∈ G, i ∈ {1, ng }, L ≤ ag,2 + 2ag,3 sg,i ≤ U .  3.3.9  (3.17)  Smoothness constraints  For all g ∈ G\{1}, ag,1 + ag,2 sg,1 + ag,3 s2g,1 = a(g−1),1 + a(g−1),2 sg,1 + a(g−1),3 s2g,1 ,  (3.18a)  ag,2 + 2ag,3 sg,1 = a(g−1),2 + 2a(g−1),3 sg,1 .  (3.18b) 53  3.4. Model evaluation  3.3.10  Fixed point constraints  a1,1 + a1,2 s1,1 + a1,3 s21,1 = HA , am,1 + am,2 sm,nm +  am,3 s2m,nm  (3.19a) = HB ,  (3.19b)  for all Hg,i ∈ H ag,1 + ag,2 sg,i + ag,3 s2g,i = Hg,i ,  (3.19c)  and  3.3.11  a1,2 + 2a1,3 s1,1 = HA ,  (3.19d)  am,2 + 2am,3 sm,nm = HB .  (3.19e)  Bounds  For all (i, j) ∈ N 2 , t ∈ T , xijt ≥ 0,  (3.20a)  ykt ∈ {0, 1},  (3.20b)  for all k ∈ I, t ∈ T ,  + Wkt − Wkt  ≥ 0,  (3.12l)  ≥ 0,  (3.12p)  for all i ∈ S, ui ≤ ui ≤ ui , 0≤ 0≤  Vi+ Vi−  ≤ ≤  Mi+ , Mi− ,  (3.20c) (3.20d) (3.20e)  and for all g ∈ G, k ∈ {1, 2, 3}, ag,k ∈ R.  3.4  (3.20f)  Model evaluation  Proposition 3.19. The MILP of Section 3.3 has O(n2 nz ) continuous variables.  54  3.5. Algorithms Proof. The MILP has n variables for excavation volume, n variables for embankment volume, (n2 +nb n+nw n)(nz +1) variables for hauling volume, 2nz (nz +1) + − number of Wku and Wku variables, 3m variables for the spline coefficients, and n variables for section height. So, the total number of continuous variables is n + n + (n2 + nb n + nw n)(nz + 1) + 2nz (nz + 1) + 3m + n = 3n + 3m + (n2 + nb n + nw n + 2nz )(nz + 1) ≤ 6n + (n2 + n2 + n2 + 2nz )(nz + nz ) = 6n + 6n2 nz + 4n2z since n ≥ nb , n ≥ nw , n ≥ m, and n ≥ nz and assuming nz ≥ 1. Proposition 3.20. The MILP of Section 3.3 has O(n2z + n) binary variables. Proof. The total number of binary variables is nz (nz + 1) + n ≤ 2n2z + n assuming nz ≥ 1. Proposition 3.21. The MILP of Section 3.3 has O(n2 n3z ) constraints. Proof. The number of constraints created by different equations of this model are shown in Table 3.1. The total number of constraints is O(n2 n3z ).  3.5  Algorithms  In this section, we recall some algorithms to speed up the solution of the model. These algorithms are studied in more detail in [HKL11, Koc10].  3.5.1  The direct solve (DS) algorithm  The direct solve algorithm is the most basic algorithm that reads the data and build the model depending on the solver specification. Then it solves the model and writes the solution. But some models can be ill conditioned. A linear program or a mixed integer program is called ill conditioned or numerically unstable when a small change in the input results in a big change in the output. Having very large or very small numbers as coefficients in the constraint matrix is a source of numerical instability. Constraints (3.16), (3.18a), and (3.19a) make our model numerically unstable because of the quadratic coefficients. A ill conditioned model can cause trouble in the pivot selection process of the simplex algorithm. So, for this sort of numerical instability we have to either scale the constraint matrix or make the solver use a more conservative pivoting scheme during the basis factorization. 55  3.5. Algorithms Equation (3.9a),(3.9b) (3.10),(2.26e) (3.12a) (3.12b) (3.12c), (3.12d) From (3.12i) to (3.12r) (3.12s) (3.12t) (3.13q), (3.13r) From (3.14a) to (3.14c) From (3.14a) to (3.14c) (3.16) (3.17) (3.18a), (3.18a) From (3.19a) to (3.19e)  Number of Constraints (worst case) 2n nb + nw 1 2 n (nz + 1)nz 4 2 (n − 1) (nz + 1) nz (n2z −1) 2(n − 1)2 (nz + 1)nz 2nz (n − 1)(nz + 1) nz n2z + − i∈S (ki + ki ) 3n 4n n 2m 2(m − 1) 4 + |H|  Table 3.1: Number of constraints created by different equations of the basic MILP model Most commercial solvers have built-in functionality to handle ill conditioned models. For example, CPLEX has a scale factor that can be used for aggressive scaling and another parameter named Markowitz tolerance for a more conservative pivoting scheme. A function can be written to scale the constraint matrix if the solver does not have this functionality. Our preliminary result shows that if the maximum station number gets bigger than 1000 then the model starts to become ill conditioned. Algorithm 3.1 DS Step 0. READ the data and BUILD the model   IF the model is an ill conditioned model  Step 1. CALL the ill conditioned model handling function   ENDIF Step 2. SOLVE the model Step 3. WRITE the solution and RETURN the status of the solution  56  3.5. Algorithms Algorithm 3.2 DSS Step 0. READ the data and BUILD the model   IF the model is an ill conditioned model  Step 1. CALL the ill conditioned model handling function   ENDIF   SELECT the left most access road     SET ykt such that it removes      the block closest to the access road at time-step 1  Step 2. the block second closest to the access road at time-step 2    ...      the block farthest to the access road at time-step nb     SOLVE the model with the added constraints Step 3. USE the solution as a starting point for the original model Step 4. SOLVE the model Step 5. WRITE the solution and RETURN the status of the solution  3.5.2  The direct solve with starting point (DSS) algorithm  The direct solve with starting point algorithm starts with a feasible starting point. While generating a very good feasible starting point is still an active research area, we use a heuristic to generate a reasonable feasible starting point. The left most access road is chosen, then variables ykt are set in such a way that the block closest to the access road is removed first, then the next closest is removed and so on. With these values of ykt the model is solved and the solution is used as a feasible starting point.  3.5.3  The maximal movement distance (M dmax α) algorithm  Heuristic 3.22. It is better to move earth to a closer section than a farther section. The idea behind this algorithm is Heuristic 3.22. The algorithm starts with an initial dmax and sets the values of xijt = 0 for the section that are dmax further from each other. Then it solves the model and continues to use the solution as a starting point of the next iteration until dmax is large enough so no xijt is set to zero. At that iteration, we get the optimal solution.  57  3.5. Algorithms  Algorithm 3.3 M dmax α Step 0. INPUT dmax ≥ 2, α > 1, READ the data and BUILD the model   IF the model is an ill conditioned model Step 1. CALL the ill conditioned model handling function   ENDIF   IF there is a starting point      ADD the starting point to the model      ENDIF     FOR EACH section i, section j, and time-step t  Step 2. IF |i − j| > dmax    SET xijt = 0      ENDIF      ENDFOR     SOLVE the model with the added constraints   IF dmax > |S|     WRITE the solution and RETURN the status of the solution    ELSE Step 3.  SET dmax as α × dmax      ENDIF    GO TO Step 2  58  3.5. Algorithms Algorithm 3.4 M T dmax α Step 0. INPUT dmax ≥ 2, α > 1, > 0, READ the data and BUILD the model   IF the model is an ill conditioned model  Step 1. CALL the ill conditioned model handling function   ENDIF Step 2. SOLVE the LP relaxation and SAVE the objective value  IF there is a starting point      ADD the starting point to the model      ENDIF      FOR EACH section i, section j, and time-step t      IF |i − j| > dmax Step 3. SET xijt = 0      ENDIF      ENDFOR      SOLVE the model with the added constraints     CALCULATE the mipgap as Step 3 Obj−Step 2 Obj × 100 Step 2 Obj   IF dmax > |S|OR mipgap<      WRITE the solution and RETURN the status of the solution    ELSE Step 4.  SET dmax as α × dmax      ENDIF    GO TO Step 2  3.5.4  The maximal movement distance with mipgap tolerance (M T dmax α) algorithm  The maximal movement distance with mipgap tolerance algorithm is an improvement over the M dmax α algorithm. The optimal solution may occur in any of the intermediate steps of the M dmax α algorithm. Setting xijt = 0 gives the lower bound for the optimal solution of the original model and the LP relaxation gives the upper bound. Consequently, this algorithm also checks the mipgap and if it is within the tolerance then the algorithm terminates.  59  Chapter 4  A Quasi-network-flow Model for Vertical Alignment Considering Blocks and Side-slopes Take what you need, act as you must, and you will obtain that for which you wish. René Descartes (1596 - 1650) In general, a mixed integer linear program is NP-hard. As a result, some MILPs require smart modeling techniques to solve them in a reasonable time-frame. Hare, Koch, and Lucet [HKL11] found that the M dmax α and M T dmax α algorithms solve the problems with large number of sections noticeably faster than other algorithms. Both of these algorithms are based on Heuristic 3.22, which suggests that it is more probable to have earth movements among nearby sections than among further sections in an optimal solution. So, these algorithms start with a small maximum distance for earth movement, and continue to increase the maximum distance at each iteration until the optimality conditions are satisfied. These algorithms can be very efficient, if a good value for the initial maximum distance (dmax ) and the maximum distance increase factor (α) can be calculated, which usually varies depending on the problem. Heuristic 3.22 motivates us to seek an alternate modeling technique. The model introduced in this chapter can be visualized as a graph where the sections and pits are nodes and the arcs represent feasible moves. Additional virtual nodes called transit nodes are also introduced. The amount of earth moved through an arc is called flow. There are different types of flows in the model. – Each section has a load and an unload flow representing fill and cut amount respectively. Each of the flows are further divided into two for east and west direction.  60  4.1. Definitions and model parameters  𝑟 𝑓𝑖,𝑖−1,𝑡  𝑟 𝑓𝑖+1,𝑖,𝑡 West transit node [i]  Borrow [j]  𝑓𝑗𝑏,𝑖−1,𝑡  𝑓𝑗𝑏,𝑖+1,𝑡 East transit node [i-1]  𝑟 𝑓𝑖−1,𝑖,𝑡  𝑢 𝑓𝑖,𝑖−1,𝑡  𝑙 𝑓𝑖+1,𝑖,𝑡  Section [i]  𝑙 𝑓𝑖−1,𝑖,𝑡  𝑢 𝑓𝑖,𝑖+1,𝑡  West transit node [i+1]  𝑤 𝑓𝑖+1,𝑘,𝑡 Waste [k]  West transit node [i-1]  𝑤 𝑓𝑖−1,𝑘,𝑡  East transit node [i]  𝑟 𝑓𝑖,𝑖+1,𝑡  East transit node [i+1]  Figure 4.1: A typical section i at time-step t (where ϑ(j) = ϕ(k) = i). – Each borrow pit has an unload flow representing its cut amount for both directions. These flows are called borrow flows. – Each waste pit has a load flow representing its fill amount for both directions. These flows are called waste flows. – Each section has an east and a west transit node, each of which has a east transit flow and a west transit flow representing earth movement from one section to another. All these flows are the decision variables of the model. A typical section is shown in Figure 4.1. This formulation reduces the earth movement variables from O(n2 nz ) to O(nnz ).  4.1  Definitions and model parameters  For this model, we use the definitions and model parameters from Section 3.1.  4.1.1  Cost components  The cost components are as follow. – For a section i, the per unit volume excavation cost is pi , and the per unit volume embankment cost is qi . The per unit volume hauling cost from section i to section i − 1 (respectively i + 1) is represented as cri,i−1 = cdi,i−1 61  4.1. Definitions and model parameters (respectively cri,i+1 = cdi,i+1 ), where c represents the cost of moving one unit volume of earth to one unit distance, and dij is the distance between section i and j. – For a borrow pit i, the borrow cost for either direction is cbi = pi + cd˜i . ˜ – For a waste pit i, the waste cost for either direction is cw i = qi + cdi . It should be noted that the model requires the described structure of the cost function. Remark 4.1. Borrow pits normally have higher quality materials than other sections. As a result the embankment cost with the materials from a borrow pit is lower than other embankment costs. But, after the borrow flows reach the transit nodes, the model cannot differentiate between borrow materials and other materials. To incorporate this in the model, the difference between general embankment cost and the borrow embankment cost is subtracted from the borrow excavation cost, so that the borrowed materials can be treated as normal materials.  4.1.2  Decision variables  The decision variables are – Vi+ (for all i ∈ S ∪ B): the volume of earth excavated from any section, – Vi− (for all i ∈ S ∪ W): the volume of earth embanked to any section, r r – fi,i−1,t , fi,i+1,t (for all i ∈ N , t ∈ T ): the flow of earth from one transit node to the next in both directions, b b – fj,ϑ(j)−1,t , fj,ϑ(j)+1,t (for all j ∈ B, t ∈ T ): the flow of earth to both east and waste transit nodes from a borrow pit, w w – fϕ(k)−1,k,t , fϕ(k)+1,k,t (for all k ∈ W, t ∈ T ): the flow of earth from both east and west transit nodes to a waste pit, l l – fi−1,i,t , fi+1,i,t (for all i ∈ N , t ∈ T ): the flow of earth from both east and west transit nodes to a section (also known as the load flow), u u – fi,i−1,t , fi,i+1,t (for all i ∈ N , t ∈ T ): the flow of earth from a section to both east and west transit nodes (also known as the unload flow),  – ag,k (for all g ∈ G, k ∈ {1, 2, 3}): the coefficient of the quadratic polynomials, 62  4.1. Definitions and model parameters – ui (for all i ∈ S): the height difference of the ground profile from the road profile for any section, – ykt (for all t ∈ T , k ∈ I): the block removal indicators, – bi (for all i ∈ S): binary variables that ensure that no roadside stockpiling will occur.  4.1.3  Design parameters  The design parameters for the MILP are – m: the number of spline segments, – ng (for all g ∈ G): the number of sections per spline segment, – sg,i (for all g ∈ G, i ∈ Sg ): the start and end points of the sections, – hg,i (for all g ∈ G, i ∈ Sg ): the average height of the ground for each section, – ui and ui (for all i ∈ S): the upper and lower bound of the variable ui , – L (respectively U ): the lower (respectively upper) bound of the slope, – HA (respectively HB ): the starting (respectively ending) elevation, – HA (respectively HB ): the starting (respectively ending) slope, – Hg,i ∈ H: the fixed points, – nz : the number of blocks, – Aki a ,Bikb (for all i ∈ S, ka ∈ {1, 2, ..., ki+ }, kb ∈ {1, 2, ..., ki− }): area list for side-slope approximation, – pi , qj , and crij (for all i ∈ S, j ∈ {i − 1, i + 1}): excavation, embankment, and hauling costs for a section, – cbi and cw j (for all i ∈ B, j ∈ W): borrow and waste costs, and – the locations of the borrow pits, the waste pits, the blocks, and the access roads.  63  4.2. Model description  4.2  Model description  4.2.1  Objective function  The objective of this problem is to find a vertical alignment such that total excavation, embankment, and hauling cost will be minimized. The objective function can be written as (pi Vi+ + qi Vi− ) +  min i∈S  r r (cri,i−1 fi,i−1,t + cri,i+1 fi,i+1,t ) t∈T i∈S  cbj  + j∈B  b (fj,ϑ(j)−1,t  b + fj,ϑ(j)+1,t )+  t∈T  w w (fϕ(k)−1,k,t + fϕ(k)+1,k,t ).  cw k k∈W  t∈T  (4.1)  4.2.2  Flow constraints  The transit nodes are virtual points that provide transits for the flows. Therefore, the sum of the flows coming to a transit node must be equal to the sum of the flows leaving the node, i.e., for all t ∈ T , i ∈ S, the flow constraints for the east transit nodes are r u fi−1,i,t + fi,i+1,t +  b r l fj,i+1,t = fi,i+1,t + fi−1,i,t + j∈B ϑ(j)=i  w fi−1,k,t ,  (4.2a)  w . fi+1,k,t  (4.2b)  k∈W ϕ(k)=i  and for the west transit nodes are r u fi+1,i,t + fi,i−1,t +  b r l fj,i−1,t = fi,i−1,t + fi+1,i,t + j∈B ϑ(j)=i  4.2.3  k∈W ϕ(k)=i  Balance constraints  The section nodes act as the sources and sinks for the flows. So, the total of unload flows from a section is equal to the cut volume of that section, i.e., for all i ∈ S, u u (fi,i−1,t + fi,i+1,t ) = Vi+ , (4.3a) t∈T  and the total of load flows to a section is equal to the fill volume i.e., for all i ∈ S, l l (fi−1,i,t + fi+1,i,t ) = Vi− .  (4.3b)  t∈T  64  4.2. Model description  4.2.4  Pit constraints  The borrow pits act as the sources of the flows with additional costs, and the waste pits act as the sinks of the flows with additional costs. The total of the borrow flows from a borrow pit must not exceed its capacity, i.e., for all j ∈ B, b b (fj,ϑ(j)−1,t + fj,ϑ(j)+1,t ) ≤ Cjb ,  (4.4a)  t∈T  and the total of waste flows to a waste pit must not exceed its capacity, i.e., for all k ∈ W, w w ) ≤ Ckw . (4.4b) + fϕ(k)+1,k,t (fϕ(k)−1,k,t t∈T  4.2.5  Block constraints  The block constraints must certify that no earth movement will occur over a block until the block is removed. We consider two cases for this constraints, namely a block with no borrow pit or waste pit with it and a block with a borrow and a waste pit with it. Using the two cases we write the block constraints for a general case. Theorem 4.2. (Case I) If a section i is a block with no borrow or waste pits asr l r l sociated with it, then for all t ∈ T , fi−1,i,t = fi−1,i,t and fi+1,i,t = fi+1,i,t will ensure that no earth movement will occur over section i. r l r l Proof. Since fi−1,i,t = fi−1,i,t and fi+1,i,t = fi+1,i,t , by Equations (4.2a) and r u r u (4.2a), fi,i+1,t = fi,i+1,t and fi,i−1,t = fi,i−1,t hold. Roadside stockpiling constraints ensure that one of Vi+ and Vi− will be 0. By Equations (4.3a) and (4.3b), r l r l r u one of fi−1,i,t = fi−1,i,t = fi+1,i,t = fi+1,i,t = 0 and fi,i−1,t = fi,i−1,t = r u fi,i+1,t = fi,i+1,t = 0 must hold. This means either a block will be embanked from both directions or it will be excavated to both directions, i.e., no earth movement will occur over the block.  Since no earth movement occurs until the block is removed, by Theorem 4.2, for all t ∈ T , k ∈ I, the constraints can be written (for this special case) as, r l − fς(k)−1,ς(k),t − fς(k)−1,ς(k),t ≤ M yk,t−1 ,  (4.5a)  r l fς(k)−1,ς(k),t − fς(k)−1,ς(k),t ≤ M yk,t−1 ,  (4.5b)  r l − fς(k)+1,ς(k),t − fς(k)+1,ς(k),t ≤ M yk,t−1 ,  (4.5c) 65  4.2. Model description l r ≤ M yk,t−1 , − fς(k)+1,ς(k),t fς(k)+1,ς(k),t  (4.5d)  Theorem 4.3. (Case II) If a section i is a block with a borrow pit j and a waste pit k associated with it, then for all t ∈ T , b,1 w,1 r l fi−1,i,t + fj,i+1,t = fi−1,i,t + fi−1,k,t , w,2 b,2 r u fi,i+1,t + fi−1,k,t = fi,i+1,t + fj,i+1,t , b,1 w,1 r l fi+1,i,t + fj,i−1,t = fi+1,i,t + fi+1,k,t , and w,2 b,2 r u fi,i−1,t + fi+1,k,t = fi,i−1,t + fj,i−1,t  will ensure that no earth movement will occur over section i where b,1 b,2 b fj,i+1,t + fj,i+1,t = fj,i+1,t , w,2 w,1 w , = fi−1,k,t + fi−1,k,t fi−1,k,t b,1 b,2 b fj,i−1,t + fj,i−1,t = fj,i−1,t , and w,1 w,2 w fi+1,k,t + fi+1,k,t = fi+1,k,t .  Proof. For a block with a borrow pit and a waste pit, the borrow and waste flows are divided into two flows. Since roadside stockpiling constraints ensure that one of l l Vi+ and Vi− will be 0, by Equations (4.3a) and (4.3b), one of fi−1,i,t = fi+1,i,t =0 b,1 w,1 u u r and fi,i−1,t = fi,i+1,t = 0 must hold. So, either fi−1,i,t + fj,i+1,t = fi−1,k,t b,2 w,2 b,1 w,1 r r r = fj,i+1,t and fi,i−1,t + or fi,i+1,t + fi−1,k,t and fi+1,i,t + fj,i−1,t = fi+1,k,t w,2 b,2 fi+1,k,t = fj,i−1,t must hold. This means either a block can be embanked from both directions or excavated to both directions, i.e., no earth movement will occur over the block.  Since no earth movement occurs until the block is removed, by Theorem 4.3, for all t ∈ T , k ∈ I, the constraints can be written (for this special case) as, b,1 w,1 r l fς(k)−1,ς(k),t + fj,ς(k)+1,t − fς(k)−1,ς(k),t − fς(k)−1,j,t ≥ −M yk,t−1 ,  (4.5e)  b,1 w,1 r l fς(k)−1,ς(k),t + fj,ς(k)+1,t − fς(k)−1,ς(k),t − fς(k)−1,j,t ≤ M yk,t−1 ,  (4.5f)  w,2 b,2 r u fς(k),ς(k)+1,t + fς(k)−1,j,t − fς(k),ς(k)+1,t − fj,ς(k)+1,t ≥ −M yk,t−1 ,  (4.5g) 66  4.2. Model description b,2 w,2 u r − fj,ς(k)+1,t ≤ M yk,t−1 , + fς(k)−1,j,t − fς(k),ς(k)+1,t fς(k),ς(k)+1,t  (4.5h)  w,1 b,1 l r − fς(k)+1,j,t ≥ −M yk,t−1 , + fj,ς(k)−1,t − fς(k)+1,ς(k),t fς(k)+1,ς(k),t  (4.5i)  w,1 b,1 l r − fς(k)+1,j,t ≤ M yk,t−1 , + fj,ς(k)−1,t − fς(k)+1,ς(k),t fς(k)+1,ς(k),t  (4.5j)  b,2 w,2 u r − fj,ς(k)−1,t ≥ −M yk,t−1 , + fς(k)+1,j,t − fς(k),ς(k)−1,t fς(k),ς(k)−1,t  (4.5k)  b,2 w,2 u r − fj,ς(k)−1,t ≤ M yk,t−1 . + fς(k)+1,j,t − fς(k),ς(k)−1,t fς(k),ς(k)−1,t  (4.5l)  By Theorems 4.2 and 4.3, for all t ∈ T , k ∈ I, the constraints can be written (for the general case) as, b,1 l fj,ς(k)+1,t −fς(k)−1,ς(k),t −  r fς(k)−1,ς(k),t + j∈B ϑ(j)=ς(k)  w,1 fς(k)−1,j,t ≥ −M yk,t−1 , j∈W ϕ(j)=ς(k)  (4.5m) w,1 fς(k)−1,j,t ≤ M yk,t−1 ,  b,1 l fj,ς(k)+1,t − fς(k)−1,ς(k),t −  r fς(k)−1,ς(k),t + j∈B ϑ(j)=ς(k)  j∈W ϕ(j)=ς(k)  (4.5n) w,2 u fς(k)−1,j,t −fς(k),ς(k)+1,t −  r fς(k),ς(k)+1,t + j∈W ϕ(j)=ς(k)  b,2 fj,ς(k)+1,t ≥ −M yk,t−1 , j∈B ϑ(j)=ς(k)  w,2 u fς(k)−1,j,t − fς(k),ς(k)+1,t −  r fς(k),ς(k)+1,t + j∈W ϕ(j)=ς(k)  b,2 fj,ς(k)+1,t j∈B ϑ(j)=ς(k)  b,1 l fj,ς(k)−1,t −fς(k)+1,ς(k),t −  r fς(k)+1,ς(k),t + j∈B ϑ(j)=ς(k)  w,1 fς(k)+1,j,t  j∈B ϑ(j)=ς(k)  w,1 fς(k)+1,j,t  j∈W ϕ(j)=ς(k)  b,2 fj,ς(k)−1,t  j∈W ϕ(j)=ς(k)  (4.5r) ≥ −M yk,t−1 ,  j∈B ϑ(j)=ς(k)  w,2 u fς(k)+1,j,t − fς(k),ς(k)−1,t −  r fς(k),ς(k)−1,t +  (4.5q) ≤ M yk,t−1 ,  j∈W ϕ(j)=ς(k)  w,2 u fς(k)+1,j,t −fς(k),ς(k)−1,t −  r fς(k),ς(k)−1,t +  (4.5p) ≥ −M yk,t−1 ,  j∈W ϕ(j)=ς(k)  b,1 l fj,ς(k)−1,t − fς(k)+1,ς(k),t −  r fς(k)+1,ς(k),t +  (4.5o) ≤ M yk,t−1 ,  b,2 fj,ς(k)−1,t  (4.5s) ≤ M yk,t−1 .  j∈B ϑ(j)=ς(k)  (4.5t)  67  4.2. Model description Since the flows from borrow pits and waste pits, which are associated with blocks, are divided into two flows each, for all t ∈ T , j ∈ B, k ∈ I, ϑ(j) = ς(k), b,1 b,2 b fj,i+1,t + fj,i+1,t = fj,i+1,t ,  (4.5u)  b,1 b,2 b , fj,i−1,t + fj,i−1,t = fj,i−1,t  (4.5v)  and for all t ∈ T , j ∈ W, k ∈ I, ϕ(j) = ς(k), w,1 w,2 w fi−1,k,t + fi−1,k,t = fi−1,k,t ,  (4.5w)  w,1 w,2 w fi+1,k,t + fi+1,k,t = fi+1,k,t .  (4.5x)  The block constraints must also ensure that no earth movement will occur among sections, borrow pits, and waste pits between two blocks, before the first block, or after the last block with no access roads until the block is removed. So, there will be no transit flow between two blocks with no access roads until one of the blocks 2 is removed, i.e., for all t ∈ T , (k1 , k2 ) ∈ I , ς(k1 ) ≤ i, i + 1 ≤ ς(k2 ), r fi,i+1,t ≤ M (yk1 ,t−1 + yk2 ,t−1 ),  (4.6a)  r fi+1,i,t ≤ M (yk1 ,t−1 + yk2 ,t−1 ).  (4.6b)  There will also be no transit flow after the last block with no access road until the block is removed, i.e., for all t ∈ T , ς(k) ≤ i, i + 1 ≤ n, k ∈ I → , r fi,i+1,t ≤ M yk,t−1 ,  (4.6c)  r fi+1,i,t ≤ M yk,t−1 ,  (4.6d)  and before the first block with no access road until the block is removed, i.e., for all t ∈ T , 1 ≤ i, i + 1 ≤ ς(k), k ∈ I ← , r fi,i+1,t ≤ M yk,t−1 ,  (4.6e)  r fi,i+1,t ≤ M yk,t−1 .  (4.6f)  There will be no borrow flow between two blocks with no access roads until one 2 of the blocks is removed, i.e., for all t ∈ T , (k1 , k2 ) ∈ I , ς(k1 ) ≤ ϑ(i) − 1, ϑ(i), ϑ(i) + 1 ≤ ς(k2 ), b fi,ϑ(i)+1,t ≤ M (yk1 ,t−1 + yk2 ,t−1 ).  (4.6g)  b fi,ϑ(i)−1,t ≤ M (yk1 ,t−1 + yk2 ,t−1 ).  (4.6h) 68  4.2. Model description There will also be no borrow flow after the last block with no access road until the block is removed, i.e., for all t ∈ T , ς(k) ≤ ϑ(i) − 1, ϑ(i), ϑ(i) + 1 ≤ n, k ∈ I → , b ≤ M yk,t−1 , fi,ϑ(i)+1,t  (4.6i)  b ≤ M yk,t−1 , fi,ϑ(i)−1,t  (4.6j)  and before the first block with no access road until the block is removed, i.e., for all t ∈ T , 1 ≤ ϑ(i) − 1, ϑ(i), ϑ(i) + 1 ≤ ς(k), k ∈ I ← , b ≤ M yk,t−1 , fi,ϑ(i)+1,t  (4.6k)  b fi,ϑ(i)−1,t ≤ M yk,t−1 .  (4.6l)  There will be no waste flow between two blocks with no access roads until one 2 of the blocks is removed, i.e., for all t ∈ T , (k1 , k2 ) ∈ I , ς(k1 ) ≤ ϕ(i) − 1, ϕ(i), ϕ(i) + 1 ≤ ς(k2 ), w fϕ(i)+1,i,t ≤ M (yk1 ,t−1 + yk2 ,t−1 ),  (4.6m)  w fϕ(i)−1,i,t ≤ M (yk1 ,t−1 + yk2 ,t−1 ).  (4.6n)  There will also be no waste flow after the last block with no access road until the block is removed, i.e., for all t ∈ T , ς(k) ≤ ϕ(i) − 1, ϕ(i), ϕ(i) + 1 ≤ n, k ∈ I → , w fϕ(i)+1,i,t ≤ M yk,t−1 ,  (4.6o)  w fϕ(i)−1,i,t ≤ M yk,t−1 ,  (4.6p)  and before the first block with no access road until the block is removed, i.e., for all t ∈ T , 1 ≤ ϕ(i) − 1, ϕ(i), ϕ(i) + 1 ≤ ς(k), k ∈ I ← , w fϕ(i)+1,i,t ≤ M yk,t−1 ,  (4.6q)  w fϕ(i)+1,i,t ≤ M yk,t−1 ,  (4.6r)  The block removal indicator constraints ensure that when the required amount of earth is excavated from or embanked to a section with a block, then the block is considered removed. Similar to the model of Section 3.3, for all k ∈ I, t ∈ T , the + + following constraints ensure that Wkt = ykt Vς(k) , + + Wkt ≤ Mς(k) ykt ,  (3.12i)  + Wkt + Wkt + Wkt  (3.12j)  ≤ ≥  + Vς(k) , + Vς(k) −  ≥ 0,  + Mς(k) (1  − ykt ),  (3.12k) (3.12l) 69  4.2. Model description − − and the following constraints assure that Wkt = ykt Vς(k) , − − Wkt ≤ Mς(k) ykt ,  (3.12m)  − − Wkt ≤ Vς(k) ,  (3.12n)  − − − Wkt ≥ Vς(k) − Mς(k) (1 − ykt ),  (3.12o)  − Wkt  (3.12p)  ≥ 0.  So, for all k ∈ I, t ∈ T , the block removal indicator constraints can be written as u u u fς(k),ς(k)−1,t + fς(k),ς(k)+1,t + t=1  w fj,t  + , ≥ Wkt  (4.7)  b fj,t  − ≥ Wkt .  (4.8)  j∈W ϕ(j)=ς(k)  u l l fς(k)−1,ς(k),t + fς(k)+1,ς(k),t + t=1  j∈B ϑ(j)=ς(k)  + − In this model, we redefine these constraints so that the Wkt and Wkt (for all k ∈ I, t ∈ T ) variables are no longer needed. For all k ∈ I, u ∈ T , these constraints can be written as,  u u u fς(k),ς(k)−1,t + fς(k),ς(k)+1,t + t=1  w fj,t  + + , (1 − yku ) ≥ Vς(k) + Mς(k)  j∈W ϕ(j)=ς(k)  (4.9a)  u l l fς(k)−1,ς(k),t + fς(k)+1,ς(k),t + t=1  b fj,t  − − . (1 − yku ) ≥ Vς(k) + Mς(k)  j∈B ϑ(j)=ς(k)  (4.9b) It should be noted that Equations (4.9a) and (4.9b) are logically equivalent to Equations (3.12i) to (3.12p) and (4.7) to (4.8). The remaining block constraints are the same as Section 3.3, i.e., for all t ∈ T \{nz + 1}, ykt ≥ t,  (3.12s)  k∈I  and for all k ∈ I, t ∈ T \{nz + 1}, yk,(t+1) ≥ yk,t .  (3.12t)  70  4.2. Model description  4.2.6  Other constraints  The following constraints are exactly the same as in Section 3.3: roadside stockpiling constraints, volume constraints, gap constraints, slope constraints, smoothness constraints, and fixed-point constraints.  4.2.7  Bounds  The bounds for the decision variables are, for all i ∈ N , t ∈ T , r fi,i−1,t ≥ 0,  (4.10)  r fi,i+1,t l fi−1,i,t l fi+1,i,t u fi,i−1,t u fi,i+1,t  ≥ 0,  (4.11)  ≥ 0,  (4.12)  ≥ 0,  (4.13)  ≥ 0,  (4.14)  ≥ 0,  (4.15)  for all j ∈ B, t ∈ T , b fj,ϑ(j)−1,t ≥ 0,  (4.16)  b fj,ϑ(j)+1,t ≥ 0,  (4.17)  w fϕ(k)−1,k,t ≥ 0,  (4.18)  w fϕ(k)+1,k,t ≥ 0,  (4.19)  for all k ∈ W, t ∈ T  for all k ∈ I, t ∈ T , ykt ∈ {0, 1},  (3.20b)  ui ≤ ui ≤ ui ,  (3.20c)  for all i ∈ S,  0≤ 0≤  Vi+ Vi−  ≤ ≤  Mi+ , Mi− ,  (3.20d) (3.20e)  and for all g ∈ G, k ∈ {1, 2, 3}, ag,k ∈ R.  (3.20f) 71  4.3. Model summary  4.3  Model summary  The summary of the quasi-network-flow model for the vertical alignment design considering blocks and side-slopes is stated below.  4.3.1  Objective function  min  (pi Vi+ + qi Vi− ) +  r r (cri,i−1 fi,i−1,t + cri,i+1 fi,i+1,t ) t∈T i∈S  i∈S  j∈B  t∈T  w w ). + fϕ(k)+1,k,t (fϕ(k)−1,k,t  cw k  b b )+ + fj,ϑ(j)+1,t (fj,ϑ(j)−1,t  cbj  +  k∈W  t∈T  (4.1)  4.3.2  Flow constraints  For all t ∈ T , i ∈ S, r u fi−1,i,t + fi,i+1,t +  b r l fj,i+1,t = fi,i+1,t + fi−1,i,t + j∈B ϑ(j)=i  r u fi+1,i,t + fi,i−1,t +  (4.2a)  w , fi+1,k,t  (4.2b)  k∈W ϕ(k)=i  b r l fj,i−1,t = fi,i−1,t + fi+1,i,t + j∈B ϑ(j)=i  4.3.3  w , fi−1,k,t  k∈W ϕ(k)=i  Balance constraints  For all i ∈ S, u u (fi,i−1,t + fi,i+1,t ) = Vi+ ,  (4.3a)  l l (fi−1,i,t + fi+1,i,t ) = Vi− .  (4.3b)  b b (fj,ϑ(j)−1,t + fj,ϑ(j)+1,t ) ≤ Cjb ,  (4.4a)  w w (fϕ(k)−1,k,t + fϕ(k)+1,k,t ) ≤ Ckw .  (4.4b)  t∈T  t∈T  4.3.4  Pit constraints  For all j ∈ B, t∈T  and for all k ∈ W, t∈T  72  4.3. Model summary  4.3.5  Block constraints  For all t ∈ T , k ∈ I, b,1 l fj,ς(k)+1,t −fς(k)−1,ς(k),t −  r fς(k)−1,ς(k),t + j∈B ϑ(j)=ς(k)  w,1 fς(k)−1,j,t ≥ −M yk,t−1 , j∈W ϕ(j)=ς(k)  (4.5m) w,1 fς(k)−1,j,t ≤ M yk,t−1 ,  b,1 l − fj,ς(k)+1,t − fς(k)−1,ς(k),t  r + fς(k)−1,ς(k),t j∈B ϑ(j)=ς(k)  j∈W ϕ(j)=ς(k)  (4.5n) w,2 u fς(k)−1,j,t −fς(k),ς(k)+1,t −  r fς(k),ς(k)+1,t + j∈W ϕ(j)=ς(k)  b,2 fj,ς(k)+1,t ≥ −M yk,t−1 , j∈B ϑ(j)=ς(k)  (4.5o) b,2 fj,ς(k)+1,t ≤ M yk,t−1 ,  w,2 u fς(k)−1,j,t − fς(k),ς(k)+1,t −  r fς(k),ς(k)+1,t + j∈W ϕ(j)=ς(k)  j∈B ϑ(j)=ς(k)  b,1 l fj,ς(k)−1,t −fς(k)+1,ς(k),t −  r fς(k)+1,ς(k),t + j∈B ϑ(j)=ς(k)  w,1 fς(k)+1,j,t j∈W ϕ(j)=ς(k)  b,1 l fj,ς(k)−1,t − fς(k)+1,ς(k),t −  r fς(k)+1,ς(k),t + j∈B ϑ(j)=ς(k)  w,1 fς(k)+1,j,t  j∈W ϕ(j)=ς(k)  (4.5r) b,2 fj,ς(k)−1,t ≥ −M yk,t−1 , j∈B ϑ(j)=ς(k)  (4.5s) b,2 fj,ς(k)−1,t ≤ M yk,t−1 .  w,2 u fς(k)+1,j,t − fς(k),ς(k)−1,t −  r fς(k),ς(k)−1,t +  (4.5q) ≤ M yk,t−1 ,  j∈W ϕ(j)=ς(k)  w,2 u fς(k)+1,j,t −fς(k),ς(k)−1,t −  r fς(k),ς(k)−1,t +  (4.5p) ≥ −M yk,t−1 ,  j∈W ϕ(j)=ς(k)  j∈B ϑ(j)=ς(k)  (4.5t) 2  for all t ∈ T , (k1 , k2 ) ∈ I , ς(k1 ) ≤ i, i + 1 ≤ ς(k2 ), r fi,i+1,t ≤ M (yk1 ,t−1 + yk2 ,t−1 ),  (4.6a)  r fi+1,i,t ≤ M (yk1 ,t−1 + yk2 ,t−1 ),  (4.6b)  for all t ∈ T , ς(k) ≤ i, i + 1 ≤ n, k ∈ I → , r fi,i+1,t ≤ M yk,t−1 ,  (4.6c)  r fi+1,i,t ≤ M yk,t−1 ,  (4.6d) 73  4.3. Model summary for all t ∈ T , 1 ≤ i, i + 1 ≤ ς(k), k ∈ I ← , r fi,i+1,t ≤ M yk,t−1 ,  (4.6e)  r fi,i+1,t ≤ M yk,t−1 ,  (4.6f)  2  for all t ∈ T , (k1 , k2 ) ∈ I , ς(k1 ) ≤ ϑ(i) − 1, ϑ(i), ϑ(i) + 1 ≤ ς(k2 ), b ≤ M (yk1 ,t−1 + yk2 ,t−1 ), fi,ϑ(i)+1,t  (4.6g)  b ≤ M (yk1 ,t−1 + yk2 ,t−1 ), fi,ϑ(i)−1,t  (4.6h)  for all t ∈ T , ς(k) ≤ ϑ(i) − 1, ϑ(i), ϑ(i) + 1 ≤ n, k ∈ I → , b fi,ϑ(i)+1,t ≤ M yk,t−1 ,  (4.6i)  b fi,ϑ(i)−1,t ≤ M yk,t−1 ,  (4.6j)  for all t ∈ T , 1 ≤ ϑ(i) − 1, ϑ(i), ϑ(i) + 1 ≤ ς(k), k ∈ I ← , b fi,ϑ(i)+1,t ≤ M yk,t−1 ,  (4.6k)  b fi,ϑ(i)−1,t ≤ M yk,t−1 ,  (4.6l)  2  for all t ∈ T , (k1 , k2 ) ∈ I , ς(k1 ) ≤ ϕ(i) − 1, ϕ(i), ϕ(i) + 1 ≤ ς(k2 ), w fϕ(i)+1,i,t ≤ M (yk1 ,t−1 + yk2 ,t−1 ).  (4.6m)  w fϕ(i)−1,i,t ≤ M (yk1 ,t−1 + yk2 ,t−1 ).  (4.6n)  for all t ∈ T , ς(k) ≤ ϕ(i) − 1, ϕ(i), ϕ(i) + 1 ≤ n, k ∈ I → , w fϕ(i)+1,i,t ≤ M yk,t−1 ,  (4.6o)  w fϕ(i)−1,i,t ≤ M yk,t−1 ,  (4.6p)  for all t ∈ T , 1 ≤ ϕ(i) − 1, ϕ(i), ϕ(i) + 1 ≤ ς(k), k ∈ I ← , w fϕ(i)+1,i,t ≤ M yk,t−1 ,  (4.6q)  w fϕ(i)+1,i,t ≤ M yk,t−1 ,  (4.6r)  for all t ∈ T , j ∈ B, k ∈ I, ϑ(j) = ς(k), b,1 b,2 b fj,i+1,t + fj,i+1,t = fj,i+1,t ,  (4.5u) 74  4.3. Model summary b,1 b,2 b fj,i−1,t + fj,i−1,t = fj,i−1,t ,  (4.5v)  for all t ∈ T , j ∈ W, k ∈ I, ϕ(j) = ς(k), w,1 w,2 w fi−1,k,t + fi−1,k,t = fi−1,k,t ,  (4.5w)  w,1 w,2 w fi+1,k,t + fi+1,k,t = fi+1,k,t ,  (4.5x)  for all k ∈ I, u ∈ T , u + + w fj,t ) + Mς(k) (1 − yku ) ≥ Vς(k) , (4.9a)  u u + + fς(k),ς(k)+1,t (fς(k),ς(k)−1,t t=1  j∈W ϕ(j)=ς(k)  u − − b , (4.9b) (1 − yku ) ≥ Vς(k) fj,t ) + Mς(k)  l l (fς(k)−1,ς(k),t + fς(k)+1,ς(k),t + t=1  j∈B ϑ(j)=ς(k)  for all t ∈ T \{nz + 1}, ykt ≥ t,  (3.12s)  k∈I  and for all k ∈ I, t ∈ T \{nz + 1}, yk,(t+1) ≥ yk,t .  4.3.6  (3.12t)  Volume constraints k−  k+  Given 0 < A1i < A2i < ... < Ai i and 0 < Bi1 < Bi2 < ... < Bi i , for ka ∈ {1, 2, ..., ki+ } ka −1  ka −1  Aki uki + Aki a  Vi+ ≥ k=1  uki  ui −  ,  (3.13q)  k=1  and for kb ∈ {1, 2, ..., ki− } kb −1  Vi+  kb −1  Bik uki  ≥− k=1  −  Bikb  uki  ui −  .  (3.13r)  k=1  75  4.3. Model summary  4.3.7  Roadside stockpiling constraints  If the end-user prefers accuracy over speed, then for all i ∈ S, Vi+ ≤ M bi ,  (3.14a)  Vi+ Vi−  (3.14b)  ≥  δi+ bi ,  ≤ M (1 − bi ),  (3.14c)  otherwise, for all i ∈ S,  4.3.8  Vi+ ≤ M bi ,  (3.15a)  Vi+ Vi− Vi−  ≥ δbi ,  (3.15b)  ≤ M (1 − bi ),  (3.15c)  ≥ δ(1 − bi ).  (3.15d)  Gap constraints  For all g ∈ G, i ∈ Sg , hg,i − ag,3  4.3.9  sg,i+1 + sg,i (sg,i+1 )2 + sg,i+1 sg,i + (sg,i )2 − ag,2 − ag,1 = uκ(g,i) . 3 2 (3.16)  Slope constraints  For all g ∈ G, i ∈ {1, ng }, L ≤ ag,2 + 2ag,3 sg,i ≤ U .  4.3.10  (3.17)  Smoothness constraints  For all g ∈ G\{1}, ag,1 + ag,2 sg,1 + ag,3 s2g,1 = a(g−1),1 + a(g−1),2 sg,1 + a(g−1),3 s2g,1 ,  (3.18a)  ag,2 + 2ag,3 sg,1 = a(g−1),2 + 2a(g−1),3 sg,1 .  (3.18b)  4.3.11  Fixed point constraints  a1,1 + a1,2 s1,1 + a1,3 s21,1 = yA , am,1 + am,2 sm,nm +  am,3 s2m,nm  (3.19a) = yB ,  (3.19b) 76  4.3. Model summary for all Hg,i ∈ H ag,1 + ag,2 sg,i + ag,3 s2g,i = Hg,i ,  (3.19c)  and  4.3.12  a1,2 + 2a1,3 s1,1 = HA ,  (3.19d)  am,2 + 2am,3 sm,nm = HB .  (3.19e)  Bounds  For all i ∈ N , t ∈ T , r fi,i−1,t ≥ 0,  (4.10)  r fi,i+1,t l fi−1,i,t l fi+1,i,t u fi,i−1,t u fi,i+1,t  ≥ 0,  (4.11)  ≥ 0,  (4.12)  ≥ 0,  (4.13)  ≥ 0,  (4.14)  ≥ 0,  (4.15)  for all j ∈ B, t ∈ T , b fj,ϑ(j)−1,t ≥ 0,  (4.16)  b fj,ϑ(j)+1,t ≥ 0,  (4.17)  w fϕ(k)−1,k,t ≥ 0,  (4.18)  w fϕ(k)+1,k,t ≥ 0,  (4.19)  for all k ∈ W, t ∈ T  for all k ∈ I, t ∈ T , ykt ∈ {0, 1},  (3.20b)  + −h− i ≤ ui ≤ hi ,  (3.20c)  for all i ∈ S,  0≤ 0≤  Vi+ Vi−  ≤ ≤  Mi+ , Mi− ,  (3.20d) (3.20e)  and for all g ∈ G, k ∈ {1, 2, 3}, ag,k ∈ R.  (3.20f) 77  4.4. Model evaluation  4.4  Model evaluation  Proposition 4.4. The MILP of Section 4.3 has O(nnz ) continuous variables. Proof. The MILP has n variables for excavation volume, n variables for embankment volume, (2n + 2)(nz + 1) transit flow variables, 4n(nz + 1) variables for load and unload flow for sections, 4nb (nz + 1) borrow flow variables in the worst case, 4nw (nz + 1) waste flow variables in the worst case, 3m variables for the spline coefficients, n variables for section height. So, the total number of continuous variables is n + n + (2n + 2)(nz + 1) + 4n(nz + 1) + 4nb (nz + 1) +4nw (nz + 1) + 3m + n = 3n + 3m + (6n + 2 + 4nb + 4nw )(nz + 1) ≤ 6n + (6n + n + 4n + 4n)(nz + nz ) = 6n + 30nnz since n ≥ nb , n ≥ nw , and n ≥ m and assuming n ≥ 2 and nz ≥ 1. Proposition 4.5. The MILP of Section 4.3 has O(n2z + n) binary variables. Proof. The total number of binary variables is nz (nz + 1) + n ≤ 2n2z + n assuming nz ≥ 1. Proposition 4.6. The MILP of Section 4.3 has O(nn3z ) constraints. Proof. The number of constraints created by different equations of this model are shown in Table 4.1. The total number of constraints is O(nn3z ).  78  4.4. Model evaluation  Equation (4.2a),(4.2b) (4.3a),(4.3b) (4.4a),(4.4b) From (4.5m) to (4.5x) (4.6a), (4.6b) (4.6c), (4.6d) (4.6e), (4.6f) From (4.6g) to (4.6l) From (4.6m) to (4.6r) (4.9a), (4.9b) (3.12s) (3.12t) (3.13q), (3.13r) From (3.14a) to (3.14c) From (3.14a) to (3.14c) (3.16) (3.17) (3.18a), (3.18a) From (3.19a) to (3.19e)  Number of Constraints (worst case) 2n(nz + 1) 2n nb + nw 8nz (nz + 1) + 2(nb + nw )(nz + 1) 2(n − 1)(nz + 1) nz (n2z −1) 2nz (n − 1)(nz + 1) 2nz (n − 1)(nz + 1) 2(nb − 2)(nz + 1) nz (n2z −1) + 4nz (nb − 2)(nz + 1) 2(nw − 2)(nz + 1) nz (n2z −1) + 4nz (nw − 2)(nz + 1) 2n(nz + 1) nz n2z + − i∈S (ki + ki ) 3n 4n n 2m 2(m − 1) 4 + |H|  Table 4.1: Number of constraints created by different equations of the quasinetwork-flow model  79  Chapter 5  Numerical Results However beautiful the strategy, you should occasionally look at the results. Winston Churchill (1874 - 1965) This thesis explains two novel models of vertical alignment, namely a basic MILP model and a quasi-network-flow model. The basic MILP model is the composition of Moreb’s vertical alignment model [Mor09] with Koch and Lucet’s improvements [KL10] and the earthwork block removal model of Hare, Koch, and Lucet [HKL11]. In addition, the basic MILP model introduces a novel way of formulating the side-slopes of the roads. So, for this model, we seek the answers to the following questions. – How does the basic MILP model of vertical alignment performs in terms of robustness and accuracy compared to Moreb’s model for vertical alignment? – Can we numerically analyze the behavior of the design parameters ki+ , ki− , and ng , which we believe to be critical to the model, and suggest a good values for these parameters? The rationalization for finding a new model is that the basic MILP model starts performing badly as the number of sections increases, since the number of continuous variables is quadratically related to the number of sections. We therefore introduce the quasi-network-flow model. So, for this model, we want to ask the following questions. – How fast can it solve the problems compared to the basic MILP model? – Can it maintain the same objective value as the basic MILP model? In this chapter, we explore these questions numerically.  80  5.1. Experimental equipments Table 5.1: The basic problem set showing the roads, their fixed length for all test problems, and their fixed section length for most of the test problems Road A B C D E F G  5.1  Length (km) 1 5 2 3 15 20 9  Section Length (m) 20 100 20 20 100 100 20  Number of Sections 50 50 100 150 150 200 450  Experimental equipments  The experiments in this chapter were performed in a Dell OptiPlex 980 workstation with an Intel(R) Core(TM) i7-860 2.80GHz (6 cores) processor, a 16GB of Random Access Memory (RAM), and a 64-bit Windows 7 Enterprise operating system. An academic eddition of the IBM ILOG CPLEX Optimizer 12.2 (❤tt♣✿✴✴✇✇✇✳❝♣❧❡①✳❝♦♠) was used to solve the problems. CPLEX is a high performance MILP solver that can take advantage of the parallel architecture of the processor. The models were programmed in the basic C++ programming language, which was chosen because of its faster execution, platform independence, and easier integration with the CPLEX Optimizer. Microsoft Visual Studio Professional 2008 was used as the programming platform.  5.2  Basic problem set and parameters  For our experiments, we used 7 distinct road samples, which are provided by our industrial partner. The data for these roads were generated by their software, which is used by government and non-government road engineering industries of many countries. We denote these roads with letters from A to G. We generated our problem set by changing different parameters of these roads. However, these roads have fixed section length and number of sections for all the problems. Table 5.1 shows the basic information of these roads. Moreover, all the experiments have the following parameters, – Relative MIP gap tolerance: 1%, – LP feasibility tolerance: 10−06 , – Maximum run time: 2 hrs for each core of the processor totaling 12 hrs, 81  5.3. Test configuration 1 – Upper bound for slope change: 0.5, – Lower bound for slope change: −0.5, – Maximum fill height: 10m, – Maximum cut height: 10m. Other solver and model parameters remain at the default settings.  5.3  Test configuration 1  In this test configuration, we compared the basic MILP model with Moreb’s vertical alignment model in terms of robustness and accuracy. Moreb’s vertical alignment model uses rectangular approximation for calculating the volume of a section as written in Equation (2.9f). Since the height of a section is a design variable, the appropriate approximation of the volume is highly dependent on the choice of area of a section for Moreb’s model. But, as the height changes, so does the appropriate value of area. In other words, Moreb’s vertical alignment model can be very accurate if we can predict the height for each section before solving the model. However, if the prediction of heights is far from the actual calculated heights, then Moreb’s model can produce very bad results. This behavior makes the model very unstable. To deal with this issue, two strategies are used currently. The most common strategy is to assume that the output road profile will be very close to the input ground profile. Of course, assuming this will bias the optimizer to choose a solution close to the ground profile. While this strategy may perform well for some examples, for other examples it may perform poorly. We call this approach the Near Ground Moreb (NGM) approach. The second approach is to predict the height to be the half way to the maximum height for both cuts and fills. The quality of this approach also depends on the initial guess, but since the initial guess is the average of the extreme guesses, this approach should not perform really bad, at the same time, we should not expect very good solution from it. We call this approach Average Moreb (AM) approach. Unlike Moreb’s model, the basic MILP model for vertical alignment does not depend on any initial guess. From Figures 3.3 and 3.4, we see that as the number of entries in the lookup table, ki+ (for a cut section i) and ki− (for a fill section i) increases, the approximate volume becomes the actual volume. In addition to comparing with the two variations of Moreb’s model, we also show the change in accuracy with respect to the change in the values for ki+ and ki− .  82  5.3. Test configuration 1 Table 5.2: Problem (R-k, where k is the number of cut and fill entries in the lookup table, AM or NGM for road R) set summary for Test configuration 1 Road  5.3.1  Problems  A  A-400, A-200, A-100, A-50, A-40, A-20, A-10, A-5, A-2, A-AM, A-NGM  B  B-400, B-200, B-100, B-50, B-40, B-20, B-10, B-5, B-2, B-AM, B-NGM  C  C-400, C-200, C-100, C-50, C-40, C-20, C-10, C-5, C-2, C-AM, C-NGM  D  D-400, D-200, D-100, D-50, D-40, D-20, D-10, D-5, D-2, D-AM, D-NGM  E  E-400, E-200, E-100, E-50, E-40, E-20, E-10, E-5, E-2, E-AM, E-NGM  F  F-400, F-200, F-100, F-50, F-40, F-20, F-10, F-5, F-2, F-AM, F-NGM  G  G-400, G-200, G-100, G-50, G-40, G-20, G-10, G-5, G-2, G-AM, G-NGM  Reference solution  The reference solution for the experiments should be models with sufficient large values for ki+ and ki− for all sections i. For the experiments of this test configuration, we use the basic MILP model with ki+ = ki− = 400 for all section i, as the reference solution.  5.3.2  Problem set and parameters  For each of the roads of Table 5.1, we generated 10 problems for 10 different values of ki+ and ki− , as well as 2 problems for the AM and NGM approaches. It should be noted that a basic MILP model with ki+ = ki− = 1 is the same as a model generated by the Average Moreb (AM) approach. Therefore, for this test configuration, we generated 11 problems for each of the 7 roads totaling 77 problems with the naming convention R-k, where R is a road from Table 5.1, for the basic MILP model k represents the value for ki+ and ki− for all sections i, and for Moreb’s model k represents AM or NGM. Table 5.2 summarizes the problem set. For this test configuration, the other parameters are, – number of sections per spline segment: ng = 2 for all g ∈ G, – number of blocks: nz = 0, – number of access roads: nr = 1. We add an access road to the first section for each of the problems, with an infinite borrow pit and an infinite waste pit to ensure feasibility.  83  5.3. Test configuration 1  5.3.3  Experiment procedure  We used the following three-steps procedure for each of the problems in Table 5.2 to calculate the accuracy. – In step 1, we solve the given model and save the output vertical alignment and the optimal cost. We denote the optimal cost of this step with CR,k . – In step 2, we generate a model with the same parameters as the given model except ki+ = ki− = 400, then we input the vertical alignment from step 1 to this model, and solve only for the earthwork operations. The optimal cost of this step is the optimal cost with the corrected volume for the vertical 400 . alignment of step 1. We denote this cost with CR,k – In step 3, we use the formulas relative error and |  R,k |  =  =  R,k  400 CR,k −CR,k 400 CR,k  400 |CR,k −CR,k | 400 CR,k  × 100% to get the percent  × 100% to get the percent absolute  relative error. We normalized the solution time with respect to the solution times with the model with ki+ = ki− = 400 to accommodate all the roads in the same graph. If tR,k is the required time for Road R with ki+ = ki− = k, then the normalized time is defined as tR,k =  5.3.4  tR,k . tR,400  (5.1)  Results  The raw results of the problem configuration are shown in Tables B.1, B.2, and B.3. A careful observation of the results reveal that depending on the values of ki+ and ki− the model can introduce significant errors. But, we wanted to know how the accuracy of the problems changes as the values of ki+ and ki− change, at the same time, we wanted to define a range for ki+ and ki− in which the solutions will be reasonably accurate. For this purpose, we define 3 ranges of accuracies of the solutions, i.e., – |  R,k |  ≤ 2% : accurate solution, since the relative MIP gap tolerance is 1%,  – 2% < | R,k | ≤ 5% : acceptable solution, since up to 5% error is acceptable to our users, and – |  R,k |  > 5% : unacceptable solution. 84  5.3. Test configuration 1  45  Road A Road B Road C Road D Road E Road F Road G  40  % Absolute Relative Error  35  30  25  20  15  10  5 2 0 NGM  AM  2  5  10  20  40  50  100  200  400  Number of cut and fill entries in the lookup table  Figure 5.1: Percent absolute relative error for NGM and AM approaches of Moreb’s model and the basic MILP model with different numbers of cut and fill entries in the lookup table  1.6 1.5 1.4 1.3 1.2  Normalized Time  1.1 1 0.9 0.8 0.7 0.6 0.5 0.4 Road A Road B Road C Road D Road E Road F Road G  0.3 0.2 0.1 0 NGM  AM  2  5  10  20  40  50  100  200  400  Number of cut and fill entries in the lookup table  Figure 5.2: Normalized time for NGM and AM approaches of Moreb’s model and the basic MILP model with different numbers of cut and fill entries in the lookup table  85  5.4. Test configuration 2 In Figure 5.1, we plot the percent absolute relative error for both NGM and AM approaches of Moreb’s model and the basic MILP model with different numbers of cut and fill entries in the lookup table. From the plot, we see that for all the roads both approaches for Moreb’s model generate errors that are unacceptable to our users. We also see that the error drops very quickly as we increase the number of entries in the lookup table and for all the roads the error stays in the acceptable range if we use more than 5 entries in the lookup table. We conclude that given a reasonable number of entries in the lookup table, the basic MILP model is robust and accurate. Similar to Figure 5.1, we plot the timing data in Figure 5.2. We see that both Moreb’s approaches require almost the same amount of time, which is expected since both of this approaches have the same number of variables and constraints. For each additional entries of the lookup table, 2n additional constraints are required. So, the timing should increase as we increase the number of entries in the lookup table.  5.4  Test configuration 2  In this test configuration, we analyzed the behavior of another design parameter of the basic MILP model called the number of sections per spline segment (ng for all g ∈ G), which we believed to be critical for the model.  5.4.1  Reference solution  Theoretically, the best value for ng , for all g ∈ G, is 1, since it gives the best objective value. The reason is ng = 1, for all g ∈ G, gives the model the most flexibility to move the road profile up and down. We set it as the reference solution.  5.4.2  Problem set and parameters  For each of the roads of Table 5.1, we generated problems for different values of ng . When generating these problems, we made sure that n was divisible by ng so that all the segments have the same number of sections. For this test configuration, we generated 51 problems with the naming convention R-ng , where R is a road from Table 5.1, and ng is the number of sections per segment, that are shown in Table 5.3. It should be noted that ng > 10 is rarely used, but we created some problems with higher ng values for demonstration purpose. The other parameters for this test configuration are, – number of entries in the lookup table: ki+ = ki− = 200 for all i, 86  5.4. Test configuration 2 Table 5.3: Problem (R-ng , where ng is the number of sections per segment for road R) set summary for Test configuration 2 Road  Problems  A  A-1, A-2, A-5, A-10, A-25  B  B-1, B-2, B-5, B-10, B-25  C  C-1, C-2, C-4, C-5, C-10, C-20, C-25  D  D-1, D-2, D-3, D-4, D-5, D-6, D-10, D-15, D-25  E  E-1, E-2, E-3, E-5, E-6, E-10, E-15, E-25  F  F-1, F-2, F-4, F-5, F-8, F-10, F-20, F-25  G  G-1, G-2, G-3, G-5, G-6, G-9, G-10, G-15, G-18, G-25  – number of blocks: nz = 0, – number of access roads: nr = 1.  5.4.3  Experiment procedure  From Test configuration 1, we see that models with ki+ = ki− = 200 will produce accurate enough solutions for practical use. So, for this test configuration we assume that all the solutions are accurate. Assuming that we want to know how the cost and timing changes with respect to the parameter ng . We normalized the solutions with respect to the reference solution to accommodate all the roads in the same graph. If CR,ng is the optimal cost for Road R with ng sections per segment, then the normalized cost is defined as, C R,ng =  CR,ng . CR,1  (5.2)  If tR,ng is the required time for Road R with ng sections per segment, then the normalized time is defined as, tR,ng =  5.4.4  tR,ng . tR,1  (5.3)  Results  The raw results of this test configuration, as well as, the calculated normalized cost and timing are shown in Table B.4. In Figure 5.3, we plot the change of normalized cost with respect to the number of sections per segment for each of the roads. As expected, we see that the cost continues to increase as the value of ng  87  5.4. Test configuration 2  16  Road A Road B Road C Road D Road E Road F Road G  14  Normalized Cost  12  10  8  6  4  2 1 1  2  3  4  5  6  8  10  15  18  20  25  Number of Sections per Segment  Figure 5.3: The change of normalized cost with respect to the number of sections per segment for each of the roads  16  Road A Road B Road C Road D Road E Road F Road G  15 14 13 12  Normalized Time  11 10 9 8 7 6 5 4 3 2 1 0  1  2  3  4  5  6  8  10  15  18  20  25  Number of Sections per Segment  Figure 5.4: The change of normalized time with respect to the number of sections per segment for each of the roads  88  5.5. Test configuration 3 increases, whereas the time behaves randomly. We conclude that the number of sections per spline segment should not exceed 2.  5.5  Test configuration 3  In this test configuration, we compare the performance of the quasi-networkflow model with respect to the basic MILP model. Since the quasi-network-flow model has O(nnz ) continuous variables compared to O(n2 nz ) continuous variables of the basic MILP model, we are expecting a significant improvement in timing. At the same time, we are expecting that both models will report the same optimal cost for the same problem.  5.5.1  Reference solution  Since we are comparing the performance of the quasi-network-flow model with respect to the basic MILP model, our reference solution is the basic MILP model for both timing and optimal cost.  5.5.2  Problem set and parameters  We add (5, 2), (5, 4), (10, 2), and (10, 4) number of (blocks, access roads) to each of the problems in Table 5.2 generating 280 problems with naming convention R-k, nz , nr , where R is a road, k = ki+ = ki− , nz is the number of blocks, and nr is the number of access roads. Table 5.4 shows the problem set. For the problems, the number of sections per spline segment is ng = 2 for all g ∈ G.  5.5.3  Experiment procedure  We solve the same problem with both models. For a problem R-k, nz , nr , we b denote the optimal cost of the basic MILP model with CR,k,n and that of the z ,nr n quasi-network-flow model with CR,k,nz ,nr . So, the percent difference in optimal cost is n b CR,k,n − CR,k,n z ,nr z ,nr δR,k,nz ,nr = × 100%. (5.4) b CR,k,n z ,nr Since the relative MIP gap tolerance is 1%, a δR,k,nz ,nr value between −2% and 2% implies that both models give the statistically equivalent optimal cost. For a problem R-k, nz , nr , we denote the timing of the basic MILP model with tbR,k,nz ,nr and that of the quasi-network-flow model with tnR,k,nz ,nr . Since theoretically tnR,k,nz ,nr ≤  89  5.5. Test configuration 3 Table 5.4: Problem (R-k, nz , nr , where k = ki+ = ki− , nz is the number of blocks, and nr is the number of access roads for road R) set summary for Test configuration 3 Road A  Problems A-400,5,2; A-200,5,2; A-100,5,2; A-50,5,2; A-40,5,2; A-20,5,2; A-10,5,2; A-5,5,2; A-2,5,2; A-1,5,2; A-400,10,2; A-200,10,2; A-100,10,2; A-50,10,2; A-40,10,2; A-20,10,2; A-10,10,2; A-5,10,2; A-2,10,2; A-1,10,2; A-400,5,4; A-200,5,4; A-100,5,4; A-50,5,4; A-40,5,4; A-20,5,4; A-10,5,4; A-5,5,4; A-2,5,4; A-1,5,4; A-400,10,4; A-200,10,4; A-100,10,4; A-50,10,4; A-40,10,4; A-20,10,4; A-10,10,4; A-5,10,4; A-2,10,4; A-1,10,4;  B  B-400,5,2; B-200,5,2; B-100,5,2; B-50,5,2; B-40,5,2; B-20,5,2; B-10,5,2; B-5,5,2; B-2,5,2; B-1,5,2; B-400,10,2; B-200,10,2; B-100,10,2; B-50,10,2; B-40,10,2; B-20,10,2; B-10,10,2; B-5,10,2; B-2,10,2; B-1,10,2; B-400,5,4; B-200,5,4; B-100,5,4; B-50,5,4; B-40,5,4; B-20,5,4; B-10,5,4; B-5,5,4; B-2,5,4; B-1,5,4; B-400,10,4; B-200,10,4; B-100,10,4; B-50,10,4; B-40,10,4; B-20,10,4; B-10,10,4; B-5,10,4; B-2,10,4; B-1,10,4;  C  C-400,5,2; C-200,5,2; C-100,5,2; C-50,5,2; C-40,5,2; C-20,5,2; C-10,5,2; C-5,5,2; C-2,5,2; C-1,5,2; C-400,10,2; C-200,10,2; C-100,10,2; C-50,10,2; C-40,10,2; C-20,10,2; C-10,10,2; C-5,10,2; C-2,10,2; C-1,10,2; C-400,5,4; C-200,5,4; C-100,5,4; C-50,5,4; C-40,5,4; C-20,5,4; C-10,5,4; C-5,5,4; C-2,5,4; C-1,5,4; C-400,10,4; C-200,10,4; C-100,10,4; C-50,10,4; C-40,10,4; C-20,10,4; C-10,10,4; C-5,10,4; C-2,10,4; C-1,10,4;  D  D-400,5,2; D-200,5,2; D-100,5,2; D-50,5,2; D-40,5,2; D-20,5,2; D-10,5,2; D-5,5,2; D-2,5,2; D-1,5,2; D-400,10,2; D-200,10,2; D-100,10,2; D-50,10,2; D-40,10,2; D-20,10,2; D-10,10,2; D-5,10,2; D-2,10,2; D-1,10,2; D-400,5,4; D-200,5,4; D-100,5,4; D-50,5,4; D-40,5,4; D-20,5,4; D-10,5,4; D-5,5,4; D-2,5,4; D-1,5,4; D-400,10,4; D-200,10,4; D-100,10,4; D-50,10,4; D-40,10,4; D-20,10,4; D-10,10,4; D-5,10,4; D-2,10,4; D-1,10,4;  E  E-400,5,2; E-200,5,2; E-100,5,2; E-50,5,2; E-40,5,2; E-20,5,2; E-10,5,2; E-5,5,2; E-2,5,2; E-1,5,2; E-400,10,2; E-200,10,2; E-100,10,2; E-50,10,2; E-40,10,2; E-20,10,2; E-10,10,2; E-5,10,2; E-2,10,2; E-1,10,2; E-400,5,4; E-200,5,4; E-100,5,4; E-50,5,4; E-40,5,4; E-20,5,4; E-10,5,4; E-5,5,4; E-2,5,4; E-1,5,4; E-400,10,4; E-200,10,4; E-100,10,4; E-50,10,4; E-40,10,4; E-20,10,4; E-10,10,4; E-5,10,4; E-2,10,4; E-1,10,4;  F  F-400,5,2; F-200,5,2; F-100,5,2; F-50,5,2; F-40,5,2; F-20,5,2; F-10,5,2; F-5,5,2; F-2,5,2; F-1,5,2; F-400,10,2; F-200,10,2; F-100,10,2; F-50,10,2; F-40,10,2; F-20,10,2; F-10,10,2; F-5,10,2; F-2,10,2; F-1,10,2; F-400,5,4; F-200,5,4; F-100,5,4; F-50,5,4; F-40,5,4; F-20,5,4; F-10,5,4; F-5,5,4; F-2,5,4; F-1,5,4; F-400,10,4; F-200,10,4; F-100,10,4; F-50,10,4; F-40,10,4; F-20,10,4; F-10,10,4; F-5,10,4; F-2,10,4; F-1,10,4;  G  G-400,5,2; G-200,5,2; G-100,5,2; G-50,5,2; G-40,5,2; G-20,5,2; G-10,5,2; G-5,5,2; G-2,5,2; G-1,5,2; G-400,10,2; G-200,10,2; G-100,10,2; G-50,10,2; G-40,10,2; G-20,10,2; G-10,10,2; G-5,10,2; G-2,10,2; G-1,10,2; G-400,5,4; G-200,5,4; G-100,5,4; G-50,5,4; G-40,5,4; G-20,5,4; G-10,5,4; G-5,5,4; G-2,5,4; G-1,5,4; G-400,10,4; G-200,10,4; G-100,10,4; G-50,10,4; G-40,10,4; G-20,10,4; G-10,10,4; G-5,10,4; G-2,10,4; G-1,10,4;  90  5.5. Test configuration 3  160 150 140 130 120  Number of Problems  110 100 90 80 70 60 50 40 30 20 10 0 Unsolved  0  5  10  15  20  25  30  35  40  45  50  55  60  65  70  75  80  85  90  95  100  % Improvement  Figure 5.5: A histogram showing the number of problems solved within different improvement range tbR,k,nz ,nr , we define the percent improvement in timing as ηR,k,nz ,nr =  tbR,k,nz ,nr − tnR,k,nz ,nr tbR,k,nz ,nr  × 100%.  (5.5)  We expect 0 ≤ ηR,k,nz ,nr ≤ 100 with a larger value implies larger improvement. A negative value for ηR,k,nz ,nr implies a negative improvement.  5.5.4  Results  The raw results of this test configuration are shown in Tables B.5, B.6, B.7, B.8, B.9, B.10, B.11, and B.12. In the tables, a problem name ending with an * denotes that the basic MILP model either terminated in the middle of the program execution because of insufficient memory i.e., no timing was recorded, or the solver could not solve the model within the given time limit. However, the tables records the best feasible solution value before it ran out of time or memory. In Figure 5.5, we show a histogram of the number of problems solved within different range of improvement in timing, as well as, the number of unsolved problems. From the data, we see that – the basic MILP model cannot solve 14 problems in the given time limit 91  5.6. Summary of the results and computer memory, whereas the quasi-network-flow model solves all the problems, – the quasi-network-flow model not only solves all the problems faster than the basic MILP model but also the improvement is significant for most of the problems, and – the problems that both model can solve are within the 2% of each other i.e., both models give statistically equivalent cost for all the problems.  5.6  Summary of the results  We can summarize the results of this chapter as follows. For all i, the parameters ki+ and ki− are critical for the accuracy of the model, and the recommended value is 5 or more. The timing can change from a factor of 0.1 to 1.5, but if the parameter value is less than 20, the solution time remains relatively unchanged. For all g ∈ G, the parameters ng are critical for finding the minimum cost, and the recommended value is 1. These parameters have random effects on solution time. The quasi-network-flow model is a noticeable improvement over the basic MILP model in regards to solution time. From our observation of the resource monitor of the computer, we suggest the users to run the basic MILP model on a work station with a larger computer memory and the quasi-network-flow model on a work station with higher computing power.  92  Chapter 6  Conclusion and Future Work The important thing is not to stop questioning, curiosity has its own reason for existing. Albert Einstein (1879 - 1955)  6.1  Conclusion  Since both Moreb’s vertical alignment model [Mor09] and Hare, Koch, and Lucet’s earthwork model with blocks [HKL11] are capable of satisfying most of the requirements of our clients, we have combined both ideas in a single model. The resulting model is the first model in this research area that can compute the vertical alignment considering blocks and access roads. We have further looked into possible improvements for this model. We have found that the model was generating substantial errors in the volume approximation from not considering the side-slopes of the roads. So, we have developed a novel way of implementing side-slopes using lookup table without significantly increasing the time complexity of the model. Finally, we have come up with a novel way of reducing the number of earth movement variables using the ideas from network flow algorithms. Similar idea has been implemented for the earthwork optimization problem in [HHLM12] and extended for vertical alignment in this thesis. We call the formulation a quasinetwork-flow model of vertical alignment.  6.2 6.2.1  Future work The dynamic block extension  The described models assume that no roadside stockpiling will occur. One possible extension is to change the models to allow roadside stockpiling. When too much roadside stockpiling occurs in a section, a temporary block may be created  93  6.2. Future work that did not previously exist. This type of block is called a dynamic block. One of the important future direction is to handle dynamic blocks in the model.  6.2.2  The multi-material extension  In a multi-material model of a vertical alignment, the different types of materials found in earth, which vary in cost and quality, are taken into account. Considering multiple materials provides a more realistic solution, because the cost of the material sometimes depends on the types of materials in the earth, and often some parts of the road require a specific material type for engineering reasons. In a multi-material model, every cut section has given volumes for all material types, which comes from the input ground profile, and every fill section has a user defined required volumes for all material types. We explored few types of multimaterial models, which are described briefly in this section. Exact multi-material model This simple form of multi-material model sub-divide the earth movement variables for each material. The discussed vertical alignment models of this thesis are easily extendable to this form. Moreb discussed this approach in [Mor09]. This approach gives impractical solutions, since it requires a considerable use of the borrow and waste pits for feasibility. This approach is not acceptable in the road design field. Quality based multi-material model This approach categorizes the materials into different levels of quality, and a higher quality material can be used in place of a lower quality material. This approach is more practical. There are two variations of this approach. – In the first variation, there is no minimum required material quality for a section. A section can accept any material at any amount, as long as their quality is better than or same as the required quality. – In the second variation, a minimum amount of each quality for each section is specified. After the minimum amount is provided, the section can accept materials of the same or better quality. Rule based multi-material model This is the most generic form of a multi-material model. Instead of defining the quality of the materials, this method defines some rules that must be followed 94  6.2. Future work for cutting and filling. The quality based multi-material model is an example of the rule based multi-material model, where the rule that a higher quality material can be used in place of a lower quality material with or without a minimum amount is enforced. Different rules requires different modeling techniques for this approach. For a detailed explanation of the multi-material extension we refer to [BRLH11], where we also show an earthwork implementation of the quality based multimaterial model with a required minimum amount. However, extending the earthwork multi-material model to a vertical alignment model is not trivial and is left for future research.  6.2.3  Other areas of improvement  Future research can be done on finding the optimal section length, reducing the number of binary variables, considering the cost of land, and incorporating retaining walls.  6.2.4  Horizontal alignment  The next step of the research is to model the horizontal alignment and simultaneously optimize the horizontal and vertical alignment of a road. Unlike vertical alignment, the horizontal alignment formulation can have a non-convex or discontinuous objective function. The modeling also involves considering political, socioeconomic, and environmental issues. Discrete modeling techniques like network optimization or dynamic programming seems promising at this stage of the research.  95  Bibliography [AAS04] AASHTO, editor. A policy on geometric design of highways and streets. AASHTO, 5 edition, 2004. pages: 3 and 4. [AC73]  G C Athanassoulis and V Calogero. Optimal location of a new highway from a to b, a computer technique for route planning. In PTRC Seminar Proceedings on Cost Models & Optimization in Highway, 1973. page: 7.  [Aka03]  A. E. Akay. Minimizing Total Cost of Construction, Maintenance, and Transportation Costs with Computer-Aided Forest Road Design. PhD thesis, Oregon State University, Corvallis, Oregon, 2003. pages: 1 and 6.  [AM03]  M. S. Aljohani and A. A. Moreb. Roadway profile modeled by polynomials to minimize earthwork cost. In WSEAS Transactions on Mathematics, pages 210–213, 2003. page: 11.  [Aru05]  Kazuhiro Aruga. Tabu search optimization of horizontal and vertical alignments of forest roads. Journal of Forest Research, 10:275–284, 2005. 10.1007/s10310-004-0136-5. page: 6.  [ATSM06] Kazuhiro Aruga, Toshiaki Tasaka, John Sessions, and S. Miyata. Tabu search optimization of forest road alignments combined with shortest paths and cubic splines. Croatian Journal of Forest Engineering, 27, 2006. page: 6. [Bak72]  A. B. Baker. The design and phasing of horizontal and vertical alignments: Program JANUS. Transport and Road Research Laboratory, 1972. page: 8.  [BD62]  Richard Ernest Bellman and Stuart E. Dreyfus. Applied Dynamic programming. Princeton University Press, 1962. page: 9.  [Bel57]  Richard Ernest Bellman. Dynamic Programming. Princeton University Press, 1957. pages: 7 and 9. 96  Bibliography [Bis09]  Johannes Bisschop. AIMMS Optimization Modeling. Paragon Decision Technology, 2009. page: 38.  [BRLH11] Kasra Bigdeli, Faisal Rahman, Yves Lucet, and Warren Hare. A multimaterial multi-block model for earthwork optimization. Technical report, NSERC ENGAGE and undisclosed, 2011. page: 95. [CGF89] E P Chew, C J Goh, and T F Fwa. Simultaneous optimization of horizontal and vertical alignments for highways. Transportation Research Part B: Methodological, 23(5):315–329, 1989. page: 6. [CL06]  Juey-Fu Cheng and Yusin Lee. Model for three-dimensional highway alignment. Journal of Transportation Engineering, 132(12):913–920, 2006. page: 6.  [CLR01] Thomas H. Cormen, Charles E. Leiserson, and Ronald Linn Rivest. Introduction to Algorithms, Section 24.1: The Bellman Ford algorithm. MIT Press and McGraw-Hill, 2nd edition, 2001. page: 7. [Dij59]  E. W. Dijkstra. A note on two problems in connexion with graphs. Numerische Mathematik, 1:269–271, 1959. 10.1007/BF01386390. page: 7.  [DJ09]  Coray Davis and Manoj K. Jha. Modeling the effects of socioeconomic factors in highway construction and expansion. Journal of Transportation Engineering, 135(12):990–998, 2009. page: 2.  [Eas87]  Said M Easa. Earthwork allocations with nonconstant unit costs. J Constr Eng M ASCE, 113(1):34–50, March 1987. page: 10.  [Eas88a] Said M. Easa. Earthwork allocations with linear unit costs. Journal of Construction Engineering and Management, 114(4):641–655, 1988. page: 10. [Eas88b] Said M. Easa. Selection of roadway grades that minimize earthwork cost using linear programming. Transportation Research Part A: General, 22(2):121 – 136, 1988. page: 10. [Fwa89] T. F. Fwa. Highway vertical alignment analysis by dynamic programming. Transportation Research Record, 1239:1–9, 1989. pages: 2, 3, 4, and 9.  97  Bibliography [GAA09] A. Burak Goktepe, Selim Altun, and Perviz Ahmedzade. Optimization of vertical alignment of highways utilizing discrete dynamic programming and weighted ground line. Turkish J. Eng. Env. Sci., 33:105–116, 2009. page: 10. [GCF88] C.J. Goh, E.P. Chew, and T.F. Fwa. Discrete and continuous models for computation of optimal vertical highway alignment. Transportation Research Part B: Methodological, 22(6):399 – 409, 1988. pages: 2 and 9. [GH09]  Nicholas J. GARBER and Lester A. HOEL. Traffic and highway engineering. 4th ed. Cengage Learning, Ohio, 2009. page: 11.  [GLA05] A. Burak Goktepe, A.Hilmi Lav, and Selim Altun. Dynamic optimization algorithm for vertical alignment of highways. Mathematical and Computational Applications, 10(3):341–350, 2005. pages: 2, 4, and 9. [GLA09] A. Burak Goktepe, A.Hilmi Lav, and Selim Altun. Method for optimal vertical alignment of highways. In Proceedings of the Institution of Civil Engineers (ICE) - Transport, volume 162, pages 177 –188. Institution of Civil Engineers, 2009. page: 11. [GT88]  C. J. Goh and K. L. Teo. Control parametrization: a unified approach to optimal control problems with general constraints. Automatica, 24:3– 18, January 1988. page: 9.  [Hay70]  R W Hayman. Optimization of vertical alignment for highways through mathematical programming. Highway Research Record, pages 1–9, 1970. page: 8.  [HBS68] B E Howard, Z Bramnick, and J F Shaw. Optimum curvature principle in highway routing. Journal of the Highway Division, 94:61–82, 1968. page: 7. [HHLM12] Donovan Hare, Warren Hare, Yves Lucet, and Sunny Mehrotra. An arc-flow model for earthwork operations. Technical report, (undisclosed), 2012. page: 93. [HKL11] Warren L. Hare, Valentin R. Koch, and Yves Lucet. Models and algorithms to improve earthwork operations in road design using mixed integer linear programming. European Journal of Operational Research, 215(2):470–480, 2011. pages: 11, 13, 24, 55, 60, 80, and 93.  98  Bibliography [Hog73] J. D. Hogan. Experience with optloc–optimum location of highways by computer. In PTRC seminar proceedings on Cost Models and Optimization in Highways (Session L 10), London, 1973. page: 5. [Hua73]  J. Puy Huarte. Opygar: Optimization and automatic design of highway profiles. In PTRC Seminar Proceedings on Cost Models and Optimization in Highways, Session L13, London, UK, 1973. page: 9.  [Jha03]  Manoj K. Jha. Criteria-based decision support system for selecting highway alignments. Journal of Transportation Engineering, 129(1):33–41, 2003. pages: 1 and 6.  [JS03]  Jyh-Cherng Jong and Paul Schonfeld. An evolutionary model for simultaneously optimizing three-dimensional highway alignments. Transportation Research Part B: Methodological, 37(2):107 – 128, 2003. page: 6.  [JSB+ 10] Y. Ji, F. Seipp, A. Borrmann, S. Ruzika, and E. Rank. Mathematical modeling of earthwork optimization problems. In Proc. of the International Conference on Computing in Civil and Building Engineering 2010, pages 403–410, 2010. page: 11. [JSJ06]  Manoj Kumar Jha, Paul Schonfeld, and J-C Jong. Intelligent Road Design, volume 19. WIT Press, 2006. pages: 2 and 7.  [KJS05]  Eungcheol Kim, Manoj Kumar Jha, and Bongsoo Son. Improving the computational efficiency of highway alignment optimization models through a stepwise genetic algorithms approach. Transportation Research Part B: Methodological, 39:339–360, 2005. page: 6.  [KJSK07] Eungcheol Kim, Manoj K. Jha, Paul Schonfeld, and Hong Sok Kim. Highway alignment optimization incorporating bridges and tunnels. Journal of Transportation Engineering, 133(2):71–81, 2007. page: 6. [KL10]  Valentin Koch and Yves Lucet. A note on: Spline technique for modeling roadway profile to minimize earthwork cost. J. Ind. Manag. Optim., 6(2):393 – 400, May 2010. pages: 11, 13, 18, 21, and 80.  [Koc10]  Valentin Koch. Optimizing earthwork block removal in road construction. Master’s thesis, University of British Columbia Okanagan, Kelowna BC, Canada, 2010. pages: 17, 24, and 55.  [KvT05] Jon Kleinberg and ï¿œva Tardos. Algorithm Design. Addison-Wesley, 2005. pages: 103 and 104. 99  Bibliography [Lay93]  M. G. Lay. Ways of the world : a history of the world’s roads and of the vehicles that used them. Primavera Press, Sydney, 1993. page: 1.  [LRFF62] Jr. Lester Randolph Ford and Delbert Ray Fulkerson. Flows in networks. Princeton University Press, 1962. page: 7. [MA04]  Ahmad A. Moreb and Mohammad S. Aljohani. Quadratic representation for roadway profile that minimizes earthwork cost. J Sys Sc Sys Eng, 13(2):245–252, April 2004. pages: 11 and 13.  [Min10a] Minister of Public Works and Government Services. Transportation in canada 2010 - addendum tables and figures. Transport Canada, Cat. No. T1-21/2010E-PDF:7–13, 2010. page: 1. [Min10b] Minister of Public Works and Government Services. Transportation in canada 2010 - an overview. Transport Canada, Cat. No. T1-21/2010EPDF:7–13, 2010. page: 1. [MJ09]  A. Maji and M. K. Jha. Multi-objective highway alignment optimization using a genetic algorithm. J. Adv. Transp., 43(4):2042–3195, 2009. page: 6.  [Mor96] Ahmad A. Moreb. Linear programming model for finding optimal roadway grades that minimize earthwork cost. European Journal of Operational Research, 93(1):148 – 154, 1996. page: 10. [Mor09] Ahmad A Moreb. Spline technique for modeling roadway profile to minimize earthwork cost. Journal of Industrial and Management Optimization (JIMO), 5(2):275–283, 2009. pages: 11, 13, 18, 20, 80, 93, and 94. [MS81]  R Mayer and R Stark. Earthmoving logistics. Journal of the Construction Division, 107(2):297–312, Jun 1981. page: 10.  [Mur73] J. D. Murchland. Methods of vertical profile optimisation for an improvement to an existing road. In PTRC Seminar Proceedings on Cost Models and Optimisation in Highways (session L12), London, 1973. page: 9. [Nan81]  S. Nandgaonkar. Earthwork transportation allocations. Journal of Construction Division, 107:373–392, 1981. page: 10.  [NEW76] A. J. Nicholson, D. G. Elms, and A. Williman. A variational approach to optimal route location. Highway Engineers, 23:22–25, 1976. page: 5. 100  Bibliography [OEC73] OECD. Optimisation of road alignment by the use of computers. Technical report, Organization of Economic Co-operation and Development, Paris, 1973. pages: 7 and 8. [OH82]  Clarkson H. Oglesby and Russell G. Hicks. Highway Engineering. John Wiley, New York, 4th edition, 1982. page: 10.  [Ont84]  Ontario Ministry of Transportation and Communications. Geometric design standards for ontario highways. Information Management Office, Downsview, Ontario, Canada, 1984. page: 8.  [Par77]  Neville A. Parker. Rural highway route corridor selection. Transportation Planning and Technology, 3(4):247–256, 1977. page: 7.  [Pea73]  A D Pearman. Investigation of the objective function in problems of optimising highway vertical alignment. In PTRC Seminar Proc., Cost Models and Optimisation in Highways, Session L18, London, 1973. page: 8.  [RL11]  Faisal Md Rahman and Yves Lucet. Dynamic programming for vertical alignment optimization. Technical report, (undisclosed), 2011. page: 10.  [Rob73]  R Robinson. Automatic design of the road vertical alignment. In PTRC Seminar Proceedings on Cost Models and Optimization in Highways, Session L9, London, UK, 1973. page: 8.  [RWW97] C. ReVelle, E.E. Whitlatch, and J.R. Wright. Civil and environmental systems engineering. Prentice Hall, 1997. page: 10. [Sch00]  John George Schoon. Geometric Design Projects for Highways: an Introduction. American Society of Civil Engineers, 2000. page: 2.  [SH81]  Jocelyn F. B. Shaw and Bernard E. Howard. Comparison of two integration methods in transportation routing. Transportation Research Record, pages 8–13, 1981. page: 7.  [SH82]  Jocelyn F. B. Shaw and Bernard E. Howard. Expressway route optimization by ocp. Transportation Engineering Journal, 108:227–243, 1982. page: 7.  [SN71]  Robert M Stark and Robert L Nicholls. Mathematical Foundations for Design: Civil Engineering Systems. Technology and Engineering. McGraw-Hill, 1971. page: 10. 101  Bibliography [TM71]  A K Turner and R D Miles. The gcars system: A computer assisted method of regional route location. Highway Research Record, pages 1–15, 1971. page: 7.  [Tri87a]  Dan Trietsch. Comprehensive design of highway networks. TRANSPORTATION SCIENCE, 21(1):26–35, 1987. page: 7.  [Tri87b] Dan Trietsch. A family of methods for preliminary highway alignment. Transportation Science, 21(1):17–25, February 1987. page: 7. [TS88]  N. R. Thomson and J. F. Sykes. Route selection through a dynamic ice field using the maximum principle. Transportation Research Part B: Methodological, 22(5):339–356, October 1988. page: 7.  [Tur78]  A K Turner. A decade of experience in computer aided route selection. Photogrammetric Engineering and Remote Sensing, pages 1561–1576, 1978. page: 7.  [Wan95] Frederic Y. M. Wan. Introduction to the calculus of variations and its applications. Chapman & Hall, 1995. page: 6.  102  Appendix A  Asymptotic Bounds Definition A.1. Let f and g be real-valued functions. We say that f (n) is O(g(n)) or g is an asymptotically upper bound for f , if there exists constants c and n0 such that |f (n)| ≤ c |g(n)| for all n > n0 . Example A.2. For any algorithm, the running time T (n) = n3 + 10n + 1 is O(n3 ) because n3 + 10n + 1 ≤ n3 + 10n3 + n3 ≤ 12n3 for all n > 1. Definition A.3. Let f and g be real-valued functions. We say that f (n) is Ω(g(n)) or g is an asymptotically lower bound for f , if there exists constants c and n0 such that |f (n)| ≥ c |g(n)| for all n > n0 . Example A.4. For any algorithm, the running time T (n) = n3 + 10n + 1 is Ω(n3 ) 1 because n3 + 10n + 1 ≥ n3 for all n > − 10 . Definition A.5. Let f and g be real-valued functions. We say that f (n) is Θ(g(n)) or g is an asymptotically tight bound for f , if and only if f (n) is Ω(g(n)) and O(g(n)). Example A.6. For any algorithm, the running time T (n) = n3 + 10n + 1 is Θ(n3 ) by Examples A.2 and A.4. Theorem A.7. an xn + ... + a1 x + a0 is O(xn ) for any real numbers an , ..., a1 , a0 with an = 0 and any non-negative number n. Proof. The proof can be found elsewhere [KvT05]. Theorem A.8. If f1 (x) is O(g1 (x)) , and f2 (x) is O(g2 (x)) , then (f1 + f2 )(x) is O(max(g1 (x), g2 (x))) . Proof. The proof can be found elsewhere [KvT05]. Theorem A.9. If f1 (x) is O(g1 (x)) , and f2 (x) is O(g2 (x)) , then (f1 ∗ f2 )(x) is O(g1 (x) ∗ g2 (x)) . Proof. The proof can be found elsewhere [KvT05].  103  Appendix A. Asymptotic Bounds Theorem A.10. an xn + ... + a1 x + a0 is Θ(xn ) for any real numbers an , ..., a1 , a0 with an = 0 and any non-negative number n. Proof. The proof can be found elsewhere [KvT05]. Definition A.11. Let f and g be real-valued functions. We say that f (n) is o(g(n)) if f (n) is O(g(n)) but not Θ(g(n)), and f (n) is ω(g(n)) if f (n) is Ω(g(n)) but not Θ(g(n)). Example A.12. x is o(x2 ) and x2 is ω(x).  104  Appendix B  Tables Table B.1: Required time in seconds (tR,k s), normalized time (tR,k ), optimal cost 400 ), and percent absolute relative (CR,k ), optimal cost with corrected volume (CR,k error (| R,k |) for the problems (R-k) of Test configuration 1 (Roads-A,B) R-k  tR,k  tR,k  CR,k  400 CR,k  A-400  0.61  1.0  12882.6  12882.6  0  A-200  0.75  1.2  12707.4  12936.3  1.8  A-100  0.89  1.5  12726.3  12943.2  1.7  A-50  0.55  0.90  12736.5  12951.8  1.7  A-40  0.36  0.59  12747.9  12952.2  1.6  A-20  0.27  0.44  12878.3  13015.1  1.1  A-10  0.09  0.15  13287.7  13170.8  0.89  A-5  0.08  0.13  14126.1  13459.7  5  A-2  0.06  0.10  16544.3  14144  17  A-AM  0.23  0.38  20408.7  14867.6  37.3  A-NGM  0.23  0.38  10396.8  12997.2  20  B-400  0.51  1.0  246325  246293  0.01  B-200  0.47  0.92  238615  246462  3.2  B-100  0.58  1.1  238612  246422  3.2  B-50  0.23  0.45  238667  246428  3.1  B-40  0.27  0.53  238788  246499  3.1  B-20  0.09  0.18  239592  246587  2.8  B-10  0.08  0.16  242599  247627  2  B-5  0.23  0.45  254468  253048  0.56  B-2  0.16  0.31  304477  271852  12  B-AM  0.11  0.22  386232  292768  31.9  B-NGM  0.08  0.16  185555  255932  27.5  R,k  105  Appendix B. Tables Table B.2: Required time in seconds (tR,k s), normalized time (tR,k ), optimal cost 400 ), and percent absolute relative (CR,k ), optimal cost with corrected volume (CR,k error (| R,k |) for the problems (R-k) of Test configuration 1 (Roads-C,D,E) R-k  tR,k  tR,k  CR,k  400 CR,k  R,k  C-400  3.8  1.0  415788  415765  0.01  C-200  3.5  0.92  399624  415766  3.9  C-100  2.7  0.71  399637  415766  3.9  C-50  2.1  0.55  399648  415766  3.9  C-40  2  0.53  399707  415766  3.9  C-20  1.2  0.32  400196  415767  3.7  C-10  1.2  0.32  402063  415767  3.3  C-5  0.9  0.24  408086  415811  1.9  C-2  4.3  1.1  463629  417949  10.9  C-AM  3.4  0.89  602781  425284  41.7  C-NGM  5.3  1.4  267501  428078  37.5  D-400  3  1.0  94893  94836  0.06  D-200  3.2  1.1  92278.5  94869.1  2.7  D-100  2.7  0.90  92332.2  94881.8  2.7  D-50  2.1  0.70  92357.7  94889.2  2.7  D-40  1.8  0.60  92410.8  94888.4  2.6  D-20  1.2  0.40  92843.4  95056  2.3  D-10  1  0.33  94529.3  95796.4  1.3  D-5  0.89  0.30  100316  97999.2  2.4  D-2  0.67  0.22  118819  104210  14  D-AM  0.73  0.24  148328  111462  33.1  D-NGM  0.76  0.25  73689.6  96142.2  23.4  E-400  4.1  1.0  1601620  1601610  0  E-200  3.9  0.95  1541690  1602890  3.8  E-100  2.7  0.66  1541640  1602990  3.8  E-50  1.8  0.44  1541940  1603070  3.8  E-40  1.6  0.39  1542320  1603160  3.8  E-20  1.1  0.27  1545260  1603520  3.6  E-10  0.67  0.16  1554970  1605780  3.2  E-5  0.59  0.14  1596920  1618010  1.3  E-2  0.53  0.13  1824600  1691980  7.8  E-AM  0.53  0.13  2304130  1804020  27.7  E-NGM  0.61  0.15  1169080  1708980  31.6  106  Appendix B. Tables Table B.3: Required time in seconds (tR,k ), optimal cost (CR,k ), optimal cost with 400 ), and percent absolute relative error (| corrected volume (CR,k R,k |) for the problems (R-k) of Test configuration 1 (Roads-F,G) R-k  tR,k  tR,k  CR,k  400 CR,k  F-400  7.4  1.0  2078030  2078010  0  F-200  6.1  0.82  2001190  2079570  3.8  F-100  4.7  0.64  2001270  2079670  3.8  F-50  2.9  0.39  2001640  2079820  3.8  F-40  2.4  0.32  2002120  2079910  3.7  F-20  1.5  0.20  2005920  2080570  3.6  F-10  1.2  0.16  2018810  2083480  3.1  F-5  1  0.14  2075680  2100290  1.2  F-2  1.1  0.15  2388580  2203500  8.4 28.1  R,k  F-AM  0.84  0.11  3008870  2349300  F-NGM  0.92  0.12  1515610  2196990  31  G-400  38.8  1.0  1049830  1049760  0.01  G-200  44.2  1.1  1009470  1050500  3.9  G-100  39.9  1.0  1009490  1050690  3.9  G-50  26.8  0.69  1009660  1050880  3.9  G-40  24.5  0.63  1009860  1050920  3.9  G-20  21.4  0.55  1011290  1051330  3.8  G-10  17.8  0.46  1017120  1052750  3.4  G-5  13  0.34  1039140  1057940  1.8  G-2  12.5  0.32  1164140  1087030  7.1  G-AM  12.2  0.31  1427720  1136960  25.6  G-NGM  13.2  0.34  728216  1132610  35.7  107  Appendix B. Tables Table B.4: Optimal cost (CR,ng ), normalized cost (C R,ng ), required time (tR,ng ), and normalized time (tR,ng ) for the problems (R-ng ) of Test configuration 2 R-ng  CR,ng  C R,ng  tR,ng  tR,ng  R-ng  CR,ng  C R,ng  tR,ng  tR,ng  A-1  8614.45  1.0  1.5  1.0  E-1  1363880  1.0  23.3  1.0  A-2  12707.4  1.5  2.3  1.5  E-2  1541690  1.1  21.7  0.93  A-5  23316.4  2.7  2.5  1.6  E-3  1752290  1.3  21.2  0.91  A-10  93495.4  10.9  5.0  3.3  E-5  2144850  1.6  40.6  1.7  A-25  133842  15.5  2.4  1.6  E-6  2400900  1.8  9.2  0.39  B-1  109555  1.0  1.7  1.0  E-10  3035850  2.2  10.5  0.45  B-2  238615  2.2  2.2  1.3  E-15  4207050  3.1  15.2  0.65  B-5  502577  4.6  2.7  1.6  E-25  5162780  3.8  33.2  1.4  B-10  767983  7.0  3.2  1.9  F-1  1816420  1.0  36.4  1.0  B-25  957011  8.7  2.3  1.3  F-2  2001190  1.1  33.5  0.92  C-1  399592  1.0  45.3  1.0  F-4  2365320  1.3  86.5  2.4  C-2  399624  1.0  8.8  0.19  F-5  2639150  1.5  57.2  1.6  C-4  399592  1.0  34.8  0.77  F-8  3289100  1.8  46.6  1.3 0.41  C-5  400201  1.0  24.0  0.53  F-10  3937060  2.2  15.1  C-10  401230  1.0  9.3  0.20  F-20  7933540  4.4  90.5  2.5  C-20  407700  1.0  8.5  0.19  F-25  8356650  4.6  554.6  15.2  C-25  404997  1.0  10.5  0.23  G-1  1000420  1.0  115.5  1.0  D-1  85844.2  1.0  25.7  1.0  G-2  1009470  1.0  42.8  0.37  D-2  92278.5  1.1  22.1  0.86  G-3  1019870  1.0  395.7  3.4  D-3  99181.4  1.2  21.0  0.82  G-5  1049250  1.0  758.0  6.6  D-5  116551  1.4  31.9  1.2  G-6  1058990  1.1  804.9  7.0  D-6  120897  1.4  27.1  1.1  G-9  1123460  1.1  131.0  1.1  D-10  237660  2.8  40.3  1.6  G-10  1207270  1.2  815.9  7.1  D-15  303055  3.5  36.4  1.4  G-15  1357230  1.4  113.9  0.99  D-25  343509  4.0  69.6  2.7  G-18  1340080  1.3  1236.7  10.7  G-25  1580330  1.6  637.8  5.5  108  Appendix B. Tables b Table B.5: Cost (CR,k,n ) and timing (tbR,k,nz ,nr ) of the basic MILP model, cost z ,nr n n (CR,k,nz ,nr ) and timing (tR,k,nz ,nr ) of the quasi-network-flow model, percent difference in cost (δR,k,nz ,nr ), and percent improvement (ηR,k,nz ,nr ) for the problems (R-k, nz , nr ) of Test configuration 3 (Part-1)  R-k, nz , nr  b CR,k,n z ,nr  tbR,k,nz ,nr  n CR,k,n z ,nr  tn R,k,nz ,nr  δR,k,nz ,nr  ηR,k,nz ,nr  A-400,5,2  12997.3  5.2  12997.3  1.7  0.00  67.5  A-200,5,2  12795.7  7.1  12818.7  3.6  0.18  48.5  A-100,5,2  12813.3  9.1  12813.3  4.2  0.00  54.3  A-50,5,2  12823.0  9.2  12833.4  1.2  0.08  87.4  A-40,5,2  12834.8  4.9  12847.1  2.1  0.10  58.1  A-20,5,2  12962.3  5.7  12987.8  1.0  0.20  82.2  A-10,5,2  13373.9  4.3  13373.9  0.89  0.00  79.3  A-5,5,2  14239.2  4.4  14221.3  0.97  -0.13  78.2  A-2,5,2  16669.7  2.6  16658.9  0.47  -0.06  82.0  A-1,5,2  20534.6  6.3  20523.6  0.67  -0.05  89.4  A-400,10,2  13034.7  841.0  13034.7  49.0  0.00  94.2  A-200,10,2  12852.7  378.0  12852.7  37.0  0.00  90.2  A-100,10,2  12870.8  264.0  12870.8  33.0  0.00  87.5  A-50,10,2  12880.0  210.0  12880.0  26.0  0.00  87.6  A-40,10,2  12893.4  270.0  12893.4  23.0  0.00  91.5  A-20,10,2  13021.4  470.0  13021.4  22.0  0.00  95.3  A-10,10,2  13431.1  293.0  13438.0  23.0  0.05  92.2  A-5,10,2  14290.1  429.0  14290.1  22.0  0.00  94.9  A-2,10,2  16731.2  316.0  16752.7  16.0  0.13  94.9  A-1,10,2  20651.1  364.0  20651.1  24.0  0.00  93.4  A-400,5,4  12997.3  5.6  12997.3  1.6  0.00  71.6  A-200,5,4  12795.7  7.4  12818.7  4.7  0.18  36.9  A-100,5,4  12813.3  9.2  12813.3  2.7  0.00  70.2  A-50,5,4  12844.0  3.3  12844.0  2.2  0.00  32.1  A-40,5,4  12856.9  5.3  12834.8  1.4  -0.17  73.4  A-20,5,4  12987.8  5.7  12987.8  0.78  0.00  86.2  A-10,5,4  13399.3  5.0  13388.4  0.56  -0.08  88.7  A-5,5,4  14221.3  2.6  14239.2  0.44  0.13  83.3  A-2,5,4  16669.7  2.7  16669.7  0.58  0.00  78.2  A-1,5,4  20571.9  4.9  20534.6  0.50  -0.18  89.7  A-400,10,4  13011.8  61.7  13006.0  14.6  -0.04  76.4  A-200,10,4  12826.4  149.2  12826.4  24.7  0.00  83.5  A-100,10,4  12844.7  55.1  12844.7  14.5  0.00  73.7  A-50,10,4  12854.9  199.6  12854.9  10.2  0.00  94.9  A-40,10,4  12867.4  73.2  12867.4  7.7  0.00  89.5  109  Appendix B. Tables b Table B.6: Cost (CR,k,n ) and timing (tbR,k,nz ,nr ) of the basic MILP model, cost z ,nr n n (CR,k,nz ,nr ) and timing (tR,k,nz ,nr ) of the quasi-network-flow model, percent difference in cost (δR,k,nz ,nr ), and percent improvement (ηR,k,nz ,nr ) for the problems (R-k, nz , nr ) of Test configuration 3 (Part-2)  R-k, nz , nr  b CR,k,n z ,nr  tbR,k,nz ,nr  n CR,k,n z ,nr  tn R,k,nz ,nr  δR,k,nz ,nr  ηR,k,nz ,nr  A-20,10,4  12994.3  124.8  12994.3  5.1  0.00  95.9  A-10,10,4  13417.0  102.9  13414.3  9.1  -0.02  91.1  A-5,10,4  14255.6  45.0  14255.6  5.8  0.00  87.2  A-2,10,4  16708.7  25.8  16708.7  5.7  0.00  77.7  A-1,10,4  20623.7  873.0  20623.7  22.2  0.00  97.5  B-400,5,2  248092.0  11.9  248092.0  0.83  0.00  93.1  B-200,5,2  240152.0  13.5  240152.0  1.2  0.00  91.5  B-100,5,2  240204.0  7.2  240154.0  0.95  -0.02  86.8  B-50,5,2  240212.0  10.7  240212.0  0.56  0.00  94.7  B-40,5,2  240331.0  9.3  240331.0  1.0  0.00  89.0  B-20,5,2  241156.0  9.5  241156.0  0.36  0.00  96.2  B-10,5,2  243803.0  9.2  243803.0  0.39  0.00  95.7  B-5,5,2  255556.0  6.2  255556.0  0.25  0.00  95.9  B-2,5,2  306133.0  6.1  307433.0  0.27  0.42  95.7  B-1,5,2  388360.0  6.1  388360.0  1.2  0.00  80.5  B-400,10,2  248092.0  577.5  248092.0  43.2  0.00  92.5  B-200,10,2  240152.0  419.3  240152.0  40.6  0.00  90.3  B-100,10,2  240208.0  233.8  240154.0  12.9  -0.02  94.5  B-50,10,2  240409.0  368.9  240212.0  13.3  -0.08  96.4  B-40,10,2  240472.0  440.5  240357.0  32.6  -0.05  92.6  B-20,10,2  241310.0  329.4  241156.0  33.1  -0.06  89.9  B-10,10,2  244022.0  156.8  243803.0  26.3  -0.09  83.2  B-5,10,2  255732.0  121.0  255556.0  14.8  -0.07  87.8  B-2,10,2  306341.0  106.3  306133.0  28.3  -0.07  73.3  B-1,10,2  388360.0  236.9  388360.0  24.5  0.00  89.7  B-400,5,4  246967.0  4.1  247953.0  2.5  0.40  39.4  B-200,5,4  239245.0  4.6  240427.0  3.3  0.49  28.4  B-100,5,4  239251.0  3.0  240438.0  2.1  0.50  29.3  B-50,5,4  239305.0  1.42  240492.0  1.39  0.50  2.2  B-40,5,4  239420.0  1.5  240606.0  0.90  0.50  38.3  B-20,5,4  240230.0  1.4  241503.0  0.83  0.53  39.1  B-10,5,4  243272.0  1.1  243732.0  0.48  0.19  56.9  B-5,5,4  255199.0  1.3  255556.0  0.62  0.14  51.8  B-2,5,4  305395.0  1.1  306133.0  0.34  0.24  68.6  B-1,5,4  387439.0  1.1  387439.0  0.44  0.00  59.4  110  Appendix B. Tables b Table B.7: Cost (CR,k,n ) and timing (tbR,k,nz ,nr ) of the basic MILP model, cost z ,nr n n (CR,k,nz ,nr ) and timing (tR,k,nz ,nr ) of the quasi-network-flow model, percent difference in cost (δR,k,nz ,nr ), and percent improvement (ηR,k,nz ,nr ) for the problems (R-k, nz , nr ) of Test configuration 3 (Part-3)  R-k, nz , nr  b CR,k,n z ,nr  tbR,k,nz ,nr  n CR,k,n z ,nr  tn R,k,nz ,nr  δR,k,nz ,nr  ηR,k,nz ,nr  B-400,10,4  247783.0  23.2  247783.0  8.8  0.00  62.1  B-200,10,4  240001.0  32.0  239859.0  14.6  -0.06  54.2  B-100,10,4  239863.0  17.9  239863.0  5.7  0.00  68.2  B-50,10,4  239922.0  20.1  240069.0  5.0  0.06  75.0  B-40,10,4  240045.0  12.6  240185.0  4.7  0.06  62.6  B-20,10,4  240837.0  9.9  240837.0  3.8  0.00  61.8  B-10,10,4  243732.0  12.0  243732.0  2.6  0.00  78.2  B-5,10,4  255556.0  11.9  256988.0  5.8  0.56  51.1  B-2,10,4  306133.0  11.1  306133.0  3.0  0.00  72.8  B-1,10,4  388360.0  12.6  389967.0  3.2  0.41  74.9  C-400,5,2  418176.0  157.0  418176.0  4.0  0.00  97.5  C-200,5,2  400173.0  130.0  401927.0  6.0  0.44  95.4  C-100,5,2  401940.0  74.0  402054.0  4.0  0.03  94.6  C-50,5,2  399767.0  69.0  402065.0  3.0  0.57  95.7  C-40,5,2  402009.0  73.0  402009.0  2.0  0.00  97.3  C-20,5,2  402939.0  47.0  402492.0  2.0  -0.11  95.7  C-10,5,2  404352.0  79.0  404380.0  2.0  0.01  97.5  C-5,5,2  408842.0  47.0  410372.0  1.0  0.37  97.9  C-2,5,2  463228.0  83.0  463228.0  1.0  0.00  98.8  C-1,5,2  606528.0  56.0  606455.0  1.0  -0.01  98.2  C-400,10,2  421207.0  24665.0  421205.0  292.0  0.00  98.8  C-200,10,2  404836.0  15929.0  405458.0  390.0  0.15  97.6  C-100,10,2  404851.0  13407.0  404851.0  240.0  0.00  98.2  C-50,10,2  404864.0  24764.0  406450.0  549.0  0.39  97.8  C-40,10,2  404925.0  34714.0  404925.0  279.0  0.00  99.2  C-20,10,2  405451.0  13802.0  405451.0  309.0  0.00  97.8  C-10,10,2  408996.0  35082.0  407376.0  200.0  -0.40  99.4  C-5,10,2  413550.0  19250.0  413550.0  185.0  0.00  99.0  C-2,10,2  468418.0  30212.0  466963.0  162.0  -0.31  99.5  C-1,10,2  611882.0  17797.0  611882.0  105.0  0.00  99.4  C-400,5,4  415879.0  31.7  415879.0  6.6  0.00  79.0  C-200,5,4  399713.0  29.3  399713.0  8.9  0.00  69.7  C-100,5,4  401940.0  36.0  399725.0  6.6  -0.55  81.7  C-50,5,4  402034.0  29.9  399737.0  3.5  -0.57  88.4  C-40,5,4  402093.0  17.2  399795.0  3.2  -0.57  81.3  111  Appendix B. Tables b Table B.8: Cost (CR,k,n ) and timing (tbR,k,nz ,nr ) of the basic MILP model, cost z ,nr n n (CR,k,nz ,nr ) and timing (tR,k,nz ,nr ) of the quasi-network-flow model, percent difference in cost (δR,k,nz ,nr ), and percent improvement (ηR,k,nz ,nr ) for the problems (R-k, nz , nr ) of Test configuration 3 (Part-4)  R-k, nz , nr  b CR,k,n z ,nr  tbR,k,nz ,nr  n CR,k,n z ,nr  tn R,k,nz ,nr  δR,k,nz ,nr  ηR,k,nz ,nr  C-20,5,4  402575.0  18.6  400284.0  2.5  -0.57  86.4  C-10,5,4  404435.0  17.1  402150.0  2.3  -0.56  86.6  C-5,5,4  410464.0  16.6  409790.0  1.6  -0.16  90.6  C-2,5,4  463334.0  16.6  460590.0  1.5  -0.59  91.3  C-1,5,4  606477.0  17.8  606477.0  1.2  0.00  93.2  C-400,10,4  421207.0  6952.0  420824.0  182.0  -0.09  97.4  C-200,10,4  404374.0  1307.0  404453.0  163.0  0.02  87.5  C-100,10,4  405311.0  566.0  405365.0  134.0  0.01  76.3  C-50,10,4  404398.0  2550.0  404864.0  100.0  0.12  96.1  C-40,10,4  404458.0  3852.0  404537.0  124.0  0.02  96.8  C-20,10,4  404945.0  3876.0  405933.0  83.0  0.24  97.9  C-10,10,4  406816.0  13933.0  406895.0  43.0  0.02  99.7  C-5,10,4  412972.0  4022.0  413053.0  99.0  0.02  97.5  C-2,10,4  465830.0  5483.0  467195.0  75.0  0.29  98.6  C-1,10,4  609939.0  4680.0  610055.0  116.0  0.02  97.5  D-400,5,2  94893.0  196.0  95028.4  6.0  0.14  96.9  D-200,5,2  92278.5  210.0  92278.5  18.0  0.00  91.4  D-100,5,2  92332.2  161.0  92464.7  5.0  0.14  96.9  D-50,5,2  92357.7  162.0  92493.9  3.0  0.15  98.1  D-40,5,2  92410.8  191.0  92410.8  7.0  0.00  96.3  D-20,5,2  92843.4  138.0  93426.1  2.0  0.63  98.6  D-10,5,2  94529.3  130.0  95125.3  1.0  0.63  99.2  D-5,5,2  100316.0  150.0  100316.0  1.0  0.00  99.3  D-2,5,2  119106.0  121.0  118819.0  1.0  -0.24  99.2  D-1,5,2  149405.0  117.0  148835.0  2.0  -0.38  98.3  D-400,10,2  95492.3  3137.0  95383.4  111.0  -0.11  96.5  D-200,10,2  92662.9  5143.0  92557.1  81.0  -0.11  98.4  D-100,10,2  92672.5  4008.0  92719.1  96.0  0.05  97.6  D-50,10,2  92913.1  1549.0  92635.8  71.0  -0.30  95.4  D-40,10,2  92691.1  3648.0  92532.5  79.0  -0.17  97.8  D-20,10,2  93232.7  5237.0  92964.3  53.0  -0.29  99.0  D-10,10,2  94650.8  5554.0  95037.0  41.0  0.41  99.3  D-5,10,2  100844.0  1651.0  100469.0  38.0  -0.37  97.7  D-2,10,2  119386.0  2809.0  119069.0  45.0  -0.27  98.4  D-1,10,2  148780.0  2299.0  148709.0  42.0  -0.05  98.2  112  Appendix B. Tables b Table B.9: Cost (CR,k,n ) and timing (tbR,k,nz ,nr ) of the basic MILP model, cost z ,nr n n (CR,k,nz ,nr ) and timing (tR,k,nz ,nr ) of the quasi-network-flow model, percent difference in cost (δR,k,nz ,nr ), and percent improvement (ηR,k,nz ,nr ) for the problems (R-k, nz , nr ) of Test configuration 3 (Part-5)  R-k, nz , nr  b CR,k,n z ,nr  tbR,k,nz ,nr  n CR,k,n z ,nr  tn R,k,nz ,nr  δR,k,nz ,nr  ηR,k,nz ,nr  D-400,5,4  95343.8  35.0  94964.1  5.0  -0.40  85.7  D-200,5,4  92724.3  34.0  92278.5  14.0  -0.48  58.8  D-100,5,4  92780.6  32.0  92332.2  11.0  -0.48  65.6  D-50,5,4  92807.0  29.0  92357.7  2.0  -0.48  93.1  D-40,5,4  92855.8  28.0  92410.8  6.0  -0.48  78.6  D-20,5,4  93294.0  28.0  92912.7  1.0  -0.41  96.4  D-10,5,4  94965.2  28.0  94529.3  1.0  -0.46  96.4  D-5,5,4  100748.0  26.0  100316.0  1.0  -0.43  96.2  D-2,5,4  118819.0  30.0  119241.0  1.0  0.36  96.7  D-1,5,4  148328.0  39.0  148876.0  1.0  0.37  97.4  D-400,10,4  94974.8  224.0  95169.3  8.0  0.20  96.4  D-200,10,4  92346.8  265.0  92485.3  26.0  0.15  90.2  D-100,10,4  92401.3  287.0  92543.3  37.0  0.15  87.1  D-50,10,4  92689.7  172.0  92504.8  19.0  -0.20  89.0  D-40,10,4  92481.1  137.0  92685.3  13.0  0.22  90.5  D-20,10,4  92993.4  166.0  93129.0  3.0  0.15  98.2  D-10,10,4  94595.1  251.0  94677.8  2.0  0.09  99.2  D-5,10,4  100396.0  235.0  100646.0  2.0  0.25  99.1  D-2,10,4  119333.0  168.0  118933.0  3.0  -0.34  98.2  D-1,10,4  148455.0  236.0  149036.0  2.0  0.39  99.2  E-400,5,2  1610000.0  207.0  1610000.0  13.0  0.00  93.7  E-200,5,2  1550000.0  220.0  1550000.0  27.0  0.00  87.7  E-100,5,2  1550000.0  184.0  1550000.0  9.0  0.00  95.1  E-50,5,2  1550000.0  204.0  1550000.0  13.0  0.00  93.6  E-40,5,2  1550000.0  181.0  1550000.0  13.0  0.00  92.8  E-20,5,2  1550000.0  194.0  1550000.0  4.0  0.00  97.9  E-10,5,2  1560000.0  192.0  1570000.0  2.0  0.41  99.0  E-5,5,2  1610000.0  203.0  1610000.0  1.0  0.00  99.5  E-2,5,2  1830000.0  175.0  1830000.0  4.0  0.00  97.7  E-1,5,2  2310000.0  186.0  2320000.0  2.0  0.27  98.9  E-400,10,2  1620000.0  4388.0  1620000.0  204.0  0.00  95.4  E-200,10,2  1560000.0  3267.0  1560000.0  171.0  -0.05  94.8  E-100,10,2  1560000.0  3935.0  1560000.0  109.0  0.00  97.2  E-50,10,2  1560000.0  3160.0  1560000.0  138.0  0.05  95.6  E-40,10,2  1560000.0  3112.0  1560000.0  48.0  0.00  98.5  113  Appendix B. Tables b Table B.10: Cost (CR,k,n ) and timing (tbR,k,nz ,nr ) of the basic MILP model, cost z ,nr n n (CR,k,nz ,nr ) and timing (tR,k,nz ,nr ) of the quasi-network-flow model, percent difference in cost (δR,k,nz ,nr ), and percent improvement (ηR,k,nz ,nr ) for the problems (R-k, nz , nr ) of Test configuration 3 (Part-6)  R-k, nz , nr  b CR,k,n z ,nr  tbR,k,nz ,nr  n CR,k,n z ,nr  tn R,k,nz ,nr  δR,k,nz ,nr  ηR,k,nz ,nr  E-20,10,2  1560000.0  3746.0  1560000.0  99.0  0.04  97.4  E-10,10,2  1570000.0  2343.0  1570000.0  95.0  -0.20  95.9  E-5,10,2  1620000.0  5143.0  1610000.0  45.0  -0.20  99.1  E-2,10,2  1840000.0  3187.0  1840000.0  35.0  0.08  98.9  E-1,10,2  2320000.0  3808.0  2320000.0  93.0  0.00  97.6  E-400,5,4  1600000.0  166.5  1600000.0  26.5  0.00  84.1  E-200,5,4  1540000.0  185.9  1550000.0  6.1  0.43  96.7  E-100,5,4  1540000.0  163.2  1550000.0  14.3  0.43  91.3  E-50,5,4  1540000.0  139.5  1550000.0  8.1  0.42  94.2  E-40,5,4  1540000.0  151.1  1550000.0  6.6  0.43  95.7  E-20,5,4  1550000.0  149.8  1550000.0  3.5  0.43  97.7  E-10,5,4  1560000.0  144.4  1560000.0  3.6  0.42  97.5  E-5,5,4  1600000.0  149.3  1600000.0  1.0  0.00  99.3  E-2,5,4  1830000.0  142.5  1830000.0  0.92  0.00  99.4  E-1,5,4  2310000.0  126.1  2310000.0  1.2  -0.26  99.1  E-400,10,4  1620000.0  1855.0  1620000.0  63.0  0.00  96.6  E-200,10,4  1560000.0  2220.0  1560000.0  122.0  0.00  94.5  E-100,10,4  1560000.0  909.0  1560000.0  83.0  0.00  90.9  E-50,10,4  1560000.0  894.0  1560000.0  64.0  0.18  92.8  E-40,10,4  1560000.0  1614.0  1560000.0  55.0  0.00  96.6  E-20,10,4  1560000.0  1183.0  1560000.0  51.0  -0.04  95.7  E-10,10,4  1570000.0  1696.0  1570000.0  41.0  -0.04  97.6  E-5,10,4  1610000.0  888.0  1620000.0  26.0  0.21  97.1  E-2,10,4  1850000.0  653.0  1840000.0  30.0  -0.31  95.4  E-1,10,4  2330000.0  1303.0  2330000.0  11.0  -0.13  99.2  F-400,5,2  2080000.0  483.0  2100000.0  26.0  0.63  94.6  F-200,5,2  2000000.0  506.0  2010000.0  28.0  0.33  94.5  F-100,5,2  2000000.0  471.0  2010000.0  16.0  0.33  96.6  F-50,5,2  2010000.0  485.0  2010000.0  13.0  0.17  97.3  F-40,5,2  2010000.0  459.0  2010000.0  14.0  0.00  96.9  F-20,5,2  2010000.0  568.0  2020000.0  7.0  0.33  98.8  F-10,5,2  2020000.0  447.0  2030000.0  6.0  0.17  98.7  F-5,5,2  2080000.0  448.0  2090000.0  3.0  0.29  99.3  F-2,5,2  2390000.0  442.0  2400000.0  1.0  0.29  99.8  F-1,5,2  3010000.0  445.0  3020000.0  0.32  0.25  99.9  114  Appendix B. Tables b Table B.11: Cost (CR,k,n ) and timing (tbR,k,nz ,nr ) of the basic MILP model, cost z ,nr n n (CR,k,nz ,nr ) and timing (tR,k,nz ,nr ) of the quasi-network-flow model, percent difference in cost (δR,k,nz ,nr ), and percent improvement (ηR,k,nz ,nr ) for the problems (R-k, nz , nr ) of Test configuration 3 (Part-7)  R-k, nz , nr  b CR,k,n z ,nr  tbR,k,nz ,nr  n CR,k,n z ,nr  tn R,k,nz ,nr  δR,k,nz ,nr  ηR,k,nz ,nr  F-400,10,2  2090000.0  12902.0  2090000.0  152.0  -0.17  98.8  F-200,10,2  2010000.0  10836.0  2010000.0  143.0  0.30  98.7  F-100,10,2*  2019872.0  -  2010000.0  146.0  -0.55  -  F-50,10,2  2010000.0  16129.0  2010000.0  106.0  0.00  99.3  F-40,10,2  2010000.0  16037.0  2010000.0  98.0  0.06  99.4  F-20,10,2  2010000.0  8241.0  2020000.0  79.0  0.30  99.0  F-10,10,2*  2018807.1  -  2040000.0  66.0  0.92  -  F-5,10,2  2090000.0  14153.0  2090000.0  72.0  0.17  99.5 99.3  F-2,10,2  2410000.0  13049.0  2390000.0  85.0  -0.57  F-1,10,2*  3190000.0  -  3020000.0  57.0  -5.3  -  F-400,5,4  2090000.0  99.0  2090000.0  23.0  -0.30  76.8  F-200,5,4  2010000.0  102.0  2010000.0  21.0  -0.31  79.4  F-100,5,4  2010000.0  84.0  2010000.0  21.0  -0.31  75.0  F-50,5,4  2010000.0  80.0  2010000.0  8.0  0.00  90.0  F-40,5,4  2010000.0  80.0  2010000.0  6.0  0.00  92.5  F-20,5,4  2020000.0  63.0  2010000.0  5.0  -0.31  92.1  F-10,5,4  2030000.0  64.0  2020000.0  2.0  -0.46  96.9  F-5,5,4  2090000.0  63.0  2080000.0  2.0  -0.29  96.8  F-2,5,4  2400000.0  59.0  2400000.0  1.0  -0.39  98.3  F-1,5,4  3030000.0  61.0  3020000.0  1.0  -0.41  98.4  F-400,10,4  2090000.0  4484.0  2080000.0  61.0  -0.38  98.6  F-200,10,4  2010000.0  2796.0  2010000.0  68.0  0.05  97.6  F-100,10,4  2010000.0  2752.0  2010000.0  48.0  0.05  98.3  F-50,10,4  2010000.0  3477.0  2010000.0  37.0  0.00  98.9  F-40,10,4  2010000.0  3031.0  2010000.0  40.0  0.00  98.7  F-20,10,4  2020000.0  2603.0  2010000.0  32.0  -0.38  98.8  F-10,10,4  2030000.0  2557.0  2030000.0  22.0  0.05  99.1  F-5,10,4  2080000.0  3107.0  2080000.0  17.0  -0.23  99.5  F-2,10,4  2400000.0  2558.0  2390000.0  26.0  -0.17  99.0  F-1,10,4  3020000.0  3627.0  3010000.0  14.0  -0.14  99.6  G-400,5,2  1050000.0  11510.0  1050000.0  83.0  -0.01  99.3  G-200,5,2  1010000.0  12132.0  1010000.0  71.0  -0.01  99.4  G-100,5,2  1010000.0  11710.0  1010000.0  40.0  0.00  99.7  G-50,5,2  1010000.0  11433.0  1010000.0  25.0  0.00  99.8  G-40,5,2  1010000.0  11438.0  1010000.0  32.0  -0.01  99.7  115  Appendix B. Tables b Table B.12: Cost (CR,k,n ) and timing (tbR,k,nz ,nr ) of the basic MILP model, cost z ,nr n n (CR,k,nz ,nr ) and timing (tR,k,nz ,nr ) of the quasi-network-flow model, percent difference in cost (δR,k,nz ,nr ), and percent improvement (ηR,k,nz ,nr ) for the problems (R-k, nz , nr ) of Test configuration 3 (Part-8)  R-k, nz , nr  b CR,k,n z ,nr  tbR,k,nz ,nr  n CR,k,n z ,nr  tn R,k,nz ,nr  δR,k,nz ,nr  ηR,k,nz ,nr  G-20,5,2  1010000.0  11128.0  1010000.0  13.0  0.00  99.9  G-10,5,2  1020000.0  11191.0  1020000.0  9.0  -0.01  99.9  G-5,5,2  1040000.0  11199.0  1040000.0  6.0  0.00  99.9  G-2,5,2  1170000.0  11352.0  1170000.0  5.0  -0.05  100.0  G-1,5,2  1430000.0  12170.0  1430000.0  14.0  0.00  99.9  G-400,10,2*  -  49191.0  1050000.0  750.0  -  -  G-200,10,2*  -  49148.0  1020000.0  595.0  -  -  G-100,10,2*  -  49191.0  1020000.0  374.0  -  -  G-50,10,2*  -  49037.0  1020000.0  482.0  -  -  G-40,10,2*  -  49194.0  1010000.0  249.0  -  -  G-20,10,2*  -  49117.0  1020000.0  228.0  -  -  G-10,10,2*  -  49228.0  1020000.0  231.0  -  -  G-5,10,2*  -  49171.0  1050000.0  230.0  -  -  G-2,10,2*  -  -  1170000.0  225.0  -  -  G-1,10,2*  -  49103.0  1440000.0  194.0  -  -  G-400,5,4  1050000.0  1456.0  1050000.0  48.0  -0.06  96.7  G-200,5,4  1010000.0  1470.0  1010000.0  72.0  0.00  95.1  G-100,5,4  1010000.0  1424.0  1010000.0  39.0  -0.06  97.3  G-50,5,4  1010000.0  1333.0  1010000.0  24.0  -0.05  98.2  G-40,5,4  1010000.0  1338.0  1010000.0  15.0  -0.06  98.9  G-20,5,4  1010000.0  1301.0  1010000.0  9.0  -0.14  99.3  G-10,5,4  1020000.0  1285.0  1020000.0  6.0  -0.13  99.5  G-5,5,4  1040000.0  1291.0  1040000.0  4.0  0.00  99.7  G-2,5,4  1170000.0  1331.0  1160000.0  4.0  -0.11  99.7  G-1,5,4  1430000.0  1256.0  1430000.0  4.0  0.00  99.7  G-400,10,4  1050000.0  4974.0  1060000.0  153.0  0.06  96.9  G-200,10,4  1010000.0  5886.0  1010000.0  122.0  0.07  97.9  G-100,10,4  1010000.0  4909.0  1010000.0  97.0  0.37  98.0  G-50,10,4  1020000.0  5101.0  1010000.0  79.0  -0.08  98.5  G-40,10,4  1020000.0  4919.0  1020000.0  65.0  0.00  98.7  G-20,10,4  1020000.0  5029.0  1010000.0  16.0  -0.39  99.7  G-10,10,4  1020000.0  12360.0  1020000.0  10.0  0.39  99.9  G-5,10,4  1040000.0  5824.0  1040000.0  9.0  0.05  99.8  G-2,10,4*  1187914.5  -  1170000.0  8.0  -1.5  -  G-1,10,4  1430000.0  6594.0  1440000.0  20.0  0.02  99.7  116  

Cite

Citation Scheme:

    

Usage Statistics

Country Views Downloads
United States 45 13
Russia 9 7
China 5 3
Iran 4 0
Ukraine 4 0
Spain 2 0
Canada 2 19
New Zealand 2 0
Denmark 1 0
Netherlands 1 0
Tanzania 1 0
Germany 1 10
Republic of Korea 1 0
City Views Downloads
Ashburn 20 0
Unknown 11 11
Lewes 11 0
Penza 6 6
Beijing 5 2
San Francisco 4 5
Raleigh 4 0
Mountain View 3 0
Moscow 2 0
Khorasan 2 0
Barcelona 2 0
Redmond 2 0
Edmonton 1 0

{[{ mDataHeader[type] }]} {[{ month[type] }]} {[{ tData[type] }]}
Download Stats

Share

Embed

Customize your widget with the following options, then copy and paste the code below into the HTML of your page to embed this item in your website.
                        
                            <div id="ubcOpenCollectionsWidgetDisplay">
                            <script id="ubcOpenCollectionsWidget"
                            src="{[{embed.src}]}"
                            data-item="{[{embed.item}]}"
                            data-collection="{[{embed.collection}]}"
                            data-metadata="{[{embed.showMetadata}]}"
                            data-width="{[{embed.width}]}"
                            async >
                            </script>
                            </div>
                        
                    
IIIF logo Our image viewer uses the IIIF 2.0 standard. To load this item in other compatible viewers, use this url:
http://iiif.library.ubc.ca/presentation/dsp.24.1-0072880/manifest

Comment

Related Items