UBC Community, Partners, and Alumni Publications

Water tank being built Limbu, Bina

Description

The 2015 earthquake damaged water sources and water distribution systems, so new systems had to be installed, sometimes from sources considerable distances away. Taken during the 1st phase of fieldwork conducted by the research team based at Social Science Baha in Kathmandu, Nepal, as part of the SSHRC Partnership Development Grant, ‘Expertise, Labour and Mobility in Nepal’s Post-Conflict, Post-Disaster Reconstruction’. See project details at https://elmnr.arts.ubc.ca/.

Item Citations and Data

Rights

Attribution-NonCommercial-NoDerivatives 4.0 International